| Plan Review Notes For Permit 04120353 |
| Permit Number |
04120353 |
|
| Review Stop |
M |
| Sequence Number |
36 |
|
| Notes |
| Date |
Text |
| 2007-10-25 16:29:37 | MECH REVISION 14 | | | | | | FBC 2001 CODES W/ 2003 SUPPLEMENTS | | | | | | THE FOLLOWING PAGES WERE NOT REVIEWED BECUASE THEY WERE | | | SUPERCEDED PRIOR TO REVIEW OF REV 14: | | | M2.06 SUPERCEDED BY REV15 | | | M4.02 SUPERCEDED BY REV15 | | | M6.03 SUPERCEDED BY REV16 | | | | | | THE FOLLOWING PAGES WERE REVIEWED FOR CODE COMPLIANCE | | | AND PASSED: | | | M2.01 | | | M2.02 | | | M2.03 | | | M2.04 | | | M2.07 | | | M2.09 | | | M2.10 | | | M2.11 | | | M2.12 | | | M2.13 REV.12 | | | M2.17 REV.12 | | | M2.26B | | | M2.26D | | | M2.26F | | | M4.01 | | | M4.03 | | | M5.01 | | | M6.01 | | | | | | THE FOLLOWING PAGE(S) WERE REVIEWED FOR CODE COMPLIANCE | | | AND DENIED WITH COMMENTS: | | | | | | M2.08: 6X6 SUPPLY DUCT FROM HPU-P3-4 IS PASSING THROUGH | | | A RATED WALL. NOTE ON PLAN CLAIMS AN EXCEPTION TO THE | | | REQUIREMENT FOR A FIRE DAMPER PER FBC,M 607.1.3. | | | HOWEVER, UNDER EXCEPTION #3 THE DUCT IS REQUIRED TO BE | | | INSTALLED ABOVE A CEILING. THE STORAGE AREAS DO NOT | | | HAVE A CEILING, THEREFORE A FIRE DAMPER IS REQUIRED AT | | | THIS DUCT PENETRATION OF THE RATED WALL. | | | | | | M2.26A: UNIT C, RETURN TRANSFER (8IN. ROUND) IN BEDROOM | | | 2 IS TOO SMALL TO MEET THE BALANCED RETURN EXCEPTIONS | | | UNDER FBC,M 601.4. IF TRANSFERS ARE NOT DESIGNED TO | | | MEET THESE EXCEPTIONS, A FIELD TEST WILL BE REQUIRED AT | | | FNAL INSPECTION TO VERIFY PRESSURE DIFFERENTIALS ARE | | | LESS THAN 0.01 INCHES W.C AS REQUIRED BY THIS SECTION. | | | | | | | | | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: | | | RONALD J. REGUEIRO | | | 561.805.6719 | | | [email protected] |
|