| 2004-12-01 00:00:00 | DENIED | | | REFERENCE: FBC-2001 CHAPTER 1 | | | | | | 1) SEE ATTACED SHEET IN REFERENCE TO THE | | | GAS RISER DIAGRAM. A PROVISO WAS ISSUED | | | THAT REQUIRED A REVISION OF THE GAS | | | RISER DIAGRAM. SINCE THIS IS AN | | | ENGINEERED SYSTEM, SIGNED AND SEALED BY | | | THE ENGINEER OF RECORD, THE REVISION | | | SHALL BE APPROVED PRIOR TO ISSUANCE OF | | | THE GAS PERMIT. THE GENERAL CONTRACTOR | | | SHALL SUBMIT THE REVISION FOR APPROVAL. | | | | | | 2) AFTER REVISION IS APPROVED, NO PLANS | | | WILL BE REQUIRED TO BE SUBMITTED WITH | | | THE GAS APPLICATION. REFERENCE THE PRIME | | | PERMIT NUMBER FOR THE JOB WHEN | | | RESUBMITTING FOR REVIEW. | | | | | | | | | REVIEW BY KEN STEVENS | | | (561) 805-6721 | | | FAX (561) 653-2692 | | | E-MAIL [email protected] |
|