2005-07-14 00:00:00********* UNSAT 3RD REVIEW ************
  
 "THE PLACE VIA CLEMATIS"
  
 PLEASE SEE COMMENTS FROM PREVIOUS TWO
 REVIEWS WHICH STILL NEED TO BE
 ADDRESSED.
  
 PLEASE ALSO SEE NEW COMMENTS DUE TO
 CHANGES IN PLANS/DESIGN AND SOME SHEETS
 MISSING FROM PREVIOUS SUBMITTED PLANS.
  
 THESE ARE TAKEN DIRECTLY FROM PREVIOUS
 TWO REVIEWS IN NUMMERICAL ORDER.
  
 1)NOTE: NOTE #1 NO, PLEASE SEE LETTER
 COULD NOT BE LOCATED IN PACKAGE.
  
 2)NOTE: NOTE #2 NO, PLEASE SEE OUTWARD
 SWINGS ON DOORS. PLEASE CORRELATE ALL
 SHEETS SHOWING ELECTRICAL ROOMS ETC.
 PLEASE HAVE PLANS INDICATE GUARD RAILS
 FOR EGRESS PROTECTION FROM SECOND FLR
 GEN RM. PLEASE UNDERSTAND ANY EGRESS IN
 CASE OF AN EMERGENCY OR OTHER MAY RESULT
 IN A LIFE SAFETY SITUATION AS SHOWN ON
 PLANS.
 PLEASE SEE DOORS WERE MOVED IN MAIN
 ELECTRICAL ROOM, HOWEVER, PLEASE SEE
 WALLS AND DOORS ARE SHOWN BUILT DIRECTLY
  
 IN FRONT OF ELECTRICAL EQUIPMENT.
 110.26
 PLEASE SEE MINIMUM STANDING/WALKING AREA
 ON THE OUTSIDE OF ELECTRICAL ROOM AFTER
 LEAVING DOOR SWING AREA. PLEASE SEE
 PLANS STILL MENTIONS: A SIGN TO BE
 PLACED AT DOORS LEAVING ELECTRICAL TO
 READ; "OPEN DOOR CAREFULLY, WATCH FOR
 CARS ON OTHERSIDE OF DOORS" PLEASE KNOW
 IN AN EMERGENCY SITUATION WHEN THE
 POSSIBILTY OF SOMEONE BEING BLINDED OR
 ON FIRE;A SIGN WILL NOT HELP IN EXITING
 ROOM AND ONCE AGAIN CREATING AN ADDITION
 LIFE SAFTEY HAZARD FOR THE PERSON(S)
 EXITING ROOM.
  
 NOTE FOR PANIC HARDWARE WAS PLACED ON
 A-SHEETS, HOWEVER PLEASE PLACE NOTE ON
 ELECTRICAL PLANS FOR ELECTRICAL RMS.
  
 3)NOTE: NOTE #3 OK.
  
 4)NOTE: NOTE #4 OK.
  
 5)NOTE: NOTE #5 OK, CIRCUITS ADDED,
 HOWEVER PLEASE SEE CIRCUITING PER ROOM
 PER 620.23,.24. ONLY ONE ELEVATOR
 MACHINE RM PER CIRCUIT.
 PLEASE SEE NEW NOTES FOR ELEV RM #4.
  
 6)NOTE: NOTE #6 NO, PLEASE SEE MANY
 RECEPTS FOR WALL SPACE ARE STILL
 MISSING. PLEASE SEE MOST LOCATIONS ARE
 REDLINED. 210.52
  
 7)NOTE: NOTE #7 OK.
  
 8)NOTE: NOTE #8 OK, HOWEVER PLEASE SEE
 NEW NOTE FOR NOTE ON E-19.
  
 9)NOTE: NOTE #9 OK.
  
 10)NOTE: NOTE #10 OK.
  
 11)NOTE: NOTE #11 OK, SEE NEW NOTES.
  
 12)NOTE: NO, SEE NOTE #3 FROM PREVIOUS
 REVIEW. PLEASE SEE SOME AREAS ARE SHOWN
 WITH LIVING RM. PLEASE ALSO SEE COMMENTS
 ABOUT CIRCUITING FOR DINING RM AREAS.
  
 13)NOTE: NOTE #13, OK, SHEETS SUBMITTED,
 HOWEVER SEE NEW NOTES DUE TO REVIEW
 BEING POSSIBLE AT THIS TIME.
  
 14)NOTE: NOTE #14 NO, PLEASE SEE MISSING
 KITCHEN GFI RECEPTS PER 210.52C1,
 210.8A6. PLEASE SEE SOME AREAS REDLINED
 ON PLANS.
  
 15)NOTE: NOTE #15 NO, PLEASE SEE
 PREVIOUS NOTES: PLEASE SEE SEE MANY
 RECEPTSWHICH ARE ON SM APPL CIRCUITS
 WHICH ARE IN AREAS NOT PERMITTED UNDER
 NEC 210.52B1
  
 16)NOTE: NOTE #16 OK.
  
 17)NOTE: NOTE #17 OK.
  
 18)NOTE: NOTE #18 OK,
  
 19)NOTE: NOTE #19 NO, SEE PREVIOUS NOTES
 #4 OF SECOND SECTION.
 MANY METER CENTERS STILL SHOWN AS
 "MAINS".
  
 20)NOTE: NOTE #20 OK.
  
 21)NOTE: NOTE #21 OK. SEE NEW NOTES.
  
 22)NOTE: NOTE #22 OK.
  
 23)NOTE: NOTE #23 OK.
  
 24)NOTE: NOTE #OK.
  
 25)NOTE: NOTE #25 OK.
  
 26)NOTE: NOTE #26 OK.
  
 27)NOTE: NOTE #27 OK.
  
 28)NOTE: NOTE #28 OK, HOWEVER SEE NEW
 NOTES.
  
 29)NOTE: NOTE #29 NO, SPECS SUBMITTED
 LIKE PREVIOUS REVIEW, HOWEVER SPECS
 SUBMITTED STILL DO NOT CORRELATE WITH
 PLANS FOR SIZING.
 PLEASE SEE NO SPECS SUBMITTED FOR SUB
 BASE FUEL TANK FOR FIRE REVIEW.
  
 30)NOTE: NOTE #30, NO, PLEASE SEE RISER
 NOTES FOR GENERATOR.
 PLEASE ALSO SEE NOTES PERATAINING TO
 RISER ETC.
  
 31)NOTE: NOTE #31 NO.
 PLEASE SEE BRKRS FROM GEN TO ATS AND OCP
 LISTED ON NOTES.
 PLEASE SEE NEW NOTES ALSO.
  
 32)NOTE: NOTE #32 NO, PLEASE SEE THERE
 ARE NUMEROUS ITEMS ON ELECTRICAL RISER
 DIAGRAM AND NOTES FOR FEEDERS ETC WHICH
 DO NOT CORRELATE.
 PLEASE SEE NEW NOTES PERTAINING TO
 "FEEDER SCHEDULE NOTES" AND "ELECTRICAL
 RISER DIAGRAM".
  
 33)NOTE: NOTE #33 OK.
  
 34)NOTE: NOTE #34, NO, SEE NEW NOTES FOR
 EQUIPMENT GROUNDING MISSING ETC.
  
 35)NOTE: NOTE #35 NO, SEE PREVIOUS TWO
 REVIEWS.
 250.6,250.24,250.110,.250.122 SEE NEW
 NOTES.
  
 36)NOTE: NOTE #36 OK, HOWEVER PLEASE SEE
 250.104 TO BE LISTED ON GROUNDING
 ELECTRODE DETAIL.
 PLEASE SEE SHEETS E-19 MAKES REFERENCES
 TO CODES THAT GROUNDING SHALL BE
 INSATLLED BY, HOWEVER PLEASE SEE FBC
 104.2.1, TECHNICAL CODES SHALL NOT BE
 USED IN LEIU OF PROVIDING THE DETAIL ON
 PLANS.
  
 37)NOTE: NOTE #37 NO, PLEASE SEE THERE
 ARE STILL LOCATIONS ON PLANS WHICH STILL
 REFERENCE CODES FROM 1996/1999 CODES.
  
 38)NOTE: NOTE #38 OK.
  
 39)NOTE: NOTE #39 OK, NO 277V SYSTEMS
 PRESENT.
  
 40)OK
  
 41)OK.
  
 42)OK.
  
 43)OK.
  
 ****************************************
 PLEASE SEE NOTES DIRECTLY TAKEN FROM
 "NEW NOTE" ON 2ND REVIEW".
  
 1)NOTE: NOTE #1 OK.
  
 2)NOTE: NOTE #2 OK.
  
 3)NOTE: NOTE #3 NO, PLEASE SEE MANY
 AREAS SHOWN AS DINING AND LIVING RM
 TOGETHER WHEN "DINING RM/AREA"
 DESIGNATION SHOULD BE MOVED TO CORRELATE
 WITH CIRCUTING SHOWN ON PLANS.
 PLEASE SEE AREAS WHERE A "HALLWAY/FOYER"
 AREA RECEPT IS ON SMALL APPLIANCE
 CIRCUIT.
 PLEASE SEE MANY AREAS REDLINED ON PLANS.
  
 4)NOTE: NOTE #4 NO, PLEASE SEE PREVIOUS
 NOTES , MANY AREAS ON PLANS WHERE METER
 CENTERS ARE STILL SHOWN AS BEING
 "MAINS", PLEASE CORRECT. SEE NEW NOTES
 ALSO.
  
 5)NOTE: NOTE #5, OK, LOAD CALCULATIONS
 AND PANEL SCHEDULES NOW SHOW AHU/HEAT
 LOADS @125%. PLEASE KNOW: ONLY THE OCP
 IS REQUIRED TO BE 125%. HOWEVER, IT IS
 PERMISSIBLE TO TO HAVE LOADS FIGURED AT
 A HIGHER AMOUNT THAN IS REQUIRED.
 NO CORRECTION IS NEEDED.
  
 6)NOTE: NOTE #6 OK.
  
 7)NOTE: NOTE #7 OK.
  
 8)NOTE: NOTE #8 NO, PLEASE SEE MANY
 RECEPTS STILL MISSING . PLEASE SEE
 PREVIOUS NOTES FROM BOTH REVIEWS.
  
 9)NOTE: NOTE #9 OK, SEE ALL SHEETS WERE
 SUBMITTED, HOWEVER PLEASE SEE SOME NOTES
 PERTAINING TO THESE SHEETS WHICH COULD
 NOT REVIEWED ON PREVIOUS SUBMITTAL.
  
 10)NOTE: NOTE #10 OK, HOWEVER PLANS SEE
 ELECTRICAL RM #1 EAST ELEVATION, ONE
 SHOWS 110,000 AND THE OTHER 100,000?
  
 11)NOTE: NOTE: OK, ALL ELECTRICAL
 REMOVED FROM VAULT.
  
 12)NOTE: NOTE #12 NO, SAME COMMENT.
  
 13)NOTE: NOTE #13 OK.
  
 14)NOTE: NOTE #14 OK.
  
 15)NOTE: NOTE #15 OK, HOWEVER SEE NEW
 NOTES;
  
 16)NOTE: NOTE #16 NO, PREVIOUSLY NOTED
 ON THIS REVIEW.
  
 17)NOTE: NOTE #17 OK, HOWEVER SEE NEW
 NOTES FOR FEED FROM FPL.
  
 18)NOTE: NOTE #18 NO, PLEASE SEE ALL
 UNPROTECTED CONDUCTORS/BUS-DUCT IS STILL
 SHOWN "INSIDE" BLDG. INSTALLATION AS
 SHOWN SHALL NOT BE PERMITTED AS SHOWN.
 THIS WAS GONE OVER IN MEETING ,YET PLANS
 STILL CAME BACK WITH NO CORRECTIONS?
 PLEASE SEE 230.70,230.6 ETC.
  
 19)NOTE: NOTE #19 NO, PLEASE SEE HDP-2
 STILL SHOWN AS A "SHUNT TRIP".??
  
 20)NOTE: NOTE #20 NO,? PLEASE SEE HDP-2
 IS STILL SHOWN AS GF PROTECTED. PLEASE
 ALSO SEE NEW NOTE ABOUT ATS.
 PLEASE SEE 230.95,240.13 GF PROTECTION
 IS NOT REQUIRED, HOWEVER MAY BE
 INSTALLED. PLEASE ATS NOTE:
  
 21)NOTE: NOTE #21 OK? NOT NEEDED ,
 HOWEVER MAY BE DONE.
  
  
 ****************************************
 NEW NOTES FOR 3RD REVIEW.
  
 1)NOTE: PLEASE SEE ELEVATOR RM #4.
 PLEASE SEE STATE ELEVATOR CODE. ELEVATOR
 MACHINE ROOM SHALL CONTAIN NO OTHER
 EQUIPMENT, USEAGE , ELECTRICAL EQUIPMENT
 ETC UNLESS DIRECTLY USED FOR ELEVATOR
 EQUIPMENT.
 PLEASE SEE ROOM #4, SHOWS "TRASH RM, AND
 "MECH RM" THIS IS NOT PERMITTED.
 THESE RMS WILL BE REQUIRED TO BE
 SEPARATED.
 PLEASE ALSO SEE REQUIREMENTS FOR TRASH
 RMS UNDER LS 101.
  
 2)NOTE: PLEASE CORRELATESIZES OF
 SWITCH GEAR MAINS. PLEASE SEE ONE SHEET
 SHOWS 3000A'S, RISER SHOWS 4,000A'S?
 PLEASE SEE REDLINED PLANS. SG #5?
  
 3)NOTE: PLEASE SEE LS 7-9. PLEASE SEE
 ALTERNATING CIRCUITS FOR EM LTS IN
 STAIRS WILL BE REQUIRED. THIS IS TO
 ALLEAVIATE EGRESS AREAS TO BE IN TOTAL
 DARKNESS BYT THE TRIPPING OF A SINLGE
 BRKR. PLEASE SEE A BATTERY BACK UP
 FIXTURE MAY BE INSTALLED AT EVERY OTHER
 LEVEL AS AN OPTION. PLEASE SEE EGRESS
 HALLWAYS AS SHOWN ON PLANS ALREADY HAVE
 BATTERY BACK LTS SHOWN. EVEN IF A BRKR
 FROM EDP TRIPS, EGRESS LIGHTNING WILL
 STILL BE PROVIDED.
  
 4)NOTE: PLEASE SEE SHEET #19 IS NOW
 SUBMITTED. PLEASE SEE SD NOTES:
 ONE NOTE MENTIONS FOR SD'S TO BE WIRED
 TO KITCHEN/BATH LIGHTING CIRCUIT,
 HOWEVER CIRCUITING ON PLANS DO NOT
 CORRELATE WITH THIS STATEMENT.
 PLEASE SEE KITCHEN/BATH LIGHTING
 CIRCUITS DO NOT INDICATE REQUIRED ARC
 FAULT PROTECTION AS REQUIRED UNDER 2002
 NEC 210.12. PLEASE ADJUST NOTE OR
 PLANS/CIRCUITS ETC.
  
 PLEASE SEE SECOND SD NOTE MENTIONS SD'S
 MAY BE WITHIN 20' OF KITCHEN COOKING
 APPLIANCE. THIS IS PERMITTED HOWEVER
 PLEASE SEE NFPA-72 8-1.4.2, A SPECFIC
 TYPE OF SD'S SHALL BE REQUIRED FOR ANY
 SMOKE DETECTORS CLOSER THAN 20' TO A
 COOKING APPLIANCE.
  
 5)NOTE: PLEASE CORRELATE RISER , RISER
 NOTESETC, PLEASE SEE RISER, PANEL
 SCHEDULES ETC INDICATE BUS-DUCT AND ALOS
 INDICATES FEEDERS ETC.
 PLEASE SEE NUMEROUS ITMES WHICH DO NOT
 CORRELATE.
  
 A) PLEASE SEE MAINS LISTED ON RISER
 DIAGRAM EQUIPMENT SCHEDULE ITME #4? THIS
 COULD NOT BE LOCATED ON RISER.
  
 B) PLEASE SEE MAIN DISC SHOWN AS 150A
 FOR ELEVATORS , YET NOTE MENTIONS
 200A'S.
  
 C)PLEASE SEE FEEDER SCHEDULES AND
 EQUIPMENT NOTES DO NOT CORRELATE FOR
 MAINS SEC'S OR BUS-DUCT.
  
 D)PLEASE SEE FEEDER SCHEDULE 5,7,8,9 AND
 10. PLEASE SEE THESE DO NOT CORRELATE
 WITH PANEL SCHEDULES FOR FEEDERS, ETC.
 PLEASE SEE THESE DO NOT INCLUDE ANY
 EQUIPMENT GRNDS?
  
 E)NOTE:PLEASE SEE SW GR #2 ONLY SHOWS
 ONE FEEDER TO MC'S. ETC ETC.
 MOST OF THESE ITEMS WERE REDLINED.
  
 6)NOTE: PLEASE SEE SEE FEEDER SCHEDULE
 MENTIONS ALL FEEDS TO APT UNITS TO BE IN
 EMT? PLEASE VERIFY THIS.PLEASE SEE EMT
 MAY NOT BE INSTALLED IN CONCRETE.
 ONLY IF OVERHEAD.
  
 7)NOTE:PLEASE SEE EQUIPMENT GROUNDING
 CONDUCTOR SHOWN FROM FPL TO FIRST MEANS
 OF DISCONNECT FOR FIRE PUMP. PLEASE SEE
 250.6, 250.24, EQP GRNDS SHALL ONLY BE
 INSTALLED "AFTER" THE FIRST MENS OF
 DISCONNECT.
  
 8)NOTE: PLEASE SEE OTHER CONDUITS ETC ON
 RISER MISSING ANY MENTION OF EQUIPMENT
 GROUNDING CONDUCTORS. PLEASE SEE FEEDERS
 FROM GEN TO FIRE PUMP AND EM ATS, EDP(SW
 GR #4).
 250.110, 250.122
  
 9)NOTE: PLEASE SEE ATS FOR EM STAND-BY
 IS NOTED AS GFCI PROTECTED?
 PLEASE SEE EQUIPMENT PROTECTION WOULD BE
 GF PROTECTED, NOT GFCI FOR PERSONNEL
 PROTECTION. PLEASE SEE GF PROTECTION OS
 NOT REQUIRED ON EM STAND-BY SYSTEMS OF
 THIS VOLTAGE AND SIZE. 240.13,230.95
 ETC. THIS IS ONLY NOTED AS TO WHY ?
 PLEASE SEE 701.17 FOR "LEGALLY REQUIRED
 STAND-BY SYSTEMS".
  
 10)NOTE: PLEASE SEE PREVIOUS NOTE FROM
 THIRD REVIEW5)D: WHICH MENTIONS
 CORRELATION OF FEEDER SCHEDULES.
 PLEASE SEE FEEDERS FOR ALL RTU'S, POOL
 PANEL. PLEASE SEE EDP'S AND HDP'S PANEL
 SCHEDULES AND FEEDERS INDICATED AT THOSE
 LOCATIONS. PLEASE CORRELATE.
 SEE NEW NOTE IN REF TO POOL PANEL.
  
 11)NOTE: PLEASE SEE NOTE #6 ON NOTES
 LISTED ON THE UPPER RIGHT HAND CORNER OF
 RISER DIAGRAM SHEET. THIS MENTIONS:
 "ONLY FOUR ELEVATOR THRU EMERGENCY
 GENERATOR"??
 PLEASE CLARIFY AS ONLY ONE ELEVATOR IS
 LISTED ON SWITCH GEAR MAIN #4?
 PLEASE SEE FIRE DEPARMENT REQUIREMENTS
 FOR ELEVATOR ON EM GEN SHALL ALSO BE
 STRETCHER ACCESSSIBLE. SEE ANY FIRE
 REVIEW NOTES FOR THIS.
  
 12)NOTE: PLEASE SEE SWITCH GEARR #4
 INDICATES CONNECTED LOAD OVER 1600 A'S
 ON A 2000A MAIN WITH A 2000A FEED FROM
 FPL. THIS IS OK, HOWEVER , PLEASE SEE
 ATS IS ALSO SHOWN AS HAVING 2000A
 CAPACITY, AND SERVICE ENTRANCE
 CONDUCTORS FROM FPL SHOWN FOR 2000A'S
 YET GENERATOR ONLY SHOWS A 1600A MCB?
 PLEASE EITHER INCREASE FEED FROM
 GENERATOR TO CORRLELATE WITHALL OTHER
 EQUIPMENT TO 2000A'S OR PLEASE PROVIDE
 LOAD CALCUALTIONS FOR ANY DERATING.
 PLEASE BEAR IN MIND FUTURE POSSIBLE
 LOADS OF ANY ADDITIONS.
 PLEASE SEE 90.8WHICH REQUIRES PLANS
 AND SPECIFICATIONS THAT PROVIDE AMPLE
 SPACE IN RACEWAYS, SPARE RACEWAYS, AND
 ADDITIONAL SPACES ALLOW FOR FUTURE
 INCREASES IN THE USE OF ELECTRICITY.
 DISTRIBUTION CENTERS LOCATED IN READILY
 ACCESSIBLE LOCATIONS PROVIDE CONVENIENCE
 AND SAFETY OF OPERATION.
 THE REQUIREMENT FOR PROVIDING THE
 EXCLUSIVELY DEDICATED EQUIPMENT SPACE
 MANDATED BY 110.26(F) SUPPORTS THE
 INTENT OF 90.8(A) REGARDING FUTURE
 INCREASES IN THE USE OF ELECTRICITY.
 DISTRIBUTION CENTERS SHOULD CONTAIN
 ADDITIONAL SPACE AND CAPACITY FOR FUTURE
 ADDITIONS AND SHOULD BE CONVENIENTLY
 LOCATED FOR EASY ACCESSIBILITY.
 THIS SHOULD ALSO BE TAKEN IN NOTE FOR
 ALL SERVICE EQUIPMENT AND THE
 POSSIBILITY OF ANY FUTURE EXPANTION.
 PLEASE SEE NO LOAD CALCULATIONS WERE
 SUBMITTED FOR MAINS 4 AND 5. IF LOAD
 CALCULATIONS ARE SUBMITTED, PLEASE SHOW
 ALL CONTINUOUS LOADS (3OR MORE HOURS) AT
 125%. 215.3,100,230.42 ETC.
  
 13)NOTE: PLEASE SEE POOL PANEL IS NOW
 SHOWN ON RISER AS NOTED IN NEW NOTE #10,
 HOWEVER PLEASE SEE NO POOL PANEL
 SCHEDULE WAS SUBMITTED? PLEASE ALSO
 INCLUDE LOADS ON PANEL. PLEASE SEE
 PREVIOUS NOTE ABOUT FEEDERS LISTED ON
 RISER SCHEDULES, RISER AND HDP-3.
  
 14)NOTE: PLEASE SEE MANY OF THE ABOVE
 ITEMS AS NOTED HAVE BEEN REDLINED ON
 PLANS AT AREAS OF NOTES. THIS IS IN NO
 WAY EVERY LOCATION OF SAID COMMENTS.
  
 15)NOTE: PLEASE BE SURE TO SEE ANY
 POSSIBLE COMMENTS FROM OTHER REVIEWERS
 WHICH MAY AFFECT ELECTRICAL PLANS.
 IE: DOOR SWINGS, EGRESS ETC.
  
 16)NOTE: PLEASE KNOW, A RESPONSE LETTER
 LISTING REVIEWERS COMMENTS AND ACTION
 TAKEN BY DESIGN TEAMWOULD HELP IN THE
 REVIEW PROCESS.
  
 17)NOTE: PLEASE REMOVE ANY OLD/VOIDED
 SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO COMPLETE SETS FOR REVIEW AND
 STAMPING.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW.
 IT IS SUGGEESTED AN ADDITIONAL MEETING
 BE SET UP TO GO OVER ALL COMMENTS ONCE
 ALL REVIEWS ARE DONE FOR TRADES.
 IF THERE ARE ANY QUESTIONS, PLEASE DO
 NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
2005-07-12 00:00:00ONE ROLL AND SPECS BOOKS IN ELECTRICAL