| 2005-12-21 00:00:00 | ********* UNSAT ********* |
| | |
| | 1)NOTE: PLEASE SEE THERE HAVE BEEN MAJOR |
| | CHANGES IN THE SCOPE OF ELECTRICAL WORK |
| | AND OTHER REMODEL WORK DONE FOR |
| | DWELLING. |
| | PLEASE SEE FBC ADMINSTRATIVE 104.6.5 |
| | WHICH REQUIRES A MAJOR ADJUSTMENT IN |
| | VALUATION OF PERMITTING. |
| | PLEASE SEE ORIG WAS INCLUSIVE OF SOME |
| | REMODEL AND ADDITION WORK AT $130,000 |
| | PLEASE ADJUST. |
| | PLANS ARE NOW INDICATING THE ENTIRE |
| | HOUSE BEING REWIRED. |
| | |
| | 2)NOTE:PLEASE SEE SOME RECEPTS NOW |
| | MISSING DUE TO SOME WALL CHANGES.210.52 |
| | |
| | 3)NOTE: PLEASE BE SURE TO DOUBLE CHECK |
| | KITCHEN COUNTERSPACE AS SOME SPACING |
| | SEEMS TO REQUIRE ADDITIONAL |
| | RECEPTS.210.52C1 |
| | |
| | 4)NOTE: PLEASE SEE CU'S HAVE NOW BEEN |
| | MOVED TO SIDE OF DWELLING, HOWEVER A NEW |
| | GFI RECEPT WAS NOT ADDED FOR CU'S AS |
| | REQUIRED PER 210.63 |
| | |
| | 5)NOTE: PLEASE SEE SD IN MASTER BEDRM |
| | SHALL BE MOVED TO BE LOCATED WITHIN 3' |
| | OF THE PEAK OF THE SLOPED CEILING AS |
| | REQUIRED UNDER NFPA-72 11.8.3.5 |
| | PLEASE SEE THIS WAS NOT NOTICED ON |
| | PREVIOUS REVIEW, HOWEVER STILL IS |
| | REQUIRED TO MEET CODE COMPLIANCE. |
| | |
| | 6)NOTE: PLEASE SEE COMPLETE CHANGE IN |
| | ELECTRICAL SERVICE HAS NOW CREATED SOME |
| | ELECTRICAL COMMENTS: |
| | |
| | A)PLEASE SEE RISER DIAGRAM AS IT SHOWS A |
| | 200A DISCONNECT FEEDING THE 200A PANEL |
| | WITH 3-#1'S ETC. |
| | |
| | B)PLEASE SEE CONDUCTORS TO POOL PANEL |
| | ARE NOW SHOWN AS 3/0'S?? |
| | BOTH SEEM TO BE A MIX-UP OF SORTS, |
| | PLEASE CORRELATEAND ADJUST. |
| | 310.16,240.4 |
| | |
| | C)PLEASE SEE MISSING EQUIPMENT GROUNDING |
| | CONDUCTORS FROM METER/MAIN UP TO MAIN |
| | HOUSE. 250.32 |
| | PLEASE ALSO SEE MISSING GROUNDING |
| | ELECTRODE SYSTEM AT MAIN HOUSE, SINCE |
| | SERVICE IS NOW MOVED. |
| | |
| | D)PLEASE SEE METER/MAIN IS SHOWN AS |
| | 400A, AND THERE IS NO INDICATION OF THE |
| | OCP PROVIDED FOR SUB-PANEL FEEDERS TO |
| | MAIN HOUSE OR ANY OTHER BRANCH BRKRS. |
| | 240.4,310.16 ETC. |
| | PLEASE ALSO VERIFY GUEST HOUSE BEING |
| | SHOWN WITH A MAIN DISCONNECT AND |
| | SUB-PANEL, AS IT IS SHOWN ON RISER BEING |
| | FED FROM THE METER MAIN PANEL AT GUEST |
| | HOUSE BLDG ALREADY? |
| | DISC? |
| | |
| | E)PLEASE ALSO VERIFY THE PANELS INSIDE |
| | THE MAIN HOUSE AS BOTH ARE SHOWN WITH |
| | MCB'S WHICH ARE PERMITTED ALTHOUGH NOT |
| | REQUIRED. THIS IS ONLY A NOTE AND NO |
| | CHNAGE IS NEEDED. PLEASE KNOW, IF SHOWN |
| | AS MCB , THEN THESE WILL BE REQUIRED. |
| | |
| | F)PLEASE SEE PANEL "C" AS THIS PANEL |
| | SCHEDULE SHOWS THE OCP AND FEED FOR |
| | GUEST HOUSE PANEL.?? |
| | PLEASE CORRELATE WITH THE ABOVE NOTES |
| | AND PLANS. |
| | |
| | 7)NOTE: PLEASE INDICATE THE GFI |
| | PROTECTION REQUIRED FOR SPA/JACUZZI AT |
| | MASTER BATH. THIS WAS REDLINED ON |
| | PREVIOUS PLANS. |
| | 680.71 |
| | |
| | 8)NOTE: PLEASE SEE WHAT APPEARS TO BE |
| | SWITCHED RECEPTS IN A ROOM WITHOUT ANY |
| | MEANS OF CONTROL. |
| | |
| | 9)NOTE: PLEASE PROVIDE ALL ROOM AND AREA |
| | DESIGNATIONS ON PLANS. |
| | |
| | 10)NOTE: PLEASE SEE BLDG AND ZONING |
| | COMMENTS AS BLDG ELECTRICAL AND ZONING |
| | CHANGES ON SITE PLANS, AND DETAILED SITE |
| | PLAN WILL BE REQUIRED TO BE DONE UNDER |
| | SEPARATE PERMITS FOR FENCE/GATES, |
| | FOUNTAIN, ETC. SEE OTHER REVIEWERS |
| | NOTES. |
| | ELECTRIC FOR GATES , LTS ETC SHALL BE ON |
| | SEPARATE PLANS AND PERMITS. PLEASE KNOW, |
| | WHEN SUBMITTING FOR ELECTRICAL FOR |
| | GATES, SUPPLY ANY GATE CONTOLLER |
| | SPEC/CUT SHEETS AND BE SURE THEY CONTAIN |
| | A LISTING FROM A NRTL. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE IN CONTACTING |
| | THIS OFFICE. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |
| | |
| | |