| Date |
Text |
| 2004-12-06 00:00:00 | DENIED: |
| | 1.INDICATE HOW THE MAKE AIR FOR THE |
| | GARAGE AREA WILL BE ACHIEVED. |
| | |
| | 2.PLAN SHEET M-1 THROUGH M-5, |
| | ELEVATOR LOBBY SUPPLY AIR FROM ABOVE. |
| | PLAN DOES NOT INDICATE ANY FIRE SMOKE |
| | DAMPERS OR SHAFT.PER 2001 FBC(M)607.6, |
| | SPECIFIC LOCATION OF FIRE DAMPERS & FIRE |
| | DOORS ARE TO BE IDENTIFIED ON PLANS. |
| | DETAIL OF FIRE DAMPERS & ACCESS DOORS |
| | ARE ALSO REQUIRED. |
| | |
| | 3.PLEASE CLARIFY CONDENSING UNITS |
| | LOCATED IN THE GARAGE AREA UNDER A ROOF |
| | WITH NO CROSS VENTILATION. |
| | |
| | 4.M-1 ELEVATOR 2 & 3 LOBBY AREA FLEX |
| | DUCT IS INDICATED AT THE RATED |
| | PENETRATION. PER 2001 FBC(M)607.1.3 |
| | EXCEPTION #3 ITEMS 1 THROUGH 4 SHALL |
| | APPLY. |
| | |
| | 5.DUCT FOR THIS RISER REDUCES |
| | DOWNWARD UNIT THE 1ST FLOOR AND THEN |
| | INCREASES AGAIN, PLEASE CLARIFY. |
| | |
| | 6.M-2 EF5 & EF6 LOCATED AT THE FLOOR |
| | LEVEL IN COMPACT CAR SPACES. |
| | PROTECTION FROM DAMAGE REQUIRED PER |
| | 2001 |
| | FBC(M)303.4. |
| | |
| | 7.M-3 EF-7 IS LOCATED THAT THE |
| | EXHAUST WILL BE RECIRCULATED BACK INTO |
| | THE GARAGE ENTRANCE IN VIOLATION OF |
| | 501.3. |
| | |
| | 8.M-3 EF-2,3,4,7, & 8 TERMINATING AT |
| | THE ALLEY.PER 2001 FBC(M)705.1.THIS |
| | APPLIES FOR OPENINGS INTO THE ALLEY |
| | WAY. |
| | |
| | 9.M-5 SF-1 TO STAIR #1 MAKE-UP AIR |
| | SHALL NOT BE TAKEN FROM PARKING AREAS, |
| | STREETS OR ALLEYS PER 2001 |
| | FBC(M)401.5.1. |
| | |
| | 10. M-6 EMERGENCY GENERATOR ROOM, A |
| | FIRE |
| | DAMPER IS INDICATED ON THE GENERATOR |
| | INTAKE TO THE RADIATOR.PROVIDE THE |
| | MANUFACTURER APPROVAL FOR THIS |
| | APPLICATION. |
| | |
| | 11. M-6 PLEASE CLARIFY 6" MUFFLER |
| | EXHAUST.NOTATION INDICATES 6" PIPE |
| | UNDER SLAB.WILL THIS BE POURED INTO |
| | THE SLAB BETWEEN THE FPL VAULT OR |
| | PENETRATING THROUGH THE VAULT |
| | UNDERGROUND? |
| | |
| | 12. PROVIDE ELEVATION FOR THE |
| | TERMINATION OF THE MUFFLER EXHAUST. |
| | PROVIDE DISTANCE FROM THE TERMINATION |
| | TO |
| | WINDOWS AND AIR INTAKES. |
| | |
| | 13. PROVIDE DETAIL FOR THE FILL PIPING |
| | AND LOCATION OF THE FILL FOR THE FUEL |
| | OIL TO THE GENERATOR. |
| | |
| | 14. M-3 THROUGH M-6 INDICATE DRYER & |
| | TOILET EXHAUST TERMINATING INTO THE |
| | GARAGE.PER 2001 FBC(M)501.3, EXHAUST |
| | SHALL DISCHARGE OUTDOORS WHERE IT WILL |
| | NOT CREATE A NUISANCE OR BE |
| | RECIRCULATED |
| | BY THE VENTILATION SYSTEM.EXHAUST |
| | SHALL NOT BE DIRECTED ONTO WALKWAYS PER |
| | 2001 FBC(M)401.5.2. |
| | |
| | 15. M-9 & M-10 INDICATE SHEET 9 OF 21 |
| | AND 10 OF 21.THERE ARE ONLY 17 |
| | MECHANICAL SHEETS. |
| | |
| | 16. RETURN AIR MISSING FROM UNIT |
| | L/WB-4. |
| | CERTIAN UNITS INDICATE RETURN AIR |
| | PLENUMS.PER 2001 FBC(M)602.2.1, NO |
| | COMBUSTIBLES ALLOWED ABOVE THE CEILING |
| | IN THE RETURN AIR PLENUM. |
| | |
| | 17. M-11 INDICATE ACCESS AND CLEARANCES |
| | FOR THE DUCTWORK INSTALLED UNDER THE |
| | POOL.WILL THIS BE INSULATED? |
| | |
| | 18. M-11 & M-12 CONDENSING UNITS |
| | LOCATED |
| | ON THE ROOF OR ARE THEY ENCLOSED? |
| | PLEASE NOTE, CONDENSING UNITS LOCATED |
| | ON |
| | THE ROOF SHALL COMPLY WITH 2001 FBC |
| | 1511.7 FOR THE CLEARANCE BETWEEN THE |
| | ROOF SURFACE AND THE BOTTOM OF THE |
| | SUPPORT RAIL. |
| | |
| | 19. M-15 CORRIDOR PRESSURIZATION DETAIL |
| | SHOWS 2" FIRE RATED CHASE.SHOULD THIS |
| | READ 2 HOUR FIRE RATED CHASE? |
| | |
| | 20. M-16 RTU SCHEDULE INDICATES ALL |
| | UNITS 60 TONS, THIS IS COMBINED.THE |
| | PLAN INDICATES 2 EACH 10.5 TON & 2 EA |
| | 13 |
| | TON UNITS.DUCT SMOKE DETECTORS ARE |
| | REQUIRED IN ACCORDANCE WITH 2001 |
| | FBC(M)606. |
| | |
| | 21.M-16 SPECIFIC DRYERS INDICATED ON |
| | DRYER SCHEDULE - SOME MODELS WOULD |
| | STILL |
| | EXCEED THE 25 FT MAXIMUM REQUIREMENT. |
| | SPECIFIC DRYERS ARE TO BE INSTALLED FOR |
| | FINAL INSPECTION. |
| | |
| | 22. M-17 PRIMARY AIR CHASE DETAIL SHOWS |
| | ACCESS DOOR.FIRE/SMOKE DAMPERS & |
| | ACCESS DOORS SHALL ALSO BE LOCATED ON |
| | THE PLAN PER 2001 FBC(M)607.6. |
| | |
| | 23. PROVIDE OUTSIDE AIR CALCULATIONS |
| | FOR |
| | ALL AREAS, RESIDENCE, COMMON AREAS, |
| | EQUIPMENT RMS, MECH, ELEC, PUMP RMS, |
| | STORAGE RMS.SHOW COMPLIANCE WITH 2001 |
| | FBC(M)402 OR TABLE 403.3. |
| | |
| | 24. M-16 SMOKE CONTROL SEQUENCE OF |
| | OPERATION.SMOKE CONTROL SHALL COMPLY |
| | WITH ONE OF THE ITEMS DESCRIBED IN |
| | 412.5 |
| | OF THE 2001 FBC.INDICATE WHICH |
| | PROCESS |
| | WILL BE USED FOR REMOVAL OF PRODUCTS OF |
| | COMBUSTION. |
| | |
| | 25. PROVIDE MANUAL J CALCULATIONS IN |
| | ACCORDANCE WITH 2001 FBC CHAPTER 13. |
| | |
| | 26. PROVIDE DETIAL FOR THE CONDENSATE. |
| | INDICATE TERMINATION. |
| | |
| | PLEASE NOTE, ADDITIONAL COMMENTS NOT |
| | ADDRESSED IN THIS REVIEW MAY OCCUR ON |
| | RESUBMITTAL DUE TO THE REPONSE TO |
| | COMMENTS AND THE INCOMPLETION OF PLANS |
| | SUBMITTED. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |
| | CONTACT PATTY KRAUSS AT (561)805-6719. |