| Date |
Text |
| 2005-02-22 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | |
| | 1) PLANS SHALL BE ROUTED TO FDBR, |
| | DIVISION OF BUSINESS REGULATION, HOTEL |
| | AND RESTURANT DIVISION FOR REVIEW. |
| | RESUBMIT WITH EACH SET OF PLANS STAMPED, |
| | AND WORK SHEETS ATTACHED. SECTION |
| | 101.4.7. |
| | 2) GREASE INTERCEPTORS SHALL BE SIZED BY |
| | RODNEY COMPO, ENVIRONMENTAL COMPLIANCE, |
| | WASTE ORD. #2838-96. (561) 837-4074 OR |
| | FAX (561) 659-7458. SUBMIT WORK SHEET |
| | FORM MR. COMPO WITH PLANS WHEN |
| | RESUBMITTING. |
| | 3) SHT P-1 FLOOR PLAN FOR GREASE PIPING |
| | SHOWS THE FIRST FLOOR DRAIN AS "WC-3" |
| | NOT "FD" PLEASE CORRELATE RISER DIAGRAM |
| | AND FLOOR PLAN. |
| | 4) SHT P-1 FLOOR PLAN AND GREASE PIPING |
| | ISOMETRIC. FS-1, (INDIRECT WASTE FROM |
| | ITEM #7) AND FD-2 SHALL CONNECT TO THE |
| | VENTED DRAIN LINE SEPARATELY. SECTION |
| | 912.2.4. |
| | 5) SHT P-2 SECTION 606.1(4) FULL OPEN |
| | VALVES ARE REQUIRED ON THE TOP OV EVERY |
| | WATER DOWN-FEED PIPE. |
| | 6) SHT P-2 THE FOLLOWING INFORMATION IS |
| | REQUIRED FOR GAS PLANS/PERMIT: |
| | A. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2001 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | I. EMERGENCY HOOD SHUT DOWN SHUT OFF |
| | VALVE TO BE BELOW CEILING. MANUAL SHUT |
| | OFF VALVE TO BE UPSTREAM. UNION TO BE |
| | DOWN STREAM OF MANUAL VALVE. THESE |
| | VALVES AND UNIONS SHALL BE SHOWN ON THE |
| | GAS RISER DIAGRAM. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |