| 2005-01-18 00:00:00 | 1. PLEASE PROVIDE A COPY OF THE TDR |
| | CERTIFICATE AND A TABLE CONTAINING THE |
| | AMOUNT OF SQUARE FOOTAGE UTILIZED. |
| | 2. BASED ON DAC APPROVAL, AN |
| | ARCHITECTURAL ARTICULATION OF THE RECESS |
| | LINE SHALL BE CARRIED AROUND THE |
| | BUILDING, EXCLUDING THE TOWER ELEMENTS. |
| | 3. PLEASE CONFIRM COMPLIANCE WITH SIDE |
| | SETBACK REQUIREMENT. ART IV SEC 94-108 |
| | (B)(3). |
| | 3. SETBACK ON OLIVE AVENUE IS EXCEEDING |
| | THE MAXIMUM SETBACK OF 8'7" GRANTED BY |
| | DAC VARIANCE.THE BUILDING IS SETBACK |
| | 15'6" IN FRONT OF THE GRAND LOBBY. |
| | 4. PLEASE PROVIDE A TABLE THAT CONFIRMS |
| | MEZZANINES ARE IN COMPLIANCE WITH THE |
| | PERMISSIBLE PERCENTAGE OF FLOOR AREA FOR |
| | A MEZZANINE AS DEFINED IN THE CITY'S |
| | BUILDING CODE. |
| | 5.PLEASE CONFIRM 8" SIDEWALK CLEARANCE |
| | ON THE WESTERN MOST PAR OF LAKEVIEW |
| | AVENUE. |
| | 6.PLEASE PROVIDE INFORMATION THAT |
| | CONFIRMS COMPLIANCE WITH RECESS LINE AT |
| | THE TOP OF 14TH FLOOR ACCORDING WITH DAC |
| | APPROVAL. |
| | 7. PLEASE PROVIDE INFORMATION TO CONFIRM |
| | COMPLIANCE WITH THE MINIMUM 15%LANDSCAPE |
| | REQUIRED FOR THE ROOFTOP TERRACE. |
| | 8. PLEASE PROVIDE INFORMATION TO CONFIRM |
| | COMPLIANCE WITH MAXIMUM 30% ALLOWED FOR |
| | COVERED STRUCTURES. |
| | 9. PLEASE CLARIFY WHAT IS THE "LEASEABLE |
| | SPACE" IDENTIFIED ON THE POOL DECK |
| | LEVEL. |
| | 10. STREET TREES SHALL BE INSTALLED IN |
| | THE SIDEWALK ADJACENT TO THE CURB ALONG |
| | THE FRONTAGE LINE, WITH A REGULAR |
| | SPACING NO GREATER THAN 40'. |
| | 11. PLANTERS ARE NOT ALLOWED ALONG THE |
| | CURB. |
| | 12. PLEASE PROVIDE INFORMATION TO |
| | CONFIRM COMPLIANCE WITH MAXIMUM GLAZED |
| | AREA PERMITTED. |