| Date |
Text |
| 2005-01-03 00:00:00 | BUILDING PLAN REVIEW: FAILED |
| | |
| | 1. PLANS MUST BE TAKEN TO PBC AND |
| | IMPACT |
| | FEES PAID.THE RECEIPT MUST BE |
| | SUBMITTED BEFORE A PERMIT CAN BE |
| | PRINTED. THE PLANS WILL BE STAMPED BY |
| | PBC. |
| | |
| | 2. "H" WINDOWS LIVING ROOM: |
| | THESE STOREFRONT WINDOWS ARE NOT |
| | IMPACT WINDOWS. STORM PANELS MUST BE |
| | INSTALLED.SUBMIT THE DRAWING FOR THE |
| | STORM PANELS. |
| | |
| | 3. THE SITE SPECIFIC PRODUCT APPROVAL |
| | FORM LISTS NATIONAL ACCREDITATION & |
| | MGM. |
| | AS THE THIRD PARTY QUALITY ASSURANCE |
| | BUT |
| | MIAMI-DADE COUNTY PRODUCT APPROVAL WAS |
| | SUBMITTED FOR ARCH ALUMINUM & GLASS CO. |
| | FOR THE 5 STOREFRONT WINDOWS IN THE |
| | LIVING ROOM.THE ENGINEER DRAWING SHOWS |
| | DESIGN PRESSURE +30.7, -33.4.THESE DO |
| | NOT AGREE WITH THE WINDOW SCHEDULE ON |
| | SHEET A2. |
| | |
| | 4. THE SITE SPECIFIC FORM FOR THE BUTT |
| | GLASS ASSEMBLY IN THE CAFE IS STILL NOT |
| | COMPLETED. IT APPEARS YOU PHOTOCOPIED |
| | THE FORM FROM THE STOREFRONT WINDOWS IN |
| | THE LIVING ROOM. SINCE THESE ARE SITE |
| | SPECIFIC YOU MUST SUBMIT COPIES OF THE |
| | REPORTS FROM THE TESTING AGENCY |
| | (MIAMI-DADE). THE NAME OF THE PRODUCT |
| | MUST BE ENTERED ON THE FORM (LINE 8) |
| | |
| | 5. THE FORM "LETTER OF INTENT" THOMAS |
| | M. |
| | KELAHER, P.E. SHOULD BE HAND DATED WHEN |
| | HE SIGNS & SEALS IT.ALSO THE LOT |
| | NUMBER MUST BE FILLED IN. |
| | |
| | ANY QUESTIONS PLEASE CALL: |
| | LEA SMITH, BUILDING PLANS EXAMINER |
| | 805-6713 |
| | |