| 2005-11-18 00:00:00 | ************ UNSAT ************ |
| | |
| | PLEASE SEE SOME NOTES FROM PREVIOUS |
| | REVIEW STILL NEED TO BE ADDRESSED. |
| | PLEASE ALSO SEE NEW NOTES. |
| | |
| | ************************************** |
| | |
| | 1)NOTE: NOTE #1 NO. PLEASE PROVIDE ALL |
| | LIGHT POLE/LIGHT FIXTURE WIND LOADING |
| | INFORMATIONFOR REVIEW AT THIS TIME. |
| | PLEASE SEE MIN FBC 140 MPH. |
| | IF "SITE LIGHTING" WIND LOAD INFORMATION |
| | AND FIXTURE INFORMATION IS NOT PROVIDED |
| | AT THIS TIME, A SEPARATE PERMIT MAY BE |
| | APPLIED FOR AT A LATER DATE. |
| | INFORMATION STILL DO NOT SEEM TO BE |
| | SUBMITTED AND RESPONSE LTR MENTIONS THIS |
| | SHOULD BE DONE BY CONTRACTOR. |
| | PLEASE KNOW, IF THIS INFORMATION SI NOT |
| | DONE A THIS TIME, PLEASE REMOVE AND NOT |
| | PLANS THAT ALL SITE-LIGHTING SHALL BE |
| | UNDER A SEPARATE PERMIT, PLANS AND FEES. |
| | |
| | 2)NOTE: NOTE #2, NO, PLEASE SEE A |
| | CERTIFICATE OF AUTHORIZATION NUMBER WAS |
| | ADDED TO THE TITLE BLOCK FOR EACH TRADE |
| | SHEET, HOWEVER PLEASE SEE PRINT OUT |
| | ATTACHED FROM THE DEPARTMENT OF BUSINESS |
| | AND PROFESSIONAL REGULATION (DBPR) WHICH |
| | SHOWS THE CA # WHICH IS SHOWN ON TITLE |
| | BLOCK LISTED FOR A COMPLETELY DIFFERENT |
| | COMPANY. PLEASE VERIFY AND ADJUST #. |
| | THIS IS REQUIRED FOR ALL SHEETS AND FOR |
| | ALL TRADES WHETHER OR NOT COMMENT IS |
| | MADE BY OTHER REVIEWER(S). |
| | |
| | 3)NOTE: NOTE #3 OK. |
| | |
| | 4)NOTE: NOTE #4 OK. NOTE, RESPONSED |
| | LETTER MENTIONS THIS WAS NOT CLEAR, |
| | HOWEVER THE ITEM WHICH APPEARED TO BE A |
| | "PANEL" IN ROOM 317 WALL WAS REMOVED. |
| | |
| | 5)NOTE: NOTE #5, OK. 0. |
| | |
| | 6)NOTE:NOTE #6, NO, PLEASE SUBMIT ALL |
| | INFORMATION ON FIRE PUMP/ FIRE PUMP |
| | CONTROLLER. |
| | PLEASE SUBMIT MANUFACTURES SPEC/CUT |
| | SHEETS FOR BOTH. |
| | PLEASE SEE NO SUBMITTIALS/SPECS/ CUT |
| | SHEETS COULD BE LOCATED. |
| | SERVICE ENTRNCE RATED ETC |
| | PLEASE SEE NFAP-70 695, NFPA-20 10.4.2.1 |
| | AND 10.4.2.2,10.1.2.5.1,230.76,230.79 |
| | ETC WHICH NEEDS TO BE VERIFIED BY SPEC |
| | SHEETS ALSO. |
| | PLEASE LABEL TYPE OF BRKER FOR OCP AT |
| | GEN AND BRKR DISCONNECT FOR FIRE PUMP. |
| | IS THE BRKR TYPE MAG ONLY? |
| | PLEASE KNOW: IF ALL OF THE ABOVE |
| | INFORMATION IS NOT SUBMITTED ALL WOULD |
| | BE REQUIRED UNDER SEPARATE PERMIT, PLANS |
| | AND FEES. |
| | PLEASE ALSO SEE THAT NO INFORMATION WAS |
| | SUBMITTED FOR FUEL TANK, SIZE, LISITNG |
| | ETC. |
| | PLEASE SEE NFPA-20 WHICH REQUIRES A |
| | MININUM OF 8HRS. 9.6,9.6.2.2 |
| | |
| | 7)NOTE: NOTE #7 OK. |
| | |
| | 8)NOTE: NOTE#8 OK.L |
| | |
| | 9)NOTE: NOTE #9 YES/NO,PLEASE SEE |
| | SPECIFIC INFORMATION FOR TYPE AND SIZE |
| | OF GEN IS INIDICATED ON PLANS, HOWEVER |
| | PLEASE SUBMIT MANUFACTURE SPEC SHEETS |
| | FOR GEN/ ATS/ GEN SUB-BASE FUEL TANKS |
| | ETC. |
| | PLEASE SEE PREVIOUS NOTE WITH RESPECT TO |
| | FUEL TANK AND RUNNING LOAD AND HRS. |
| | PLEASE SEE ATS FEED AND OCP IS NOW SHOWN |
| | AT 200A'S. PLEASE SEE RISER DIAGRAM |
| | STILL SHOWS PANEL "EM" AS 100A WHEN |
| | PANEL SCHEDULE FOR EM HAS BEEN INCREASED |
| | TO 150AS'. |
| | PLEASE ALSO SEE PANEL CR IS STILL SHOWN |
| | AT 125A ON RISER , YET CR PANEL SCHEDULE |
| | SHOWS 150A'S. |
| | |
| | 10)NOTE: NOTE #10 PLEASE SEE 695.3, |
| | NFPA-20 9.3.2.2.3.2(B) THE MAIN OR ANY |
| | OTHER POWER SUPPLY MEANS OF |
| | DISCONNECT/OCP FOR FIRE PUMP SHOULD NOT |
| | BE LOCATED IN THE SAME ROOM AS NORMAL |
| | MAINS OR POWER. ANY FIRE/EXPOSION THAT |
| | MAY AFFECT THE ABILITY TO POWER FIRE |
| | PUMP OR ANY POSSIBLE DISRUPTION IN AN |
| | INADVERTANT SHUTTING DOWN OF MAINS OR |
| | EQUIPMENT. |
| | PLEASE FIND THE SPACE NEEDED FOR THIS OR |
| | THE POSSIBILTY OF GENERATOR CONTAINING |
| | TWO BREAKERS FOR POWER FEEDS. |
| | |
| | 11)NOTE:NOTE#11 OK. |
| | |
| | 12)NOTE: NOTE #12 NO,PLEASE SEE NOTE #1 |
| | ON E4.10 ELECTRICAL NOTES MENTIONS, |
| | "MAIN CIRCUIT BREAKERS IN PANELS MDLP1, |
| | MDAH, AND MDH BOARDS SHALL BE "GROUND |
| | FAULT PROTECTED"?? |
| | PLEASE VERIFY THIS ? PLEASE SEE |
| | 240.13,230.95 ETC WHEN GROUND FAULT |
| | PROTECTION IS REQUIRED. THIS IS STILL IN |
| | QUESTION. PLEASE EXPLAIN IN RESPONSE |
| | LTR AS TO THE RATIONALE FOR REQUIRING |
| | THESE MAINS TO BE GF PROTECTED. |
| | |
| | 13)NOTE: NOTE #13 NO, PLEASE SHOW LOAD |
| | CALCULATIONS, PLEASE SHOW PER 220.3 |
| | ,220.10, 220.11 ,220.13 ETC. |
| | PLEASE ALSO SHOW ALL CONTINOUS LOADS |
| | AT 125% PER 215.3,230.42 |
| | REQUESTED ON PREVIOUS REVIEW. |
| | PLEASE SEE RESPONSE MENTIONS LOAD |
| | CALCUALTIONS ON EACH PANEL, HOWEVER SOME |
| | PANELS WERE REVISED TO SHOW SOME |
| | MODIFICATION, BUT NOT FULL LOAD |
| | CALCULATIONS. |
| | PLEASE ALSO SEE A LOAD CALCULATION FOR |
| | MAIN SERVICES ARE NOT CLEAR WHERE THESE |
| | ARE LOCATED. |
| | |
| | 14)NOTE: NOTE #14 NO,PLEASE SHOW OR NOTE |
| | ALL TRACK LIGHTING CALCULATIONS PER |
| | 220.12 |
| | REQUESTED ON PREVISOU REVIEW AND FIRST |
| | REVIEW. |
| | RESPONSE LTR MENTIONS CORRECT VA FOR TRK |
| | LTS CIRCUITS, HOWEVER THIS INFORMATION |
| | AND/OR LOADS COULD NOT BE FOUND ON |
| | PLANS. |
| | |
| | 15)NOTE: NOTE #15 OK. |
| | |
| | 16)NOTE: NOTE #16 OK. |
| | |
| | 17)NOTE: NOTE #17 YES, HOWEVER PLEASE |
| | SEE THE NOTES BELOW. |
| | PLEASE KNOW THE FOLLOWING MAY BE SET UP |
| | AS A "PROVISO", BUT MAY BE ADDRESSED NOW |
| | SINCE PLANS ARE CMOING BACK FOR OTHER |
| | COMMENTS. |
| | PLEASE PROVIDE PHOTOMETRICS FOR |
| | COORIDORS AND EGRESS STAIRS PER 7.8.1.3. |
| | PLEASE SEE NFPA-101 WHICH NOW REQUIRES |
| | 10FT CANDLES IN STAIR AREAS. |
| | THIS WAS IN AFFECT AS OF JAN 1ST, 2005. |
| | PLEASE SEE THAT A BATTERY BACK UP |
| | FIXTURE OF SOME TYPE WILL ALSO BE |
| | REQUIRED IN STAIRS TO PROVIDE A MIN OF 1 |
| | FT CANDLE UNDER EMERGENCY CONDITIONS. |
| | ALTERNATING CIRCUITING IS ALREADY SHOWN |
| | FOR STAIRWELLS, HOWEVER AS REFERENCED LS |
| | 101 7-9.2.2(2) THE SHUTTING DOWN OF A |
| | SINGLE MEANS OF DISCONNECT UNDER ME |
| | POWER OR TRIPPING OF EM MAIN WILL LEAVE |
| | EGRESS AREAS IN TOTAL DARKNESS. |
| | PLEASE KNOW THAT A BATTERY BACK UP LT |
| | FIXTURE WILL BE REQUIRED IN EELECTRICAL |
| | RM, ELEVATOR MACH RM, AND FIRE PUMP RM. |
| | |
| | 18)NOTE: NOTE #18 OK. |
| | |
| | *** PLEASE KNOW, ONLY REQUIREMENTS OF |
| | NOTE:17 MAY BE DONE AS A "PROVISO". |
| | |
| | PLEASE SEE POSSIBLE NOTES FROM OTHER |
| | REVIEWERS WHICH MAY AFFECT ELECTRICAL |
| | PLANS. |
| | |
| | PLEASE SEE THERE MAY BE FURTHER COMMENTS |
| | SINCE NOT ALL INFORMATION WAS SUBMITTED |
| | FOR REVIEW. |
| | |
| | PLEASE REVMOVE ALL OLD/VOIDED SHEETS AND |
| | ONLY INSERT NEW REVISED SHEETS INTO |
| | COMPLETE SETS FOR REVIEW AND STMAPING. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE TO CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | CITY OF WEST PALM BEACH |
| | CONSTUCTION SERVICES DEPT. |
| | 561-805-6717 |
| | [email protected] |
| | |
| | |
| 2005-11-17 00:00:00 | PLANS IN ELECTRICAL FOR REVIEW. |