| Date |
Text |
| 2005-03-28 00:00:00 | CHECKLIST: |
| | 1- SPECIFY ROOF TILE FASTENING. THIS IS |
| | THE DESIGNER OF RECORD RESPONSIBILITY, |
| | NOT THE BUILDER. SEE SEC. 104.2.1.1. |
| | CITY AMENDMENTS TO FBC 2001. |
| | |
| | 2- UPDATE TRUSS ANCHOR SCHEDULE. SEE |
| | LATEST CATALOGUE. PROVIDE COMPLETE |
| | ENGINEERING CALCS FOR TYPE AND NUMBER OF |
| | FASTENERS THAT DIFFER FROM THOSE TESTED |
| | AND PUBLISHED BY MANUFACTURER. |
| | **NOTE: CALCULATIONS TO COMPLY WITH SEC. |
| | 1609.4.3 FBC 2001. |
| | |
| | 3- STORM SHUTTERS INFORMATION WAS NOT |
| | CHANGED FROM PREVIOUS CHECKLIST: |
| | A) NEED ENGINEER'S ORIGINAL SEAL, |
| | SIGNATURE AND DATE AS REQUIRED BY |
| | GENERAL NOTE #6. |
| | B) KEY PLAN DOESN'T MATCH PLANS. |
| | C) CLEARLY INDICATE ON DWGS INSTALLATION |
| | SCHEDULESPECIFIC MOUNTING CONDITIONS |
| | AND ANCHOR TYPE AND SPACING TO BE USED |
| | ACCORDING TO THE DESIGN PRESSURES, EDGE |
| | DISTANCE, PANEL SPAN, CONNECTION TYPE |
| | AND STRUCTURE TO BE ATTACHED TO (MASONRY |
| | OR CONCRETE). |
| | |
| | 4- ENERGY CALCULATIONS: A) A/C AREA |
| | DOESN'T MATCH PLANS. THESE PLANS INCLUDE |
| | ADDITIONAL SITTING AREA. |
| | B) COMPLETE ALL INFORMATION ON TOP OF |
| | FORM. INCLUDING PROJECT ADDRESS, ETC. |
| | |
| | 5- CLARIFY IF USING FLUSH STEEL DOOR AT |
| | ENTRY. ARCHITECT'S ELEVATION SHOW GLASS |
| | DOORS. PROVIDE PRODUCT APPROVAL THAT |
| | MATCHES DOOR. |
| | |
| | 6- NOTICE OF COMMENCEMENT IS EXPIRED |
| | AFTER 90 DAYS. NEED RE-RECORDED N.O.C. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| | JULIO GOMEZ AT (561)805-6712. |