Plan Review Notes
Plan Review Notes For Permit 05031185
Permit Number 05031185
Review Stop B
Sequence Number 3
Notes
Date Text
2006-08-20 00:00:00BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 805 6652
 E-MAIL: [email protected]
  
 FBC = FLORIDA BUILDING CODE 2001
 FBC*= FLORIDA BUILD'G CODE (CITY AMEND)
 F.S.= FLORIDA (STATE) STATUTE
  
 SITE PLAN (SHEET A-101) AND FOUNDATION
 PLAN (SHEET S-1) AND DETAIL SHEET (SHEET
 S-2) REVISION FOR ADDITION OF THREE
 STORIES (6TH, 7TH AND 8TH FLOORS) TO THE
 BUILDING.
  
 1) FBC* 104.6THE DECLARED BUILDING
 VALUE SHALL BE INCREASED TO ACCOUNT FOR
 THE THREE ADDITIONAL STORIES AND THE
 STRENGTHENING OF THE
 STRUCTURE/FOUNDATION TO SUPPORT THEM.
 THE PERMIT FEES WILL THEN BE ADJUSTED
 ACCORDINGLY.
  
 2) IMPACT FEES AND RADON FEES.PLEASE
 NOTE THAT ADDITIONAL IMPACT FEES AND
 RADON FEES WILL BE DUE FOR THE INCREASE
 IN BUILDING AREA.
  
 3) FBC 11-4.1.2(5) AND 11-4.6.5SHEET
 A-101, REVISED PARKING TABLE.ANNOTATE
 THE PLAN TO CLARFIY HOW THE PROPOSED
 PARKING STRUCTURE WILL BE USED.IS THE
 PARKING STRUCTURE FOR USE BY VALET ONLY?
 IF SO, THEN AN ACCESSIBLE PASSENGER
 LOADING ZONE COMPLYING WITH FBC 11-4.6.6
 LOCATED ON AN ACCESSIBLE ROUTE TO THE
 BUILDING ENTRANCE IS REQUIRED.
 IF THE PARKING STRUCTURE IS NOT FOR USE
 BY VALET ONLY, PLEASE NOTE THAT EIGHT OF
 THE PROPOSED 146 PARKING SPACES ARE
 SHOWN AS UNCOVERED.SO IT IS ASSUMED
 THAT THE PARKING STRUCTURE WILL PROVIDE
 THE REMAINING SPACES AS COVERED PARKING.
 IN THAT CASE, A PORTION OF THE
 ACCESSIBLE PARKING SPACES SHALL BE IN
 THE PARKING STRUCTURE TO PROVIDE COVERED
 PARKING FOR HANDICAPPED PERSONS.ALSO,
 ONE IN EIGHT (NOT LESS THAN ONE) OF THE
 SPACES IN THE PARKING STRUCTURE SHALL BE
 VAN ACCESSIBLE COMPLYING WITH FBC
 11-4.6.5. ANNOTATE THE PLAN TO CLARFIY
 HOW THE PROPOSED PARKING STRUCTURE WILL
 BE USED.
  
 4)FOUNDATION TYPE.THE PLANS
 PREVIOUSLY SHOWED CONCRETE FOOTINGS FOR
 COLUMNS AND WALLS AND A 4" CONCRETE
 FIRST FLOOR SLAB.THE REVISED SHEET S-1
 NOW INCLUDES A NOTE CALLING OUT A 30"
 THICK CONCRETE MAT FOUNDATION BUT IT
 ALSO STILL SHOWS A NOTE CALLING OUT A 4"
 CONCRETE SLAB. WHAT IS THE FOUNDATION
 FOR COLUMNS TC-3, TC-6, TC-7 ETC AND FOR
 THE SPIRAL STAIRS.ANNOTATE THE PLAN
 AND PROVIDE CROSS SECTION DETAILS TO
 CLARIFY THE EXTENT OF THE MAT FOUNDATION
 AND THEPROPOSED FOUNDATION AND SLAB
 ARRANGEMENT.
  
 5) FBC* 104.2.1SHEET S-2 WAS
 PREVIOUSLY THE MEZZANINE FRAMING PLAN.
 THE DETAILS SHOWN ON THE REVISED SHEET
 S-2 WERE PREVIOUSLY SHOWN ON SHEET S-9.
 IS THAT INTENTIONAL?PLEASE NOTE THAT
 THE NEW VERSION OF S-2 (STRUCTURAL
 DETAILS) WILL REPLACE THE PREVIOUS S-2
 (MEZZANINE FRAMING PLAN) SUCH THAT THERE
 IS NO LONGER A MEZZANINE FRAMING PLAN.
 PLEASE CORRECT OR CLARIFY.
  
 6) FBC* 104.2.1SHEETS S-1 AND S-2.
 WHEN SUBMITTING REVISED PLANS, PLEASE
 USE REVISION MARKERS (AND 'CLOUDS') TO
 CLEARLY SHOW WHAT AREAS HAVE BEEN
 REVISED.
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL INFO
 TELEPHONE: (561) 805 6652ROBERT BROWN
 E-MAIL: [email protected]
  