| Date |
Text |
| 2005-01-25 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 CHAPTER 1 |
| | NFPA 99 |
| | NFPA 54 |
| | |
| | 1) MORE INFORMATION IS REQUIRED. |
| | INDICATE THE USE OF THE GASES. SECTION |
| | 104.2.1. |
| | 2) SHT PO.1 GENERAL GAS NOTES INDICATES |
| | THAT ALL GAS LINES SHALL BE 1/8" BUT |
| | THE |
| | FITTINGS SHALL BE 7/8" SWEAGLOCK. |
| | PLEASE |
| | CLARIFY. SECTION 104.2.1. (ALSO SEE SHT |
| | P5.1 RISER DIAGRAM SHOWS 1/2" PIPE). |
| | 3) SHT P0.1 GENERAL GAS NOTES REFERENCES |
| | NFPA 54 WHICH IS FOR NATURAL GAS. PLEASE |
| | INDICATE WHERE THE NATURAL GAS SYSTEM IS |
| | LOCATED AND SHOW PIPING DIAGRAM FOR THIS |
| | SYSTEM. MORE COMMENTS MAY FOLLOW WITH |
| | THE RESPONSE FROM THIS COMMENT. |
| | 4) INDICATE THE AMOUNT AND TYPE OF GAS |
| | STORED ON THE JOBSITE. SECTION 104.2.1. |
| | 5) SHT P2.1 NOTES INDICATE (3) LINES |
| | FROM HELIUM, NITROGEN, AND ACETLYENE |
| | TANKS, - (2) LINES FROM ARGON AND |
| | NITROGEN TANKS, - (4) LINES FROM ARGON, |
| | BUT SHT P5.1 SHOWS 4 LINES, 1EA FROM |
| | ARGON, HELIUM, ACETYLENE, & NITROGEN TO |
| | EACH VALVE BOX. PLEASE CLARIFY. |
| | 6) PLEASE INDICATE WHERE THE AIR AND |
| | CH4 |
| | GAS IS PIPED TO. THIS IS NOT INDICATED |
| | ON THE PLANS. SECTION 104.2.1. |
| | 7) SUBMIT MSDS SHEETS FOR ALL HAZARDOUS |
| | MATERIALS STORED AND/OR USED ON THE JOB |
| | SITE. SECTION 104.2.1. |
| | 8) STH P5.1 SUBMIT A DETAIL FOR THE |
| | VENTING FOR THE GAS TANK STORAGE ROOM. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |