| Plan Review Notes For Permit 04120220 |
| Permit Number |
04120220 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2005-01-04 00:00:00 | DENIED: | | | 1.PLAN SHEET AMC-1, PLEASE NOTE THE | | | LOCATION OF THE THE O.A. INTAKE IN | | | RELATION TO THE CU 3, 4 & 5,O.A. | | | INTAKE SHALL BE LOCATED AS NOT TO | | | RECIRCULATE HEAT/EXHAUST FROM THE | | | CONDENSING UNITS PER 2001 FBC(M)501.3. | | | | | | 2.PLAN SHEET AMC-4 AHU INSTALLATION | | | DETAIL INDICATES CLOSET AS A RETURN AIR | | | PLENUM.PER 2001 FBC(M)606.2.2, WHERE | | | MULTIPLE AIR HANDLING SYSTEMS SHARE A | | | COMMON PLENUM AND THE COMBINED DESIGN | | | CAPACITY IS GREATER THAN 2,000 CFM, THE | | | SUPPLY AND RETURN AIR DUCTS SHALL HAVE | | | DUCT SMOKE DETECTORS. | | | | | | 3.PLEASE NOTE, PVC & CPVC ARE NOT | | | PERMITTED FOR THE CONDENSATE LOCATED IN | | | THE RETURN AIR PLENUMS. | | | | | | 4.PLAN SHEET PM-2 CONDENSATE DISPOSAL | | | DETAIL,PER 2001 FBC 1503.4.4, | | | CONDENSATE SHALL TERMINATE A MINIMUM OF | | | 12" FROM THE BUILDING STRUCTURE. | | | | | | 5.AUXILIARY DRAIN PAN WITH OVERFLOW | | | PROTECTION REQUIRED PER 2001 | | | FBC(M)307.2.3. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT (561)805-6719. |
|