| Plan Review Notes For Permit 04121827 |
| Permit Number |
04121827 |
|
| Review Stop |
E |
| Sequence Number |
6 |
|
| Notes |
| Date |
Text |
| 2006-04-13 00:00:00 | ** UNSAT ** | | | | | | PLEASE SEE SOME NOTE FROM PREVIOUS | | | REVIEW WHICH ARE STILL IN NEED OF | | | CORECTING. | | | PLEASE SEE NOTES BELOW ARE TAKEN | | | DIRECTLY FROM PREVIOUS REVIEW. | | | | | | *********** UNSAT ***************** | | | | | | | | | 1) NOTE: OK | | | | | | 2) NOTE: OK. | | | | | | 3) NOTE: OK | | | | | | 4) NOTE:NO, PLEASE SEE SIZE HAS NOT | | | INCREASED AND PLEASE SEE MULTIPLE | | | LOCATIONS OF ATTACHMENT SHOWN ON RISER.. | | | PLEASE SEE 250.6,250.24B. | | | | | | ** PRE-NOTE** | | | PLEASE SEE THE EXISTING | | | GROUNDING ELECTRODE CONDUCTOR IS NO | | | LONGER LARGE ENOUGH DUR TO THE INCREASE | | | OF SERVICE. PLEASE SEE TABLE IN250.66 | | | AND ADJUST. | | | | | | 5)NOTE: OK. | | | | | | 6) NOTE: OK | | | | | | 7) NOTE: OK. | | | | | | 8) NOTE:NO, PLEASE SEE NO CHANGE WAS | | | MADE TO THE KVA LOADS ON PANEL SCHEDULE | | | OR IN LOAD CALCS. | | | | | | ** PRE- NOTES** | | | PLEASE SEE 100A BRKR IS BEING | | | SHOWN FOR NEW ELECTRIC TANKLESS UNIT, | | | HOWEVER THE LOAD IS SHOWN AS 1.2VA PER | | | PHASE AND IS NOT SHOWN IN LOAD CALCS. | | | THIS WILL GREATLY AFFECT LOAD CALCS. | | | 215.5, 220 | | | | | | 9) NOTE: OK | | | | | | 10) NOTE: OK | | | | | | 11) NOTE: | | | | | | 12) NOTE: | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS, | | | PLEASE DO NOT HESITATE IN CONTACTING | | | THIS OFFICE. | | | | | | DEWEY PALMER | | | ELECTRICAL PLANREVIEW | | | 561-805-6717 | | | [email protected] | | | | | | |
|