| Date |
Text |
| 2005-04-22 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | |
| | 1) SHTS A-108, A-109, & P-6 SUBMIT |
| | CALCULATIONS FOR PRIMARY AND SECONDARY |
| | ROOF DRAINS PER SECTIONS 1106 & 1107 AND |
| | ALL SUBSECTIONS. SHOW TOTAL SQUARE |
| | FOOTAGE FOR EACH AREA BEING DRAINED. |
| | SHOW 1/2 AREA OF ALL VERTICAL WALLS |
| | INCLUDING PARAPETS, AND AREAS OF ROOF |
| | THAT DRAIN ONTO THE DIFFERENT AREAS |
| | ADDED TO ROOF AREA IN CALCULATIONS. SHOW |
| | THE LOCATION OF ALL SECONDARY ROOF |
| | DRAINS INCLUDING AREAS THAT ARE NOT |
| | ADJACENT TO THE OUTER WALLS. |
| | 2) SHTS A-103 & P-2. SHT A-103 SHOWS A |
| | STORAGE ROOM, BUT P-2 SHOWS A LAUNDRY - |
| | WATER HEATER ROOM. PLEASE CLARIFY. |
| | SECTION 104.2.1. |
| | 3) SHTS P-1 & P-2. SHT P-1 SHOWS SANT. |
| | RISER #11 UP TO MEZZ. LEVEL, BUT DOES NT |
| | SHOW UP ON P-2. PLEASE CORRELATE PLANS. |
| | SECTION 104.2.1. |
| | 4) SHT P-6 AREAS AROUND THE ENDS OF THE |
| | SPA, WHERE THE SPA HAS BEE REDUCED IN |
| | SIZE, SHALL BE INCREASED TO REFLECT THE |
| | LARGER AREAS TO BE DRAINED. SECTION |
| | 104.2.1. |
| | 5) SHT P-7 SHOWS WATER PIPING TO GROUND |
| | FLOOR LAUNDRY, BUT THIS HAS BEEN DELETED |
| | ON THE FLOOR PLAN. PLEASE DELETE WATER |
| | DETAIL FOR GROUND FLOOR LAUNDRY. SECTION |
| | 104.2.1. |
| | 6) SHT P-7 SANITARY RISER S/8 AND BRANCH |
| | LINE TO RISER ARE NOT SHOWN ON THE BLDG. |
| | DRAIN ISOMETRIC. SECTION 104.2.1. |
| | 8) SHT P-12 WATER HEATER DETAIL. T&P |
| | RELIEF VALVE DISCHARGE LINES SHOW VALVES |
| | |
| | AND ARE TIED TOGETHER AND VALVED PRIOR |
| | TO ENTERING THE STORAGE TANK. THIS IS |
| | NOT APPROVED PER SECTIONS 504.5.1 AND |
| | 504.7.1. - ALSO THE STORAGE TANK SHOWS |
| | NO DISCHARGE PIPING. SHOW THE |
| | TERMINATION POINT FOR RELIEF VALVES.- |
| | BOTTOM FED WATER HEATERS AND STORAGE |
| | TANKS SHALL HAVE A VACUUM RELIEF VALVE |
| | INSTALLED. SECTION 504.2.-WATER |
| | HEATER SHOW NO HOT WATER LINES EXITING |
| | THE HEATERS. - WATER HEATERS SHALL BE |
| | PIPED IN SUCH AN ARRANGEMENT TO SUPPLY |
| | AND DISCHARGE SIMULTANEOUSLY FROM EACH |
| | WATER HEATER. |
| | 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2001 FUEL GAS CODE SEC 402.2 |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |