| 2005-01-20 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | |
| | 1) GREASE INTERCEPTORS SHALL BE SIZED BY |
| | RODNEY COMPO, ENVIRONMENTAL COMPLIANCE |
| | PER WASTE ORD. #2938-96. (561) 837-4074 |
| | 2) SHT A2.0 EQUIPMENT SCHEDULE #3 NOT |
| | FOUND ON THE FLOOR PLAN. PLEASE CLARIFY |
| | SECTION 104.2.1. |
| | 3) SHT A2.0 FIRST FLOOR PLAN. RED LINE |
| | MARKINGS FROM THE FDBR HOTEL AND |
| | RESTURANT DIV. INDICATES THAT 2 NEW HAND |
| | SINKS ARE REQUIRED AND ONE OTHER HAND |
| | SINK SHALL BE DELETED. PLEASE REVISE |
| | SHT |
| | A2.0 SHOWING THESE REQUIREMENTS. |
| | RESUBMIT STAMPED SHEET A2.0 WITH NEW |
| | SHT |
| | A2.0 AND INDICATE ON SHEET FOR DBPR |
| | STAMP ONLY. |
| | 4) RPZ BACKFLOW IS REQUIRED ON THE WATER |
| | SERVICE. SECTION 608.13.2. |
| | 5) SHTS P2.1, P5.1, & P5.2 DO NOT SHOW |
| | NEW HAND SINKS REQUIRED BY DBPR, NOR DO |
| | THEY SHOW THE HAND SINK DELETED BY DBPR. |
| | PLEASE REVISE AS REQUIRED. SECTION |
| | 104.2.1. |
| | 6) SHT P5.1 GAS RISER DIAGRAM. THE |
| | FOLLOWING INFORMATION IS REQUIRED FOR |
| | THE REQUIRED GAS PERMIT: |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2001 |
| | FUEL GAS CODE. |
| | B. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2001 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | C. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2001 FUEL GAS CODE SEC 402.2 |
| | D. EMERGENCY HOOD SHUT DOWN SHUT OFF |
| | VALVE TO BE BELOW CEILING. MANUAL SHUT |
| | OFF VALVE TO BE UPSTREAM. UNION TO BE |
| | DOWN STREAM OF MANUAL VALVE. |
| | 7) SHT P6.2 WATER FILTER FOR ICE MAKER |
| | SHALL COMPLY WITH NSF-42. PLEASE SUBMIT |
| | MANUF. SPECIFICATION SHEET SHOWING |
| | COMPLIANCE. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |