| 2005-08-06 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | |
| | FROM PREVIOUS REVIEW: |
| | |
| | 1. CALCULATIONS FOR PRIMARY AND |
| | SECONDARY ROOF DRAINS. SHEET P-6 |
| | INDICATES SIZE OF SECONDARY ROOF DRAINS |
| | REQUIRED AS 18 SQ. IN., BUT MINIMUM 22 |
| | SQ. IN. REQUIRED PER SECTION 1107 AND |
| | TABLE 1106.3 IN MOST SECTIONS. A MINIMUM |
| | OF 36 SQ.IN. IS REQUIRED IN SECTIONS 6 |
| | AND 7. - PLEASE RECHECK ALL AREAS AS |
| | SOME AREAS SHOW NO VERTICAL AREAS OR |
| | UPPER ROOF AREAS AND THEY ARE NEXT TO |
| | PARAPET WALLS, BELVEDERE WALLS & ROOFS, |
| | SPA EQUIPMENT OR RESTROOM WALLS, |
| | STAIRWAY WALLS ECT. SHOW ALL WALLS AND |
| | ROOF AREAS THAT DRAIN ONTO ROOFS IN |
| | CALCULATIONS. (SEE CALCULATIONS ATTACHED |
| | FOR AREAS 1 & 2) - SCUPPER SIZES |
| | INDICATED ON SHT P-6 CALCULATIONS STATE |
| | 6"X1.5". THE BUILDING ELEVATIONS |
| | INDICATE THAT THE SCUPPERS WILL BE |
| | CYLINDRICAL AND IF SO PLEASE INDICATE |
| | WHAT THE 1.5" MEASUREMENT IS REFERING |
| | TO. |
| | 8. SHT P-12 WATER HEATER DETAIL. NO T&P |
| | LINES SHOWN ON THE WATER HEATERS. |
| | SECTION 504.5 - BOTTOM FED WATER HEATERS |
| | AND STORAGE TANK SHALL HAVE A VACUUM |
| | RELIEF VALVE INSTALLED AT THE HIGHEST |
| | POINT OF THE WATER INLET. SECTION 504.2 |
| | WATER HEATERS SHALL BE PIPED ACCORDING |
| | TO MANUFACTURES INSTALLATION |
| | INSTRUCTIONS. SECTION 502.1. |
| | |