| 2005-02-22 00:00:00 | ************** UNSAT 2ND REVIEW ******* |
| | |
| | PLEASE SEE SOME NOTES FROM PREVIOUS |
| | REVIEW STILL NEED TO BE ADDRESSED. |
| | |
| | 1)NOTE: NOTE #1, OK. |
| | |
| | 2)NOTE: NOTE #2 NO, PLEASE SEE UNIT(S) |
| | TH-1,D1 (SD BR#2) ALSO UNIT "G". |
| | PLEASE SEE CIRCUITING OF HALL/FOYER AREA |
| | RECEPTS SHOWN ONSMALL APPLIANCE |
| | CIRCUITS? THESE ARE NOT PERMITTED.D2, G, |
| | B ETC. |
| | |
| | 3)NOTE: NOTE #3 OK, TREADMILL EQUIPMENT |
| | CIRCUITS TO BE SIZED AND ADJUSTED FOR |
| | LOAD. |
| | |
| | 4)NOTE: NOTE#4 OK. |
| | |
| | 5)NOTE: NOTE#5 OK. |
| | |
| | 6)NOTE: NOTE #6 OK. |
| | |
| | 7)NOTE: NOTE #7 OK. PHASE II TO HAVE |
| | "FIRE RATED SEPARATION"DUE TO SEPARATE |
| | SERVICE FEEDING PHASE II. |
| | |
| | 8)NOTE: NOTE #8 NO, PLEASE SEE MSBB, |
| | MSBA ON E3.00 |
| | |
| | 9)NOTE: NOTE #9 NO, PLEASE SEE SOME |
| | TRANSFORMERS ARE SHOWN WITH CONNECTION |
| | TO BLDG GROUNDING ELECTRODE SYSTEM, |
| | HOWEVER MANY ARE NOT. |
| | REPLY MENTIONS TO SEE TRANSFORMER |
| | SCHEDULE, HOWEVER THESE ARE FOR THE |
| | SIZING OF EQUIPMENT GROUNDS AND DOES NOT |
| | INCDICATE ATTACHMENT POINT. |
| | PLEASE SEE REDLINED AREAS ON RISER. |
| | 250.30,215.5 |
| | |
| | 10)NOTE: NOTE #10 OK. |
| | |
| | 11)NOTE: NOTE #11, ??, FEEDER SCHEDULE |
| | UPDATED. HOWEVER, PLEASE SEE EQUIPMENT |
| | GROUNDING CONDUCTORS HAVE NOW BEEN ADDED |
| | FROM METER/FPL TO FIRST MEANS OF DISC. |
| | PLEASE SEE 250.6,250.24, NO EQUIPMENT |
| | GROUNDING FROM METER. |
| | |
| | 12)NOTE: NOTE #12 NO, PLEASE A-SHEET |
| | INDICATES 307 UNITS, YET SCHEDULEON |
| | ELECTRICAL METER CENT SUMMARY ADDS UP TO |
| | 312? PLEASE CLARIFY, |
| | |
| | 13)NOTE : NOTE# 13 N, PLEASE SEE SPECS |
| | FOR FOR PUMP ETC WERE SUBMITTED, HOWEVER |
| | COULD NOT FIND ANY INDICATION OF MANUAL |
| | MEANS OF DISCONNECT LOCATED ON OUTSIDE |
| | OF EQUIPMENT. PLEASE EITHER SHOW OR |
| | PROVIDE NOTE. 230.76,230.79,110.27 |
| | |
| | 14)NOTE: NOTE #14 NO, PLEASE SEE RISER |
| | AND CONDUCTORS SHOWN FOR GDP;(F-9) TO |
| | EDPH. PLEASE CORRELATE GDP AND RISER |
| | FEEDER SCHEDULE. |
| | 215.5,240.4 |
| | |
| | 15)NOTE: NOTE #15 OK,HOWEVER, PLEASE |
| | SEE RATING OF GENERATOR AND LOAD ON |
| | NOTES TO FOLLOW. |
| | |
| | 16)NOTE: NOTE #16 OK. |
| | |
| | 17)NOTE: NOTE #17 OK, DETAIL LOCATED ON |
| | 6.02. REPLY MENTIONS, 6.01 |
| | |
| | 18)NOTE: NOTE #18 OK. |
| | |
| | 19)NOTE: NOTE #19 NO,NOTES ON 6.01 |
| | STILL MENTIONS THE USE OF ALUM OK. |
| | PLEASE ALSO SEE REFERENCE TO WRONG CODE |
| | IN NOTES ON 6.01 AND 3.00 FROM 1999. |
| | PLEASE SEE WE ARE UNDER 2001 AMENDMENTS |
| | AND 2002 NEC. |
| | COULD NOT LOCATE COLOR CODING. |
| | |
| | 20)NOTE: NOTE #20 OK. |
| | |
| | 21)NOTE: NOTE #21 OK. |
| | |
| | 22)NOTE: NOTE #22 OK. |
| | |
| | 23)NOTE: NOTE #23 OK. |
| | |
| | 24)NOTE: NOTE #24 OK. |
| | |
| | 25)NOTE: NOTE #25 OK. |
| | |
| | 26)NOTE: NOTE #26 OK, HOWEVER NOW |
| | EQUIPMENT GROUNDS HAVE BEEN ADDED TO |
| | SEC'S. PLEASE SEE 250.6,250.24. |
| | |
| | 27)NOTE: NOTE #27 OK. |
| | |
| | 28)NOTE: NOTE #28 NO/, NOTE ADDED TO |
| | 4.01, YET NOTE FOR LAYOUT FOR MAINS, |
| | DISC'S, LOCATIONS ETC TO BE IN FIRE |
| | COMMAND RM. |
| | PLEASE ALSO SEE NOTE #13. |
| | |
| | 29)NOTE: NOTE #29 NO, PLEASE SEE PLANS |
| | MENTIONS LOAD SHEDDING , HOWEVER NO |
| | EQUIPMENT FOR LOAD SHEDDING ETC WAS |
| | PROVIDED. PLEASE SEE LOAD SUMMARY |
| | INDICATES ELEVATORSBEING SHEDDED. |
| | PLEASE VERIFY/NOTE ONE STRECHER |
| | ACCESSIBLE ELEVATOR TO REMAIN. |
| | PLEASE ALSO SEE LSC 101, SECTION |
| | 11.8.4.2.AS PER CONVERSATION WITH MIKE |
| | CARSILLO, ONE ELEVATOR (MIN) WILL BE |
| | REQUIRED TO BE ON GENERATOR POWER EVEN |
| | WITH RUNNING OF OTHER REQUIRED SYSTEMS. |
| | *** PLEASE SEE LOAD ON GDP INDICATES |
| | LOAD ON EDPH AS 552A'S, YET EDPH SHOWS |
| | LOAD AT 782A'S?? |
| | PLEASE CORRELATE. |
| | PLEASE ALSO SEE LOAD SHOWN ON GDP IS |
| | SHOWN AS 1214 A'S YET GEN IS ONLY RATED |
| | FOR 1205A'S? |
| | PLEASE VERIFY LOAD, SIZE ETC. |
| | |
| | 30)NOTE: NOTE #30, NO, PLEASE STILL SEE |
| | MSBB,MSBA.OTHERS ARE NOTED FOR GROUND |
| | FAULT PROTECTION. 230.95,240.13 ETC |
| | |
| | 31)NOTE: NOTE #31 OK. |
| | |
| | 32)NOTE: NOTE #32 OK? |
| | |
| | 33)NOTE: NOTE #33 NO, RESPONSE MENTIONS |
| | THAT GENERATOR IS A SEPARATELY DERIVED |
| | SUYSTEM, HOWEVER ATS IS SHOWN AS A |
| | 3-POLE UNIT, THERE IS NO GROUNDING |
| | ELECTRODE SYSTEM SHOWN ON RISER FOR |
| | GENERATOR. 250.30 |
| | PLEASE ALSO SEE EQUIPMENT GROUNDS SHOWN |
| | FROM GEN TO GDP? PLEASE SEE |
| | 250.6,250.24. |
| | |
| | 34)NOTE: NOTE #34, OK. PLEASE SEE |
| | PREVIOUS NOTES FOR LOAD, LOAD SHEDDING |
| | ETC. |
| | |
| | 35)NOTE: NOTE #35. OK, NOTES ON PREVIOUS |
| | NOTE THIS REVIEW. |
| | |
| | 36)NOTE: NOTE #36 NO. |
| | |
| | 37)NOTE: NOTE: #37 OK. |
| | |
| | 38)NOTE: NOTE #38 OK. |
| | |
| | 39)NOTE: NOTE #39 OK. |
| | |
| | 40)NOTE: NOTE #40 OK. |
| | |
| | 41)NOTE: NOTE #41 NO, PLEASE SEE SOME |
| | CIRCUITING AS NOTED ON REVIEW NOTE #2. |
| | SOME OF THESE HAVE BEEN REDLINED ON ONE |
| | SET. |
| | |
| | 42)NOTE: NOTE #42 NO, NOTE COULD NOT BE |
| | LOCATED TO INCLUDE EXCEPTIONS. |
| | PER NFPA-72 8-1.4.2 |
| | |
| | 43)NOTE: NOTE #43 OK. |
| | |
| | 44)NOTE: NOTE #44 OK. |
| | |
| | 45)NOTE: NOTE #45 NO, PLEASE SEE SOME |
| | UNITS(D1,G, B ) GFI'S REQUIRED W/IN 3' |
| | OF SINK EDGE. PLEASE EITHER ADD ONE, OR |
| | MOVE GFI TO CENTER BETWEEN SINKS. |
| | 210.52D |
| | |
| | 46)NOTE: NOTE #46 OK. |
| | |
| | 47)NOTE: NOTE #47 OK, PLEASE SEE |
| | PREVIOUS NOTES WITH REFERENCE TO |
| | CIRCUITING OF HALL/FOYER RECEPTS. |
| | |
| | 48)NOTE: NOTE #48 OK. |
| | |
| | NEW NOTES> |
| | |
| | 1)NOTE: PLEASE SEE DRAWING "KEYNOTES" #7 |
| | MENTIONS ALL MAINS TO HAVE "SHUNT TRIPS" |
| | LOCATED IN FIRE COMMAND RM. |
| | PLEASE SEE MSBA, MSBB, ARE THE ONLY |
| | "MIANS" NOTED AS HAVING "SHUNT TRIP |
| | MAINS" PLEASE VERIFY OTHERS. |
| | PLEASE ALSO SEE MSBB AND MSBB, SHUNT |
| | TRIP TYPE BREAKER TO BE SELECTED MUST |
| | ALSO HAVE A MANUAL MEANS OF DISCAND |
| | MUST BE EXTERNAL. |
| | 230.76,230.79,110.27 |
| | |
| | 2)NOTE: PLEASE SEE GENERATOR SUBMITTALS: |
| | |
| | FUEL TANK CHECKED FOR USE INDICATES A |
| | 600KW GEN? PLEASE SEE SPEC BOOKS AND |
| | PLEASE ADJUST. |
| | |
| | |
| | PLEASE SEE MANY OF THESE ABOVE ITEMS |
| | HAVE BEEN REDLINED ON ONE SET OF PLANS |
| | FOR REFERENCE. |
| | |
| | PLEASE SEE ANY POSSIBLE NOTES FROM OTHER |
| | REVIEWERS WHICH MAY AFFECT ELECTRICAL |
| | PLANS. |
| | |
| | PLEASE BE SURE TO REMOVED ALL OLD/ |
| | VOIDED SHEETS AND INSERT NEW REVISED |
| | SHEETS INTO COMPLETE SETS FOR REVIEW AND |
| | STAMPING. |
| | ONE SET OF ALL OLD/VOIDED SHEETS SHOULD |
| | BE SUBMITTED FOR REFERENCE WHEN |
| | RESUBMITTING PLANS. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE TO CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | CITY OF WEST PALM BEACH |
| | CONSTUCTION SERVICES DEPT. |
| | 561-805-6717 |
| | [email protected] |
| | |
| | |
| | |