| Plan Review Notes For Permit 04120193 |
| Permit Number |
04120193 |
|
| Review Stop |
B |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2006-06-28 00:00:00 | DENIED | | | | | | 1) BUILDING PROVISO REQUIRED REVISED | | | ENERGY CALCULATIONS TO REFLECT THE ICF | | | EXTERIOR WALLS. HOWEVER, THE NEW ENERGY | | | CLACS. SUBMITTED LISTS THE SINGLE | | | ASSEMBLY CEILING AS R-20 AND THE PLANS | | | SPECIFY R-30. THE OWNER HAS INDICATED | | | THAT THE CEILING WAS INSULATED WITH A | | | SPRAYED ON FOAM PRODUCT. THEREFORE, THE | | | PLANS MUST BE REVISED TO REFLECT THE | | | CHANGES AND THE PRODUCT INFORMATION | | | (MANUFACTURERS SPECS. AND INSTALLATION | | | INSTRUCTIONS) FOR THE SPRAYED FOAM | | | INSULATION SUBMITTED. TWO COPIES OF ALL | | | REQUESTED ITEMS ARE REQUIRED. TWO | | | SIGNED AND SEALED LETTERS FROM THE | | | DESIGNER OF RECORD (ENGINEER) STATING | | | THAT THE CEILING INSULATION WAS CHANGED | | | FROM R30 BATTS TO R20 SPRAYED FOAM | | | INSULATION WILL BE ACCEPTABLE IN LIEU OF | | | REVISING THE PLAN PAGES. | | | | | | 2) THE COMMENTS FROM THE MECHANICAL | | | PLANS EXAMINER MUST ALSO BE ADDRESSED. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 |
|