| Date |
Text |
| 2005-12-31 00:00:00 | REVIEW STARTED, IN PROGRESS |
| | ** SEE ALL NOTES BELOW FOR CONDITIONS ** |
| | |
| | |
| | ** PLANS TO REMAIN IN "F" STATUS UNTILL |
| | THE FOLLOWING NOTES ARE ADDRESSED TO |
| | CHANGE PROJECT TO "P" (PASSED) STATUS. |
| | |
| | 1)NOTE: PLEASE SEE ONE SET IS MISSING |
| | SHEET E1.05 |
| | |
| | 2)NOTE: PLEASE SEE ALL THREE SETS ARE |
| | MISSING SHEETS E8.06-8.14 AS INDICATED |
| | ON COVER SHEET.?? THESE WERE IN PREVIOUS |
| | SETS? SEE PROVISO ALSO. |
| | |
| | 2)NOTE: PLEASE SEE PREVIOUS REVIEWS |
| | WHICH REQUESTED ALL SUBMITTALS FOR ALL |
| | EQUIPMENT SPECS: |
| | PLEASE SEE THE FIRE PUMP AND FIRE PUMP |
| | CONTROLLER SPECS WERE SUBMITTED, HOWEVER |
| | THERE APPEARS TO BE ONLY ONE SET AND |
| | THEY ARE LOCATED IN THE REPSONSE PACKAGE |
| | BY THE ENGINEER. PLEASE SEE THE |
| | "EQUIPMENT SPEC BOOKS" SHOULD CONTAIN |
| | THREE SETS OF SAID SPECS FOR FP AND FPC. |
| | |
| | 3)NOTE: PLEASE ALSO SEE NOTES PERTAINING |
| | TO "COLOR CODING SPEC SHEET" AND |
| | BUS-DUCT SPEC SHEET" WHICH WERE TO BE |
| | REVISED IN " JOBSITE SPEC BOOKS". THESE |
| | SHEETS WERE REVISED, HOWEVER THE ONE |
| | COPY OF THESE (BUS-DUCT) WAS SUBMITTED |
| | IN THE SAME PACKAGE WITH THE ENGINEER'S |
| | RESPONSES AND THE OTHER REVISED COPIES |
| | OF COLOR CODING WERE SUBMITTED IN EQUIP |
| | SPEC BKS.. |
| | PLEASE SEE THREE COPIES OF THE REVISED |
| | 16120-2 WERE PLACED IN EQIP SPEC BK |
| | INSTEAD IF JOBSITE SPEC BOOK. |
| | |
| | ** PLEASE BRING IN SHEETSNEEDED TO |
| | COMPLETE ALL THREE "JOBSITE SPEC BOOKS" |
| | AND THE THREE COPIES OF "EQUIPMENT SPEC |
| | BOOKS". |
| | THESE BOOKS WILL BE STAMPED AT THAT |
| | TIME. |
| | |
| | **************************************** |
| | PLEASE SEE THE FOLLOWING WILL BE SET UP |
| | AS A "PROVISO" WHICH WILL REQUIRE SOME |
| | SHEETS TO BE REVISED "BEFORE ANY ROUGH |
| | ELECTRICAL INSPECTION" OR 6 MONTHS WHICH |
| | EVER COMES FIRST. |
| | THESE ITEMS HAVE ALSO BEEN REDLINED ON |
| | PLANS. |
| | ITEMS FROM PREVIOUS REVIEWS AND |
| | INFORMATION TO BE FORTH COMING. |
| | |
| | |
| | ********** PROVISO/REVISION *********** |
| | |
| | 1)NOTE: PLEASE SEE MISSING RECEPTS IN |
| | UNITS |
| | "A", "G","D","HD". 210.52 |
| | REDLINED |
| | |
| | 2)NOTE:PLEASE SEE SOME AREAS LABLED AS |
| | "FOYER CONTAIN RECEPTS ON SMALL |
| | APPLIANCE CIRCUITS. SEE 210.52B1 UNIT |
| | G-1,E-1, VV1 |
| | REDLINED. |
| | |
| | 3)NOTE:PLEASE SEE THE FOLLOWING UNITS |
| | WHICH SMOKE DETECTORS ARE STILL SHOWN ON |
| | MORE THAN ONE CIRCUIT. SEE UNIT #4, C-1 |
| | REDLINED. |
| | |
| | 4)NOTE: PLEASE SEE UNIT "S" DINING RM |
| | DESIGNATION REMOVED. |
| | REDLINED |
| | |
| | 5)NOTE: PLEASE SEE SHEET 7.09 DOES NOT |
| | CONTAIN THE FEEDER SCHEDULE FOR THE 225A |
| | PANEL "N", THIS WAS REVISED ON 7.08. |
| | REDLINED. |
| | |
| | 6)NOTE: PLEASE SEE PANEL SCHEDULE FOR |
| | UNIT "D-2" WAS SUBMITTED, HOWEVER |
| | CIRCUIT #15 FOR SD'S DOES NOT INDICATE |
| | THE REQUIRED ARC FAULT PROTECTION NOTE. |
| | REDLINED ON PANEL SCHEDULE, UNIT.210.12 |
| | |
| | 7)NOTE:POOL AREA LIGHTING TO MEET MIN |
| | CLEARENCES PER 680.22 AND 411.4 |
| | SOME FIXTURES SHOWN CLOSER THAN |
| | PERMITTED. |
| | REDLINED. |
| | |
| | 8)NOTE:PLEASE SEE LS101 7.8.1.3 (1) |
| | WHICH REQUIRES A MIN OF 10FT |
| | CANDLES(108LUX) IN STAIR TOWERS. THIS |
| | LEVEL OF LIGHTING IS REQUIRED ON THE |
| | WALKING SURFACES DURING NOMRAL POWER |
| | CONDITIONS.(1FT CANDLE IN EMERGENCY |
| | CONDITIONS. PHOTO-METRICS WILL BE |
| | REQUIRED OF STAIR- |
| | TOWERS. |
| | |
| | PLEASE SEE LS101 7.9.2.2 WHICH MENTIONS |
| | IN THE EVENT OF THE TRIPPING OF ANY |
| | SINGLE MEANS OF OCP WSHOULD NOT LEAVE |
| | ANY EGRESS AREA IN TOTAL DARKNESS. |
| | PLEASE ALSO SEE A MIN OF SOME SORT OF |
| | BATTERY BACK UP FIXTURE FOR CORRIDOR'S |
| | AND PARKING GARAGE WILL BE REQUIRD TO |
| | PROVIDE MEANS OF EGRESS AT A LIGHTING |
| | LEVEL OF 1FT CANDLE. |
| | |
| | 9)NOTE: PLEASE SEE 230.95,707.7D,700.26 |
| | ETC. |
| | PLEASE SEE A 4-POLE ATS WILL BE |
| | REQUIRED. |
| | PLEASE KNOW, THE GFP IS NOT REQUIRED ON |
| | THE EMERGENCY/ GENERATOR SIDE OF THE EM |
| | DISTRIBUTION SYSTEM, HOWEVER PLEASE SEE |
| | THE ABOVE REFERENCES WHICH DO REQUIRE GF |
| | SENSING. PLEASE SEE THE FOLLOWING IS |
| | TAKEN DIRECTLY FROM ASCO DOCUMENTS |
| | FORWARD TO ME. |
| | "WHERE GROUND FAULTPROTECTION IS |
| | TRIGGERED BY THE CODE AND AN ALTERNATE |
| | POWER SUPPLY IS INCLUDED,SWITCHING OF |
| | THE NEUTRAL BECOMES NECESSARY.THE |
| | SERVICE IS LARGER THAN 1,000 AMPS. |
| | CONSEQUENTLY, GROUNDFAULT PROTECTION |
| | IS REQUIRED AT THE MAIN SERVICE |
| | DISCONNECT AT A MINIMUM. IF ITIS |
| | INSTALLED THERE AND THE GENERATOR |
| | NEUTRAL GROUNDING WAS THROUGH A SOLID |
| | CONNECTION TO THE MAIN SERVICE NEUTRAL, |
| | A GROUND FAULT WHEN THE GENERATOR IS |
| | FEEDING THE LOAD WILL CAUSE THE MAIN |
| | SERVICE DISCONNECT TO OPEN. THIS WILL |
| | NOTDISCONNECT THE ARCING FAULT FROM |
| | THE GENERATOR. COORDINATION IS THUS |
| | LOST." |
| | PLEASE KNOW, IF THE MAIN IS IN THE |
| | OPENING POSITION WHEN POWERM COMES BACK |
| | ON, THE SENSING OF THE FPL WOULD CAUSE |
| | THE ATS TO SWITCH BACK, HOWEVER THERE |
| | WOULD NOT BE ANY POWER THROUGH THE |
| | ELECTRICAL SYSTEM AS THE MAIN FOR THE EM |
| | SYSTEM WOULD HAVE TRIPPED/OPENED. |
| | PLEASE REVISE RISER AND REVISE NOTES TO |
| | REFERENCE A 4-POLE TRANSFER SWITCH AND |
| | INDICATING THE SEPARATELY DERIVED |
| | SYSTEM. |
| | |
| | |
| | **PLEASE SEE THE ABOVE REDLINES/PROVISO |
| | ITEMS WILL NEED TO BE ADDRESSED BEFORE |
| | ANY ROUGH ELECTRICAL INSPECTION IS |
| | SCHEDULED. |
| | ** PLEASE KNOW, ELECTRICAL PERMIT MAY BE |
| | PLACED IN A "HOLD" STATUS UPON 6 MONTHS |
| | TIME TABLE AND "PROVISO" HAS NOT BEEN |
| | SUBMITTED. |
| | |
| | ** PLEASE KNOW, ANY OTHER |
| | REVISIONS/DESIGN CHANGES MAY ALSO BE |
| | SUBMITTED AT THAT TIME. |
| | |
| | |
| | ** PLEASE CALL TO GO OVER SUCH ITEMS |
| | LISTED ABOVE TO HELP IN EXPEDITING THIS |
| | PROJECT TO A "P" STATUS. |
| | |
| | IF THERE ARE ANY QUESTIONS, PLEASE DO |
| | NOT HESITATE IN CONTACTING THIS OFFICE. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |
| | ? |
| 2005-12-30 00:00:00 | REVIEW IN PROGRESS, FINISH FOR 12/30 |
| | WILL CONTINUE ON 12/31 |
| 2005-12-25 00:00:00 | IN ELECTRIC FOR REVIEW. |