| 2005-04-21 00:00:00 | DENIED |
| | |
| | |
| | 1) THE AREA TABLE ON SHEET T1 IS |
| | INCORRECTLY LABELED 8 UNIT BUILDING. |
| | |
| | 2) ENERGY CALCS. WERE SUBMITTED FOR A |
| | 2215 SQFT MID UNIT. THE MID UNITS FOR |
| | THIS BUILDING ARE 1448 SQFT. PLEASE |
| | REMOVE THE INCORRECT CALCS. |
| | |
| | 3) THE GR3 TRUSS IS INDICATED AS A TWO |
| | MEMBER TRUSS ON THE TRUSS DRAWINGS AND A |
| | FOUR MEMBER TRUSS ON S4 OF THE PLANS. |
| | |
| | 4) THE CONNECTOR SCHEDULE ON S4 LISTS A |
| | SIMPSON HDSA. SHOULD THIS BE A HD5A? |
| | INDICATE HOW THE UPLIFT VALUE FOR THIS |
| | CONNECTOR WAS DETERMINED. |
| | |
| | 5) SPECIFY THE CONNECTORS FOR THE GR2 |
| | TRUSSES AT THE INTERIOR WALLS. |
| | |
| | 6) CLARIFY THAT DETAIL 10/S7 IS FOR ROOF |
| | TRUSSES, IN ADDITION TO THE FLOOR |
| | TRUSSES. |
| | |
| | 7) THE REQUIRED UPLIFTS GIVEN IN THE |
| | TRUSS DRAWINGS FOR THE MG1 TRUSSES |
| | EXCEED THE CAPACITY OF THE SPECIFIED |
| | CONNECTORS. |
| | |
| | 8) SUBMIT THE MIAMI-DADE NOA |
| | (INSTALLATION INSTRUCTIONS) FOR THE ONE |
| | HOUR FIRE RATED GLASS BLOCK. |
| | |
| | 9) SUBMIT THE INSTALLATION INSTRUCTIONS |
| | FOR THE ASPHALT ROOF SHINGLES. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |