| Plan Review Notes For Permit 04110624 |
| Permit Number |
04110624 |
|
| Review Stop |
P |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2005-08-01 00:00:00 | PASSED/PROVISO | | | | | | 3/4" REQUIRED TO EACH HEATER. | | | AN RPZ BACKFLOW IS REQUIRED ON THE | | | WATER SERVICE. | | | A FULL OPEN VALVE IS REQUIRED ON THE | | | WATER DISTRIBUTION SUPPLY PIPE AT THE | | | ENTRANCE TO THE STRUCTURE. | | | SECOND FLOOR WATER RISER SHALL BE | | | UPSTREAM OF VALVE TO WATER HEATER FIRST | | | FLOOR. | | | A FULL OPEN VALVE IS REQUIRED ON THE | | | ENTRANCE TO EVERY WATER SUPPLY PIPE TO | | | EVERY DWELLING UNIT & ON THE WATER | | | SUPPLY PIPE TO EVERY WATER HEATER. | | | 606.1(5) & (7). | | | A FULL OPEN VALVE IS REQUIRED ON THE | | | BASE OF THE WATER RISER. 606.1(3). | | | KITCHEN SINK HEIGHT 11-44.24.2 AND KNEE | | | CLEARANCE 11-4.24.3 SHALL COMPLY. |
|