| Date |
Text |
| 2005-01-06 00:00:00 | DENIED: |
| | 1.REFERENCE FS 471, HVAC WORK THAT IS |
| | GREATER THAN $50,000, GREATER THAN 15 |
| | TON SYSTEM WHICH IS DESIGNED TO |
| | ACCOMMODATE FOR THAN 100 PEOPLE, THIS |
| | WILL REQUIRE PLANS PREPARED BY A |
| | REGISTERED ENGINEER. |
| | |
| | 2.PER FBC(M)1202.3, MATERIALS SHALL BE |
| | RATED FOR THE OPERATING TEMPERATURE & |
| | PRESSURE OF THE HYDRONIC SYSTEM. |
| | MATERIALS SHALL BE SUITABLE FOR THE TYPE |
| | OF FLUID IN THE HYDRONIC SYSTEM. |
| | |
| | 3.PROVIDE MANUFACTURER'S SUBMITTAL |
| | DATA AND INSTALLATION INSTRUCTIONS |
| | APPLICABLE TO "LOW TEMPERATURE" |
| | INSTALLATIONS. |
| | |
| | 4.PER 2001 AMENDMENTS TO THE FBC |
| | 104.2.1.2, THE BUILDING OFFICIAL MAY |
| | REQUIRE DETAILS & COMPUTATIONS AND OTHER |
| | DATA NECESSARY TO ACCOUNT FOR THE |
| | INSTALLATION AND THE BASIS OF |
| | CALCULATIONS.ALL SPECIFICATIONS SHALL |
| | BE PREPARED BY AN ENGINEER OR |
| | ARCHITECT. |
| | |
| | 5.PROVIDE SPECIFIC INFORMATION AS TO |
| | THE SCOPE OF WORK AND DESIGNATE NEW FROM |
| | EXISTING. |
| | |
| | 6.PLEASE PROVIDE EQUIPMENT SCHEDULE. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |
| | CONTACT PATTY KRAUSS AT (561)805-6719. |
| | |
| | |