| 2006-03-17 00:00:00 | PROVISO: |
| | RESPONSE TO COMMENT #1 DATED 03/02/06: |
| | 500 GALLON FUEL TANK WAS REMOVED FROM |
| | PLAN SHEET A4.01 AND REPLACED WITH A |
| | STORAGE ROOM. THE MECHANICAL PLAN |
| | (M2.01) DOES NOT REFLECT THE NEW STORAGE |
| | ROOM. |
| | |
| | RESPONSE TO COMMENT #2:FIRE DAMPERS |
| | WERE ADDED TO THE SEPARATION BETWEEN THE |
| | GARAGE AND THE DOMESTIC WATER PUMP ROOM |
| | (S110).FIRE DAMPERS WERE NOT ADDED TO |
| | THE SEPARATION BETWEEN ROOMS S110 & |
| | S109.PLAN SHEET A4.01 INDICATES THIS |
| | PENETRATION AS HAVING A 1 HOUR RATING |
| | (K1 WALL TYPE), ACCORDING TO THE |
| | SCHEDULE SHOWN ON PLAN SHEET A9.01. |
| | |
| | RESPONSE TO COMMENT #3:INSTALLATION OF |
| | SHAFT SHALL NOT RESTRICT OR REDUCE THE |
| | AMOUNT OF RETURN AIR REQUIRED PER 2004 |
| | FMC 918.2. |
| | |
| | RESPONSE TO COMMENT #4:NOTE #2 ON PLAN |
| | SHEET M2.02 INDICATES ALL DRYERS SHALL |
| | HAVE A 200 CFM MAXIMUM EXHAUST FAN.PER |
| | 2004 FMC 504.5 INSTALLATIONS EXHAUSTING |
| | MORE THAN 200 CFM SHALL BE PROVIDED WITH |
| | MAKEUP AIR.WHERE A CLOSET IS DESIGNED |
| | FOR THE INSTALLATION OF A CLOTHES DRYER, |
| | AN OPENING HAVING AN AREA OF NOT LESS |
| | THAN 100 SQUARE INCHES, SHALL BE |
| | PROVIDED IN THE CLOSET ENCLOSURE. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |
| | CONTACT PATTY KRAUSS AT (561)805-6719. |