2005-06-09 00:00:00************* UNSAT *****************
  
 1)NOTE: PLEASE SEE MISSING LICENSE
 INFORMATION ON TITLE BLOCK FOR ARCH
 FIRM. PER FAC 61G1-16.004, FS 481.219.
 PLEASE ALSO SEE MISSING INFORMATION
 REQUIRED ON ELECTRICAL ENGINEERING TITLE
 BLOCK PER FAC 61G15-23.002, FS 471.023
 PLEASE SEE THIS INFORMATION IS REQUIRED
 ON ALL SHEETS AND FOR ALL TRADES
 WHEATHER OR NOT COMMENTS IS MADE BY
 OTHER REVIEWER(S).
  
 2)NOTE: PLEASE SEE PANEL EM IS REQUIRED
 TO HAVE A MCB AND SHALL BE LABELED WITH
 THE PROPER SIGNAGE AS REQUIRED UNDER
 702.8
 PLEASE SEE MCB REQUIRED PER
 225.31-225.36.
  
 3)NOTE: PLEASE PROVIDE ALL MANUFACTURE
 SPECS/CUT SHEETS FOR GENERATOR, AT,
 STATUS PANEL.
 PLEASE ALSO PROVIDE PRIME MOVER
 INFORMATION. IF ANY KIND OF FUEL TANK
 SYSTEM IS TO BE INSTALLED, THEN SPECS
 FOR FUELSTORAGE MUST ALSO BE SUBMITTED
 FOR REVIEW BY FIRE/MECH.
 PLEASE SEE ALL EQUIPMENT/DISC/ATS ETC
 MUST MEET 225.36 .
  
 4)NOTE: PLEASE CALRIFY SIZE OF OCP , AWG
 FOR LIGHTING CIRCUIT INDICATED AS
 1P-30A'S-1P40A BRKRS???
 PLEASE SHOW CONDUCTOR SIZES.
 240.4,310.16 ETC.
  
 5)NOTE: PLEASE PROVIDE INFORMATION ON
 WHEATHER THERE IS NEW OR EXSITNG
 MEETING:
 *620.23 A SEPARATE BRANCH CIRCUIT SHALL
 SUPPLY THE MACHINE ROOM OR CONTROL
 ROOM/MACHINERY SPACE OR CONTROL SPACE
 LIGHTING AND RECEPTACLE(S).
  
 *620.24,A SEPARATE BRANCH CIRCUIT SHALL
 SUPPLY THE HOISTWAY PIT LIGHTING AND
 RECEPTACLE(S).
 REQUIRED LIGHTING SHALL NOT BE CONNECTED
 TO THE LOAD SIDE OF A GROUND-FAULT
 CIRCUIT INTERRUPTER.THE LIGHTING SWITCH
 SHALL BE LOCATED SO AS TO BE READILY
 ACCESSIBLE FROM THE PIT ACCESS DOOR.
 AT LEAST ONE 125-VOLT, SINGLE-PHASE,
 DUPLEX RECEPTACLE SHALL BE PROVIDED IN
 THE HOISTWAY PIT.
  
 *700.16, PLEASE PROVIDE INFORMATION ON
 FIXTURE TYPE.EMERGENCY ILLUMINATION
 SHALL INCLUDE ALL REQUIRED MEANS OF
 EGRESS LIGHTING, ILLUMINATED EXIT SIGNS,
 AND ALL OTHER LIGHTS SPECIFIED AS
 NECESSARY TO PROVIDE REQUIRED
 ILLUMINATION.
 EMERGENCY LIGHTING SYSTEMS SHALL BE
 DESIGNED AND INSTALLED SO THAT THE
 FAILURE OF ANY INDIVIDUAL LIGHTING
 ELEMENT, SUCH AS THE BURNING OUT OF A
 LIGHT BULB, CANNOT LEAVE IN TOTAL
 DARKNESS ANY SPACE THAT REQUIRES
 EMERGENCY ILLUMINATION.
 WHERE HIGH-INTENSITY DISCHARGE LIGHTING
 SUCH AS HIGH- AND LOW-PRESSURE SODIUM,
 MERCURY VAPOR, AND METAL HALIDE IS USED
 AS THE SOLE SOURCE OF NORMAL
 ILLUMINATION, THE EMERGENCY LIGHTING
 SYSTEM SHALL BE REQUIRED TO OPERATE
 UNTIL NORMAL ILLUMINATION HAS BEEN
 RESTORED.
 * 700.12E THE BRANCH CIRCUIT FEEDING THE
 UNIT EQUIPMENT SHALL BE THE SAME BRANCH
 CIRCUIT AS THAT SERVING THE NORMAL
 LIGHTING IN THE AREA AND CONNECTED AHEAD
 OF ANY LOCAL SWITCHES.THE BRANCH CIRCUIT
 THAT FEEDS UNIT EQUIPMENT SHALL BE
 CLEARLY IDENTIFIED AT THE DISTRIBUTION
 PANEL.
  
 6)NOTE:PLEASE PROVIDE GROUNDING
 ELECTRODE CONDUCTOR SIZES PER 250.66
 NO SIZES ARE SHOWN.
  
 7)NOTE: PLEASE SEE THERE ARE MANY NOTES
 ON "RISER DIAGRAM NOTES" WHICH MENTION
 TO SEE GROUNDING DETAIL, HOWEVER PLEASE
 SEE PREVIOUS COMMENT AND PLEASE SEE FBC
 104.2.1, WHICH STATES THE CODE SHALL NOT
 BE QUOTED IN WHOLE OR IN-PART.
 PLEASE SEE NOTE #19 WHICH REFERENCES TO
 SEE GROUNDING ELECTRODE DETAIL ON SMAE
 SHEET, YET THIS CONNECTION IS NOT SHOWN.
 PLEASE VERIFY IF INDEED THIS CONNECTION
 IS BEING MADE. IS THIS SYSTEM A
 NON-SEPARATELY DERIVED SYSTEM? OR
 SEPARATELY DERIVED? 250.30 ETC.
  
 8)NOTE: PLEASE SEE NOTE#8,PLEASE PROVIDE
 MORE INFORMATION ON SIZE OF TRANSFORMER
 IN ORDER TO VERIFY OCP PROVIDED. THIS
 SHALL MEET 125% MAX PER 450.3
  
 9)NOTE: PLEASE SEE NOTE #16, #17
 MENTIONS TO PROVIDE NEW , HOWEVER RISER
 SHOWS EXISTING IN LT GRAY?
  
 10)NOTE: PLEASE SEE TWO DIFFERENT
 VOLTAGES ON PLANS SHOWN. PANEL "C" IS
 SHOWN AS 120/208V AND "EM AS 120/240V?
 PLEASE SEE IT APPEARS EXISTING LIGHTING
 IS FED FROM A DIFFERENT VOLTAGE THEN IS
 PROPOSED. ??
  
 11)NOTE: PLEASE VERIFY MSB AS BEING A
 FUSED DP, WITH FUSES FOR EACH SUB PANEL
 FEED.
  
 12)NOTE: PLEASE SEE SHEET E-1, WHICH
 NOTES FOR TOWER ELEVATOR RMS #1&2 TO SEE
 ENLARGED DEATIL ON SHEET E-2, HOWEVER NO
 SHEET E-2 WAS SUBMITTED FOR REVIEW?
 PLEASE CORRELATE THIS COMMENT WITH
 PREVIOUS NOTE #5.
 PLEASE ALSO SEE SHEET E-1 MENTIONS TO
 SEE TOLLBOOTH DETAIL ON E-2, YET NO E-2
 PROVIDED.
  
 13)NOTE: PLEASE SEE TRANSFORMER TO BE
 INSTALLED IN EXSITING ELECTRICAL ROOM IS
 NOTED AS TO MEET CLEARENCE PER NEC.
 HOWEVER, PLEASE SEE AS PER PLANS,
 CLEARENCE AMY NOT BE ABLE TO BE MET PER
 110.26. IF TRANSFORMER IS TO
 CEILING/WALL MOUNTED, THEN PLEASE
 PROVIDE DETAIL FOR STRCUTUAL REVIEW.
 215.5
  
 14)NOTE: PLEASE PROVIDE INFORMATION/
 SIZE OF OCP AT GEN FOR FEED COMING INTO
 BLDG. PLEASE SEE DISC SHOWN MENTIONS NF.
 PLEASE SEE 310.16,240.4.
 IF GEN HAS BUILT IN BRKR/OCP, PLEASE
 PROVIDE THIS INFORMATION ON PLANS. THIS
 SHOULD ALSO BE ON SPECS.(PREVIOUS NOTE).
  
 PLEASE SEEE ANY POSSIBLE COMMENTS FROM
 OTHER REVIEWER(S) WHICH MAY AFFECT
 ELECTRICAL PLANS.
  
 PLEASE REMOVE ALL OLD/VOIDED SHEETS AND
 ONLY INSERT NEW REVISED SHEETS INTO
 COMPLETE SETS FOR REVIEW AND STAMPING.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved