| 2004-12-21 00:00:00 | 1. ALL DEMOLITION, RENOVATION, AND |
| | CONSTRUCTION TO COMPLY WITH NFPA 241. |
| | |
| | 2. WHAT HAPPENS WHEN THE EXISTING |
| | METAL STAIRS ARE REMOVED. WHAT AFFECT |
| | WILL IT HAVE. |
| | |
| | 3. ELECTRONIC SWITCHES, CHAIN AND |
| | LOCKS REQUIRED ON FIRE LINE BACKFLOW |
| | DEVICE. |
| | |
| | 4. THE 20 FOOT WIDE FIRE CORRIDOR |
| | LOCATED ALONG THE WEST SIDE OF THE |
| | BUILDING IS EXPECTED TO SUPPORT WHAT |
| | WEIGHT. |
| | |
| | 5. ALL SHAFTS THAT ARE LARGE ENOUGH |
| | FOR PERSONS TO FALL INTO MUST BE |
| | MARKED SHAFTWAY IN 6" LETTERS. |
| | |
| | 6. ALL NEW STAIRS AND RAMPS SHALL |
| | HAVE HANDRAILS ON BOTH SIDES. |
| | |
| | 7. ELEVATOR WARNING SIGNS ARE REQUIRED. |
| | |
| | 8. THE THREE STORY BUILDING PLANNED |
| | FOR DEMOLITION IS PRESENTLY USED FOR |
| | WHAT PURPOSE. |
| | |
| | 9.WHAT FIRE AND LIFE SAFETY SYSTEMS |
| | PRESENTLY EXISTS IN THE PHASE II |
| | BUILDING. |
| | |
| | 10. NO CUTTING OR WELDING OPERATIONS |
| | ARE |
| | TO BE PERFORMED UNTIL APPROVAL OF THE |
| | FIRE PREVENTION BUREAU IS OBTAINED AND |
| | COMPLIANCE WITH NFPA 51B, THE |
| | STANDARD FOR CUTTING AND WELDING |
| | OPERATIONS IS ACHIEVED. |
| | |
| | 11. TACTILE SIGNAGE IS REQUIRED AT ALL |
| | EXIT STAIRS. |
| | |
| | 12. THE ROOM CONTAINING THE GENERATOR |
| | MUST BE AT LEAST TWO HOUR FIRE RATED |
| | IF THE ROOM IS TO CONTAIN DIESEL |
| | FUEL. OPENING PROTECTIVES WILL BE |
| | REQUIRED. |
| | |
| | 13. PLEASE PROVIDE PRESCRIPTIVE |
| | STRENGTH |
| | REQUIREMENTS FOR ALL HANDRAILS AND |
| | GUARDRAILS. |
| | |
| | 14. PLEASE INDICATE INTERIOR FINISH |
| | CLASSIFICATIONS FOR WALLS AND CEILINGS. |
| | |
| | 15. THE BUILDING MAY BE LOCATED IN THE |
| | CITY FIRE LIMITS. CERTAIN RESTRICTIONS |
| | MAY APPLY. PLEASE SEE APPENDIX F, |
| | LOCAL AMENDMENTS TO THE FLORIDA |
| | BUILDING |
| | CODE. |
| | |
| | 16. PLEASE EXPLAIN CARD READERS NOTED |
| | ON DOOR SCHEDULE AND INSIDE STAIRS. |
| | PLEASE EXPLAIN WHAT INFLUENCE THEY |
| | HAVE ON ANY EXITING. |
| | |
| | 17. THE REQUIRED FIRE ALARM SYSTEM |
| | SHALL |
| | BE MONITORED BY A UL LISTED CENTRAL |
| | STATION LISTED FOR CENTRAL STATION |
| | SERVICE. |
| | |
| | 18. KNOX-BOX LOCKING CAPS WILL BE |
| | REQUIRED FOR THE FIRE DEPARTMENT |
| | CONNECTION. |
| | |
| | 19. BUILDING ADDRESS REQUIRED ON PROPER |
| | ELEVATION. A MINIMUM OF 6" HIGH NUMBERS |
| | ARE REQUIRED. |
| | |
| | 20. NO NON FIRE RATED MATERIALS SHALL |
| | BE USED AS TEMPORARY DUSTPROOF |
| | PARTITIONS FOR THE PHASE II |
| | CONSTRUCTION. |
| | |
| | 21. PLEASE PROVIDE PRESCRIPTIVE |
| | STRENGTH |
| | REQUIREMENTS FOR THE GLASS RAILING. |
| | |
| | 22. NO COMBUSTIBLES ALLOWED IN ANY |
| | RETURN AIR PLENUMS. |
| | |
| | 23. PLEASE EXPLAIN MAIN INGRESS/EGRESS |
| | FACILITIES FOR THE BUILDING. PLEASE |
| | EXPLAIN HOW THE 50 % OF OCCUPANT |
| | LOAD EXIT DISCHARGE REQUIREMENTS IS |
| | BEING MET. |
| | |
| | 24. A TABLE AND CHAIRS ARE NOTED |
| | DIRECTLY IN FRONT OF THE ATRIUM STAIR. |
| | |
| | 25. PLEASE INDICATE LOCATION OF THE |
| | FIREFIGHTERS SMOKE CONTROL PANEL FOR |
| | THE ATRIUM SYSTEM. HOW WILL THE |
| | ATRIUM SYSTEM BE TESTED. |
| | |
| | 26. THE HVAC DESIGN REQUIRES BOX ON |
| | PAGE M0.01 IS BLANK. |
| | |
| | 27. THE ATRIUM SHALL MEET THE |
| | REQUIREMENTS OF THE LIFE SAFETY CODE, |
| | 101, 2000 EDITION, SECTION 8.2.5.6. |
| | PLEASE EXPLAIN HOW THE CODE OR |
| | THE EXCEPTIONS ARE BEING MET. |
| | |
| | 28. THE MANUAL CONTROLS FOR THE ATRIUM |
| | SHALL DISPLAY A GRAPHIC OF THE |
| | BUILDING. |
| | HOA SWITCHES ONLY WILL NOT BE ALLOWED. |
| | A GRAPHIC REPRESENTATION OF THE |
| | BUILDING SHALL BE PROVIDED. |
| | |
| | 29. EXIT SIGN PLACEMENT SHALL |
| | NOT EXCEED 100 FEET. |
| | |
| | 30. PLEASE VERIFY ALL DOOR SWINGS. |
| | |
| | 31. PANIC HARDWARE REQUIRED ON EXIT |
| | DOORS. |
| | |
| | 32. ALL SMOKE DETECTORS SHALL BE |
| | INSTALLED A MINIMUM OF THREE FEET |
| | FROM ALL AIR CONDITIONER DIFFUSERS. |
| | |
| | 33. PLEASE INDICATE WHAT THE VOICE |
| | EVACUATION MESSAGE OF THE FIRE ALARM |
| | SYSTEM WILL SAY. |
| | |
| | 34. WHAT WILL THE SMOKE EXHAUST PANEL |
| | LOOK LIKE. |
| | |
| | 35. ACTIVATION OF DUCT SMOKE DETECTORS |
| | SHALL CAUSE THE FIRE ALARM SYSTEM TO |
| | ACTIVATE. |
| | |
| | 36. NO PENETRATIONS PERMITTED WITHIN |
| | ANY REQUIRED EXIT STAIR. |
| | |
| | 37. WHAT IS THE PROPOSED HEIGHT OF |
| | THE COLLECTION STACK RACKS. |
| | |
| | 38. ARE ANY EDUCATIONAL CLASSES OR |
| | ACTIVITIES PLANNED FOR INSIDE THE |
| | BUILDING. |
| | |
| | 39. ALL EXTERIOR STAIRS SHALL BE |
| | SLIP RESISTANT. |
| | |
| | 40. THE EXITING RATIONALE SHALL BE |
| | FURTHER EXPLAINED. |
| | |
| | 41. THE FLOOR PLANS SHOULD BE MADE |
| | LARGER FOR IDENTIFICATION PURPOSES. |
| | |
| | 42. THE NEW PHASE ONE SQUARE FOOTAGE |
| | WHEN ADDED TOGETHER HAS A MATH |
| | ERROR. ALSO THE GROSS AREA NUMBER |
| | APPEARS INCORRECT. |
| | |
| | MIKE CARSILLO, ASSISTANT FIRE MARSHAL |