| 2004-12-08 00:00:00 | *************** UNSAT****************** |
| | |
| | ** PLEASE SEE THIS PLANS ARE IN FOR |
| | "PLAN REVIEW" ONLY AND NOT FOR PERMIT |
| | APPLICATION. |
| | |
| | |
| | 1)NOTE: PLEASE SEE FS 471.025,471.023 |
| | FAC 61G15-23.002. PLEASE SEE MISSING |
| | LICENSE INFORMATION ON TITLE BLOCK FOR |
| | ENGINEERING FIRM. PLEASE ALSO SEE ALL |
| | PLANS/SETS AND SHEETS ARE REQUIRED TO |
| | BE |
| | "SIGNED" DATED AND SEALED WHEN |
| | SUBMITTING FOR PERMIT. |
| | THIS COMMENT IS FOR ALL TRADES WHEATHER |
| | OR NOT COMMENT IS MADE BY OTHER |
| | REVIEWER(S). |
| | |
| | 2)NOTE: PLEASE SHOW ALL CIRCUITING ON |
| | PLANS AND CORRELATE WITH THE SUBMITTED |
| | PANEL SCHEDULES. PLEASE SEE 2.01,2.10 |
| | PLEASE SEE TOWNHOUSE, APT UNITS ARE |
| | SHOWN W/OUT ANY CIRCUIT #'S SHOWN. |
| | |
| | 3)NOTE: PLEASE VERIFY LOAD ON SOME |
| | EXERCISE EQUIPMENT. SHOWS 4 TREADMILLS |
| | ON ONE CIRCUIT. |
| | |
| | 4)NOTE: PLEASE SEE NOTE FOR LIGHTNING |
| | PROTECTION ON E 2.14. PLEASE SEE |
| | REFERENCE SHOULD BE MADE TO NFPA-780. |
| | PLEASE NOTE: LIGHTNING PROTECTION IS |
| | REQUIRED UNDER SEPARATE PERMIT UNLESS |
| | PLANS AND SPECS ARE SUBMITTED WITH MAIN |
| | BLDG PERMIT. PLEASE SEE THIS WOULD ALSO |
| | INCLUDE THE MAIN ELECTRICAL CONTRACTOR |
| | BEING RESPONSIBLE FOR PERMIT. |
| | |
| | 5)NOTE: PLEASE SEE 2.14 FOR SOME |
| | MISSING |
| | CIRCUITING FOR SLA FIXTURES. |
| | |
| | 6)NOTE: PLEASE SEE 3.00 WHICH |
| | IDENTIFIES |
| | TWO "TOWER ELECTRICAL RMMS. PLEASE |
| | PROVIDE IDENTIFICATION FOR EACH. |
| | |
| | 7)NOTE: PLEASE VERIFY IF PHASE II IS |
| | GOING TO BE A "SEPARATE BLDG" SHOWS |
| | CONDUIT F-1 FROM FPL VAULT TO STUB OUT |
| | INTO FUTURE LOCATION HOWEVER GENERATOR |
| | AND EQUIPMENT FOR PHASE #I IS ALSO |
| | SHOWN |
| | AS FEEDING FUTURE PHASE II??? |
| | PLEASE VERIFY TRANSFER OF POWER. |
| | BLDG-ONE LOSES POWER AND GEN COMES |
| | ONLINE, BLDG-TWO WHICH HAS NOT LOST |
| | POWER WILL NOW BE FED FROM GEN WHICH |
| | HAS |
| | JUST COME ONLINE? PLEASE REVIEW THIS |
| | SCENARIO. |
| | |
| | 8)NOTE: PLEASE CORRELATE IDENTIFICATION |
| | OF ALL EQUIPMENT AS SHOWN ON ELECTRICAL |
| | ROOM LAYOUT AND RISER DIAGRAM. |
| | EDPH/EDP, |
| | EHA/EH , ME-TH/ MAIN #4, NOT SHOWN. ETC |
| | 215.5 |
| | |
| | 9)NOTE: PLEASE SHOW GRONDING |
| | ATTACHMENTS |
| | FOR TRANSFORMER. A SEPARATELY DERIVED |
| | AC |
| | SYSTEM THAT IS GROUNDED SHALL COMPLY |
| | WITH 250.30(A)(1) THROUGH (6). |
| | |
| | 10)NOTE: PLEASE SEE 4.01 WHICH SHOWS A |
| | MC#13? PLEASE VERIFY THIS SHOWN AT TWO |
| | LOCATIONS REDLINED. WOULD THIS BE #14? |
| | |
| | 11)NOTE: PLEASE SEE LOAD SUMMARY FOR |
| | MSBH WHICH IS SHOWN AS 1600A, YET |
| | FEEDER |
| | SCHEDULE INDICATES A 1200A FEEDERS? |
| | PLEASE ALSO SEE FEEDER SCHEDULE |
| | MENTIONS |
| | 1200A FEEDERS, YET NO CONDUIT OR |
| | CONDUCTOR SIZES ARE SHOWN?? 215.5 |
| | PLEASE SEE 310.16, 240.4C, |
| | DEVICES RATED OVER 800 AMPERES. WHERE |
| | THE OVERCURRENT DEVICE IS RATED OVER |
| | 800 |
| | AMPERES, THE AMPACITY OF THE CONDUCTORS |
| | IT PROTECTS SHALL BE EQUAL TO OR |
| | GREATER |
| | THAN THE RATING OF THE OVERCURRENT |
| | DEVICE DEFINED IN 240.6. |
| | PLEASE SEE THIS EQUIPMENT IS SHOWN AS |
| | MLO WHEN A MCB IS REQUIRED IF THIS IS |
| | GOING TO BE "MAIN #1" |
| | 230.70 |
| | |
| | 12)NOTE: PLEASE SEE CORRELATE THE # OF |
| | UNTIS WITH #'S OIF UNITS SHOWN ON |
| | A-SHEETS. PLEASE ADJUST ANY |
| | RISERS/PANELS AND LOAD CALCULATIONS. |
| | 215.5 |
| | |
| | 13)NOTE: PLEASE SEE RISER INDICATES A |
| | MAIN DISCONNECT FOR FIRE PUMP |
| | CONTROLLER |
| | YET NO INFORMATION IS GIVEN. 215.5 |
| | |
| | 14)NOTE:: PLEASE SEE 240.4 WHERE THE |
| | OVERCURRENT DEVICE IS RATED OVER 800 |
| | AMPERES, THE AMPACITY OF THE CONDUCTORS |
| | IT PROTECTS SHALL BE EQUAL TO OR |
| | GREATER |
| | THAN THE RATING OF THE OVERCURRENT |
| | DEVICE DEFINED IN 240.6. THIS NEEDS TO |
| | BE ADDRESSED IN A COUPLE LOACTIONS. |
| | |
| | 15)NOTE: PLEASE CORELATE KW RATING OF |
| | GENERATOR SHOWN ON PLANS AND SPEC |
| | SHEETS |
| | SUBMITTED. |
| | 215.5 |
| | |
| | 16)NOTE: PLEASE SEE PANEL RBH IS SHOWN |
| | AS 225A RATED, YET THIS PANEL IS FED |
| | FROM MSBH WITH A 250A BRKR. PLEASE |
| | CORRELATE AND ADJUST. |
| | 215.5 |
| | |
| | 17)NOTE:PLEASE PROVIDE NOTE: FOR RATING |
| | OF BUS-DUCT. |
| | PLEASE ALSO SEE 368.6 FOR PENETRATION |
| | THROUGH WALLS AND FLOORS. |
| | (1) BUSWAYS SHALL BE PERMITTED TO BE |
| | EXTENDED VERTICALLY THROUGH DRY FLOORS |
| | IF TOTALLY ENCLOSED (UNVENTILATED) |
| | WHERE |
| | PASSING THROUGH AND FOR A MINIMUM |
| | DISTANCE OF 1.8 M (6 FT) ABOVE THE |
| | FLOOR |
| | TO PROVIDE ADEQUATE PROTECTION FROM |
| | PHYSICAL DAMAGE. |
| | (2) IN OTHER THAN INDUSTRIAL |
| | ESTABLISHMENTS, WHERE A VERTICAL RISER |
| | PENETRATES TWO OR MORE DRY FLOORS, A |
| | MINIMUM 100 MM (4 IN.) HIGH CURB SHALL |
| | BE INSTALLED AROUND ALL FLOOR OPENINGS |
| | FOR RISER BUSWAYS TO PREVENT LIQUIDS |
| | FROM ENTERING THE OPENING. THE CURB |
| | SHALL BE INSTALLED WITHIN 300 MM (12 |
| | IN.) OF THE FLOOR OPENING. ELECTRICAL |
| | EQUIPMENT SHALL BE LOCATED SO THAT IT |
| | WILL NOT BE DAMAGED BY LIQUIDS THAT ARE |
| | RETAINED BY THE CURB. |
| | PLEASE PROVIDE NOTE FOR REQUIRED |
| | CURBING. |
| | |
| | 18)NOTE: PLEASE SEE RISER MENTIONS TO |
| | PROVIDE "ALTERNATE PRICE" FOR |
| | CONDUCTORS |
| | AND CONDUIT TO BUS-TAP BOX LOCATIONS. |
| | PLEASE PROVIDE CONDUIT/CONDUCTOR SIZES |
| | ON PLANS AT THIS TIME TO MEET MIN |
| | REQUIREMENTS. 240.4,310.16 |
| | |
| | 19)NOTE: PLEASE SEE LOCAL |
| | AMENDMENTS,250.62 NO EQUIPMENT |
| | GROUNDING |
| | MAY BE ALUM. |
| | PLEASE ALSO SEE 310.2 FOR SIZING OF MIN |
| | ALUM CONDUCTORS. |
| | PLEASE PROVIDE NOTE FOR COLOR CODING OF |
| | CONDUCTORS PER LOCAL AMEND. 215. |
| | |
| | 20)NOTE: PLEASE SEE RTU32, SHOWN WITH |
| | #12 AWG ON A 100A3P BRKR. PLEASE SEE |
| | 310.16, 240.4 FOR SIZING.CONDUCTORS, |
| | OTHER THAN FLEXIBLE CORDS, FLEXIBLE |
| | CABLES, AND FIXTURE WIRES, SHALL BE |
| | PROTECTED AGAINST OVERCURRENT IN |
| | ACCORDANCE WITH THEIR AMPACITIES |
| | SPECIFIED IN 310.15, UNLESS OTHERWISE |
| | PERMITTED OR REQUIRED IN 240.4(A) |
| | THROUGH (G). |
| | |
| | 21)NOTE:PLEASE SEE DISCONNECT SHOWN ON |
| | RISER DIAGRAM FOR PANEL "P", PLEASE |
| | PROVIDE INFORMATION FOR DISC SHOWN. |
| | SIZE, OCP, ETC 215.5 |
| | |
| | 22)NOTE: PLEASE SEE OCP/ AWG FOR FEED |
| | TO |
| | ERL FROM ERH. #12, W/ 30A OCP. |
| | |
| | 23)NOTE: PLEASE SEE SEE MAX |
| | OVER-CURRENT |
| | PROTECTION FOR TRANSFORMERS IS 125%. |
| | PLEASE SEE NUMEROUS TRASNFROMERS SHOWN |
| | EXCEEDING 125% OCP. |
| | ERH< E3H/E3L, EH/EL ETC.450.3A |
| | |
| | 24)NOTE: PLEASE SEE FC PANEL, SHOWN AS |
| | 10A, WITH 100A FEED ?? MISPRINT? |
| | 310.15,240.4 ETC |
| | |
| | 25)NOTE: PLEASE SEE FEEDERS FOR MC-TH |
| | SHOWN AS OVERHEAD TO EQUIPMENT. PLEASE |
| | SEE 230.70 OF LOCAL AMENDMENTS WHICH |
| | REQUIRE CONCRETE ENCASEMENT FOR |
| | MORE-THAN 8' OF UNPROTECTED CONDUCTOR |
| | "INSIDE" THE BLDG. |
| | PLEASE SEE FEEDER SCHEDULE MENTIONS |
| | 1200A FEEDER, YET NO INFORMATION IS |
| | GIVEN FOR SIZE AND TYPE. |
| | |
| | 26)NOTE: PLEASE COMPLETE FEEDER |
| | SCHEDULE. SHOWS AMERAGE OF WHAT FEEDERS |
| | NEED TO BE , BUT NO SIZES ARE GIVEN FOR |
| | CONDUITS, CONDUCTORS, EQUIPMENT |
| | GROUNDING ETC |
| | 215.5,215.24,250.122,310.16 ETC |
| | |
| | 27)NOTE:PLEASE SEE EDPH REQUIRED TO |
| | HAVE |
| | A MCB FOR DISCONNECTING MENS FROM |
| | GENERATOR DP/ GEN. |
| | 230.72,230.70 ETC. |
| | GEN DP LOCATION IS OVER 300' AWAY. |
| | |
| | 28)NOTE: PLEASE VERFIY THE MAIN SINGLE |
| | OCP FOR FIRE PUMP. PLEASE SEE FIRE PUMP |
| | CONTROLLER SPECS MENTIONS, FACTORY SET |
| | AT LRC.(6X). YET, RISER SHOWS |
| | DISC(PREVIOUS COMMENT) AND GEN DP SHOWS |
| | OCP ALSO? VERIFY OF THERE IS OCP ON GEN |
| | TO GEN DP. |
| | THE OVERCURRENT PROTECTIVE DEVICE(S) |
| | SHALL BE SELECTED OR SET TO CARRY |
| | INDEFINITELY THE SUM OF THE |
| | LOCKED-ROTOR |
| | CURRENT OF THE FIRE PUMP MOTOR(S) AND |
| | THE PRESSURE MAINTENANCE PUMP MOTOR(S) |
| | AND THE FULL-LOAD CURRENT OF THE |
| | ASSOCIATED FIRE PUMP ACCESSORY |
| | EQUIPMENT |
| | WHEN CONNECTED TO THIS POWER SUPPLY. |
| | THE DISCONNECTING MEANS SHALL BE MARKED |
| | ?FIRE PUMP DISCONNECTING MEANS.? THE |
| | LETTERS SHALL BE AT LEAST 25 MM (1 IN.) |
| | IN HEIGHT, AND THEY SHALL BE VISIBLE |
| | WITHOUT OPENING ENCLOSURE DOORS OR |
| | COVERS. |
| | PLEASE SEE 695 FOR FIRE PUMP. |
| | |
| | 29)NOTE: PLEASE SEE LOAD ON GENERATOR. |
| | PLANS INDICATE 1000KW AND 600KW, PLEASE |
| | CLARIFY WHICH ONE IS GOING TO BE |
| | INSTALLED. |
| | GEN LOAD IS NOW SHOWN EXCEEDING RATING |
| | OF GENERATOR. PLEASE |
| | PROVIDE INFORMATION ON MEANS OF |
| | AUTOMATIC SHEDDING. |
| | N EMERGENCY SYSTEM SHALL HAVE ADEQUATE |
| | CAPACITY AND RATING FOR ALL LOADS TO BE |
| | OPERATED SIMULTANEOUSLY. THE EMERGENCY |
| | SYSTEM EQUIPMENT SHALL BE SUITABLE FOR |
| | THE MAXIMUM AVAILABLE FAULT CURRENT AT |
| | ITS TERMINALS. |
| | THE EMERGENCY SYSTEM MUST BE DESIGNED |
| | WITH ADEQUATE CAPACITY AND RATING TO |
| | SAFELY CARRY THE ENTIRE LOAD CONNECTED |
| | TO THE EMERGENCY SYSTEM AT ONE TIME. IT |
| | MUST BE CAPABLE OF RESTARTING EMERGENCY |
| | LOADS, SUCH AS MOTORS, THAT MAY HAVE |
| | STOPPED, AND IT MUST BE SUITABLE FOR |
| | THE |
| | AVAILABLE FAULT CURRENT. USING DEVICES |
| | THAT LIMIT THE AVAILABLE FAULT CURRENT |
| | IS ONE METHOD OF ACHIEVING SUITABILITY. |
| | |
| | THE ALTERNATE POWER SOURCE SHALL BE |
| | PERMITTED TO SUPPLY EMERGENCY, LEGALLY |
| | REQUIRED STANDBY, AND OPTIONAL STANDBY |
| | SYSTEM LOADS WHERE AUTOMATIC SELECTIVE |
| | LOAD PICKUP AND LOAD SHEDDING IS |
| | PROVIDED AS NEEDED TO ENSURE ADEQUATE |
| | POWER TO (1) THE EMERGENCY CIRCUITS, |
| | (2) |
| | THE LEGALLY REQUIRED STANDBY CIRCUITS, |
| | AND (3) THE OPTIONAL STANDBY CIRCUITS, |
| | IN THAT ORDER OF PRIORITY. THE |
| | ALTERNATE |
| | POWER SOURCE SHALL BE PERMITTED TO BE |
| | USED FOR PEAK LOAD SHAVING, PROVIDED |
| | THE |
| | ABOVE CONDITIONS ARE MET. |
| | PLEASE ALSO SEE ALL OF 702.5 OPTIONAL |
| | STANDBY SYSTEM SHALL HAVE ADEQUATE |
| | CAPACITY AND RATING FOR THE SUPPLY OF |
| | ALL EQUIPMENT INTENDED TO BE OPERATED |
| | AT |
| | ONE TIME. OPTIONAL STANDBY SYSTEM |
| | EQUIPMENT SHALL BE SUITABLE FOR THE |
| | MAXIMUM AVAILABLE FAULT CURRENT AT ITS |
| | TERMINALS. THE USER OF THE OPTIONAL |
| | STANDBY SYSTEM SHALL BE PERMITTED TO |
| | SELECT THE LOAD CONNECTED TO THE |
| | SYSTEM. |
| | PROVIDE INFORMATION ON AUTO SHEDDING |
| | FOR |
| | ELEVATORS. |
| | |
| | 30)NOTE: PLEASE SEE |
| | 230.95,240.13,700.7D |
| | FOR MSBH, MSBE, EDPH,ETC.GROUND-FAULT |
| | PROTECTION OF EQUIPMENT SHALL BE |
| | PROVIDED FOR SOLIDLY GROUNDED WYE |
| | ELECTRICAL SERVICES OF MORE THAN 150 |
| | VOLTS TO GROUND BUT NOT EXCEEDING 600 |
| | VOLTS PHASE-TO-PHASE FOR EACH SERVICE |
| | DISCONNECT RATED 1000 AMPERES OR MORE.. |
| | TO INDICATE A GROUND FAULT IN SOLIDLY |
| | GROUNDED WYE EMERGENCY SYSTEMS OF MORE |
| | THAN 150 VOLTS TO GROUND AND |
| | CIRCUIT-PROTECTIVE DEVICES RATED 1000 |
| | AMPERES OR MORE. THE SENSOR FOR THE |
| | GROUND-FAULT SIGNAL DEVICES SHALL BE |
| | LOCATED AT, OR AHEAD OF, THE MAIN |
| | SYSTEM |
| | DISCONNECTING MEANS FOR THE EMERGENCY |
| | SOURCE, AND THE MAXIMUM SETTING OF THE |
| | SIGNAL DEVICES SHALL BE FOR A |
| | GROUND-FAULT CURRENT OF 1200 AMPERES. |
| | INSTRUCTIONS ON THE COURSE OF ACTION TO |
| | BE TAKEN IN EVENT OF INDICATED GROUND |
| | FAULT SHALL BE LOCATED AT OR NEAR THE |
| | SENSOR LOCATION. |
| | |
| | 31)NOTE: PLEASE SEE "MAIN" EQUIPMENT |
| | SHOWN WITH MORE THAN 6-SPACES AS MLO. |
| | PLEASE ALSO SEE SOME OTHER EQUIPMENT |
| | NOT |
| | CLARIFIED WITH # OF SPACES AND SHOWN AS |
| | MLO. MSBH, EDPH, MSBE, HE SERVICE |
| | DISCONNECTING MEANS FOR EACH SERVICE |
| | PERMITTED BY 230.2, OR FOR EACH SET OF |
| | SERVICE-ENTRANCE CONDUCTORS PERMITTED |
| | BY |
| | 230.40, EXCEPTION NOS. 1, 3, 4, OR 5, |
| | SHALL CONSIST OF NOT MORE THAN SIX |
| | SWITCHES OR SETS OF CIRCUIT BREAKERS, |
| | OR |
| | A COMBINATION OF NOT MORE THAN SIX |
| | SWITCHES AND SETS OF CIRCUIT BREAKERS, |
| | MOUNTED IN A SINGLE ENCLOSURE, IN A |
| | GROUP OF SEPARATE ENCLOSURES, OR IN OR |
| | ON A SWITCHBOARD. THERE SHALL BE NO |
| | MORE |
| | THAN SIX SETS OF DISCONNECTS PER |
| | SERVICE |
| | GROUPED IN ANY ONE LOCATION. FOR THE |
| | PURPOSE OF THIS SECTION, DISCONNECTING |
| | MEANS USED SOLELY FOR POWER MONITORING |
| | EQUIPMENT, OR THE CONTROL CIRCUIT OF |
| | THE |
| | GROUND-FAULT PROTECTION SYSTEM OR |
| | POWER-OPERABLE SERVICE DISCONNECTING |
| | MEANS, INSTALLED AS PART OF THE LISTED |
| | EQUIPMENT, SHALL NOT BE CONSIDERED A |
| | SERVICE DISCONNECTING MEANS. |
| | |
| | 32)NOTE: PLEASE SEE 700.9D1 EMERGENCY |
| | SYSTEMS SHALL MEET THE FOLLOWING |
| | ADDITIONAL REQUIREMENTS IN ASSEMBLY |
| | OCCUPANCIES FOR NOT LESS THAN 1000 |
| | PERSONS OR IN BUILDINGS ABOVE 23 M (75 |
| | FT) IN HEIGHT WITH ANY OF THE FOLLOWING |
| | OCCUPANCY CLASSES: ASSEMBLY, |
| | EDUCATIONAL, RESIDENTIAL, DETENTION AND |
| | CORRECTIONAL, BUSINESS, AND MERCANTILE. |
| | PLEASE SEE RISER. |
| | |
| | 33)NOTE: PLEASE PROVIDE NOTE FOR |
| | INFORMATION ON GENERATOR TO WHEATHER |
| | THIS IS A SEP DERIVED GEN. |
| | 250.30,702.8A |
| | SIGN SHALL BE PLACED AT THE |
| | SERVICE-ENTRANCE EQUIPMENT THAT |
| | INDICATES THE TYPE AND LOCATION OF |
| | ON-SITE OPTIONAL STANDBY POWER SOURCES. |
| | A SIGN SHALL NOT BE REQUIRED FOR |
| | INDIVIDUAL UNIT EQUIPMENT FOR STANDBY |
| | ILLUMINATION. |
| | PLEASE SEE WHERE THE GROUNDED CIRCUIT |
| | CONDUCTOR CONNECTED TO THE OPTIONAL |
| | STANDBY POWER SOURCE IS CONNECTED TO A |
| | GROUNDING ELECTRODE CONDUCTOR AT A |
| | LOCATION REMOTE FROM THE OPTIONAL |
| | STANDBY POWER SOURCE, THERE SHALL BE A |
| | SIGN AT THE GROUNDING LOCATION THAT |
| | SHALL IDENTIFY ALL OPTIONAL STANDBY |
| | POWER AND NORMAL SOURCES CONNECTED AT |
| | THAT LOCATION. PLANS WILL NEED TO |
| | SPECIFY IF SEP DERIVED OR NOT. |
| | |
| | 34)NOTE: PLEASE SEE 445.13 FOR FEEDER |
| | FROM GEN TO GDP. THE AMPACITY OF THE |
| | CONDUCTORS FROM THE GENERATOR TERMINALS |
| | TO THE FIRST DISTRIBUTION DEVICE(S) |
| | CONTAINING OVERCURRENT PROTECTION SHALL |
| | NOT BE LESS THAN 115 PERCENT OF THE |
| | NAMEPLATE CURRENT RATING OF THE |
| | GENERATOR. |
| | |
| | 35)NOTE: PLEASE CORRELATE FEEDER |
| | SCHEDULE AND GDP. ONE SHOWS 4/0'S 225A |
| | FEED, AND FEEDER SCHEDULE INDICATES |
| | 400A |
| | FEEDER? (F-11). PLEASE SEE PREVIOUS |
| | NOTE |
| | ON THIS REVIEW FOR CONDUCTORS/CONDUITS |
| | TO BE ON FEEDER SCHEDULE. |
| | |
| | 36)NOTE:PLEASE PROVIDE NOTE ON PLANS |
| | FOR |
| | EELECTRICAL CONTRACTOR TO PROVIDE |
| | SIGNAGE FOR ALL DISC MEANS, LOCATIONS |
| | FIRE-PUMP ETC. A "MAP" "LAYOUT" OF BLDG |
| | WILL BE REQUIRED IN FIRE COMMAND RMM |
| | FOR |
| | ALL LOCATIONS AS WELL AS EACH LOCATION |
| | OF THESE DISC'S ETC. |
| | 230.2E, 695,700.2,700 ETC |
| | |
| | 37)NOTE: PLEASE SEE NUMEROUS AREAS ON |
| | SOME PANEL SCHEDUL WHERE THE OCP |
| | EXCEEDS |
| | RATING OF AWG. PLEASE SEE 240.4 FOR |
| | EXCEPTIONS WHERE OCP MAY EXCEED AWG |
| | RATING FOR NEXT SIZE UP AND SOME MOTOR |
| | LOADS. SOME OF THESE HAVE BEEN REDLINED |
| | AT AREAS OF CONCERN. |
| | |
| | 38)NOTE: PLEASE SEE NOTE#5 ON UNIT |
| | "PANEL SCHEDULE NOTES" MENTIONS TO BE |
| | LOCAK OFF DEVICE, HOWEVER THIS COULD |
| | NOT |
| | BE LOCATED ON PANEL SCHEDULES? |
| | PLEASE NOTE: ANY PROPOSED LOCK-OFF TYPE |
| | DEVICES/ BRKRS WILL BE REQUIRED TO BE |
| | REVIEWED AND APPROVED FOR USE AS |
| | DISCONNECTING MEANS BYAHJ BEFORE |
| | INSTALLATION. |
| | |
| | 39)NOTE: PLEASE PROVIDE WIND-LOADING |
| | FOR |
| | PROPOSED LIGHT-POLES AND LT-ING |
| | FIXTURES. THIS IS REQUIRED AT THIS |
| | TIME. |
| | PLEASE ALSO PROVIDE NOTE AR LIGHTING |
| | DETAIL FOR FBC 140 MPH. |
| | |
| | 40)NOTE: PLEASE SEE POOL IS REQUIRED TO |
| | BE UNDER SEPARATE PERMIT. IF THERE IS |
| | GOING TO BE ANY "NIGHT-TIME" (AFTER |
| | DUSK) SWIMMING, PHOTOMETRICS WILL BE |
| | REQUIRED TO BE SUBMITTED TO PALM BEACH |
| | COUNTY HEALTH DEPT FOR REVIEW BEFORE |
| | SUBMITTING TO THE CITY OF WEST PALM |
| | BEACH. THIS IS ONLY A NOTE GIVEN AT |
| | THIS |
| | TIME. |
| | |
| | 41)NOTE:PLEASE SHOW CIRCUTING ON PLANS |
| | FOR ALL UNITS. THESE ARE SHOWN W/OUT |
| | CIRCUITING AT THIS TIME AND CAN NOT BE |
| | REVIEWED FOR CODE COMPLIANCE. |
| | 215.5 |
| | |
| | 42)NOTE:PLEASE PROVIDE NOTE ON PLANS |
| | FOR |
| | REQUIRED SD PLACEMENT> PLEASE SEE |
| | NFPA-72 8-1.4.2 FOR SD'S TO BE A MIN OF |
| | 3' FROM BATH DRS, KITCHEN DRS AND 20' |
| | FROM COOKING APPLIANCES WITH |
| | EXCEPTIONS. |
| | |
| | |
| | 43)NOTE: SMOKE DETECTORS ARE REQUIRED |
| | INSIDE AND OUTSIDE ALL SLEEPING ROOMS. |
| | ON EACH LEVEL OF A MULTI-LEVEL DWELLING |
| | UNIT. |
| | IN CLOSE PROXIMITY OF STAIRWAYS LEADING |
| | TO FLOORS ABOVE AND IN THE VICINITY OF |
| | BEDROOMS. |
| | PLEASE ALSO NOTE, SD'S ARE REQ'D TO BE |
| | A MIN OF 3' FROM BATHROOM DOORS AND |
| | KITCHENS. |
| | ABOVE PER:FBC 905.2, NFPA-72 8-1.4 |
| | PLEASE SEE THERE ARE A COUPLE MISSING. |
| | |
| | 44)NOTE: PLEASE SEE 240.24E FOR PANEL |
| | LOCATIONS IN DWELLING UNITS AND GUEST |
| | ROOMS OF HOTELS AND MOTELS, OVERCURRENT |
| | DEVICES, OTHER THAN SUPPLEMENTARY |
| | OVERCURRENT PROTECTION, SHALL NOT BE |
| | LOCATED IN BATHROOMS |
| | |
| | 45)NOTE:PLEASE SEE 210.52D, 210.11C3 |
| | FOR |
| | REQUIRED LOCATIONS OF GFI IN BATHRMS. |
| | THESE ARE REQUIRED TO BE WITHIN 3' OF |
| | LAV/SINK EDGE. IT IS NOT PERMITED TO |
| | CROSS OVER ONE SINK TO MEET THE |
| | REQUIREMNTS OF SECOND LAV. PLEASE |
| | EITHER |
| | ADD AN ADDITIONAL GFI OR MOVE EXISTING |
| | SHOWN TO BE IN CENTER OF THE TWO. |
| | |
| | 46)NOTE: PLEASE CLARIFY REQUIREMENST OF |
| | 210.70 FOR UNITS WHICH HAVE GRADE LEVEL |
| | ACCESS.FOR DWELLING UNITS, ATTACHED |
| | GARAGES, AND DETACHED GARAGES WITH |
| | ELECTRIC POWER, AT LEAST ONE WALL |
| | SWITCH?CONTROLLED LIGHTING OUTLET SHALL |
| | BE INSTALLED TO PROVIDE ILLUMINATION ON |
| | THE EXTERIOR SIDE OF OUTDOOR ENTRANCES |
| | OR EXITS WITH GRADE LEVEL ACCESS. |
| | |
| | 47)NOTE: PLEASE SEE SOME UNIT LAYOUT |
| | COULD NOT BE LOCATED ON PLANS. THESE |
| | UNITS ARE SHOWN FOR UNIT TYPE,(B-2, |
| | P-1, |
| | P-3 ETC) BUT DI NOT SEEM TO HAVE ANY |
| | ELECTRICAL SHOWN. THEY APPEAR TO BE |
| | BLANK? 215.5 |
| | |
| | 48)NOTE: PLEASE PROVIDE ROOM |
| | DESIGNATION |
| | ON PLANS. |
| | |
| | **** PLEASE SEE ONE SET OF PLANS HAVE |
| | BEEN REDLINED WITH MOST OF THE AREAS |
| | WHICH HAVE BEEN NOTED ON THE ABOVE |
| | COMMENTS. THESE REDLINES MAY HELP WITH |
| | SOME OF THE NOTES. |
| | |
| | **PLEASE SEE ANY POSSIBLE NOTES FROM |
| | OTHER REVIEWER(S) WHICH MAY AFFECT |
| | ELECTRICAL PLANS. |
| | |
| | **PLEASE REMOVE ALL OLD/VOIDED SHEETS |
| | FROM SETS AND INSERT ONLY NEW REVISED |
| | SHEETS INTO THREE COMPLETE SETS FOR |
| | REVIEW AND STMAPING. ONE SET OF OLD |
| | SHEETS SHOULD BE SUBMITTED FOR |
| | REFERENCE |
| | ONLY. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE TO CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | CITY OF WEST PALM BEACH |
| | CONSTUCTION SERVICES DEPT. |
| | 561-805-6717 |
| | [email protected] |
| 2004-12-07 00:00:00 | ONE SET IN ELEC FOR REVIEW. |
| | NOTES TO FOLLOW. |