2005-03-02 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
  
 A) FROM PREVIOUS REVIEW:
  
 2) SHT P-2 SANITARY RISER DIAGRAM, AT
 THE WASH MACHINE, THE CLEANOUT SHALL BE
 LOCATED 4 FEET ABOVE THE FLOOR FOR
 ACCESS OR SHALL LOOK OUT TO THE
 EXTERIOR OF THE WALL. SECTION 708.10
 4) SHT P-2 GAS ISOMETRIC SHOWS NEW
 LOCATION OF GAS METER, BUT UPSTREAM OF
 THE METER IS THE GAS GRILL (30K BTU).
 THIS APPLIANCE SHALL BE SHOWN
 DOWNSTREAM OF THE METER/REGULATOR.
 5) THE FOLLOWING INFORMATION IS
 REQUIRED FOR GAS PERMIT:
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE. - ALL CUT SECTION LENGTHS
 ARE NOT SHOWN ON ISOMETRIC.
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE IF BEING USED.
 C. TYPE OF GAS, (LP OR NATURAL)
 D. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2001 FUEL GAS CODE SECS. 401.8
 THRU 402.5.2 AND TABLES 402(1) THRU
 402(34). - INDICATE TABLE/TABLES USED. -
 TOTAL BTU LOAD IS NOT SHOWN AND THE
 TABLES USED ARE NOT SHOWN.
 E. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM
 PER FBC-2001 FUEL GAS CODE APPENDIX A -
 USE OF CAPACITY TABLES (A)(3).
 F. SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE) PER FBC-2001 FUEL
 GAS CODE SECTION 304. - FOR DRYER ROOM
 G. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 H. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY
 LINES THE DISTANCE OF THE TANK FROM ALL
 SOURCES OF IGNITION, OTHER CONTAINERS,
 BUILDINGS, AND THE LOCATION OF ANY
 BUILDING OPENINGS BELOW THE RELIEF VALVE
 OF THE TANK PER NFPA 58, TABLE 3-2.2.2.
 I. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK
 AND APPURTENANCES PER NFPA 58. IF THE
 TANK IS BELOW GROUND THE CONTAINER SHALL
 BE SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
 6) ENGINEERS SHALL LEGIBLY INDICATE THE
 NAME, ADDRESS, AND LICENSE NUMBER ON
 EACH SHEET. IF PRACTICING THROUGH A
 DULY AUTHORIZED ENGINEERING BUSINESS THE
 ENGINEER SHALL AS WELL AS INDICATE THE
 NAME, ADDRESS, AND CERTIFICATE OF
 AUTHROIZATION NUMBER OF THE ENGINEERING
 BUSINESS ON EACH SHEET. FAC
 61G15-23.002(2) & FS 471.025
 7) A PROFESSIONAL ENGINEER SHALL SIGN
 HIS NAME PER FAC 61G15-23.002(1) & FS
 471.025. PER FBPE INITIALS ARE NOT
 ACCEPTABLE. IF THIS IS YOUR LEGAL
 SIGNATURE, A SIGNED/SEALED/DATED
 NOTORIZED LETTER INDICATING YOUR LEGAL
 SIGNATURE IS REQUIRED FOR OUR FILES.
 8) PER ZONING NOTE THE GARAGE WILL NOT
 BE BUILT. PLEASE INDICATE WHERE THE
 WATER HEATER WILL BE LOCATED. INDICATE
 IF THE WATER HEATER WILL BE RATED FOR
 OUTSIDE USE OR IF IT WILL BE LOCATED
 INSIDE. SECTION 104.2.1
 *************NEW COMMENT***********
 1B) ONLY THE FIXTURES WITHIN THE
 BATHROOM GROUP SHALL CONNECT THE THE
 WET-VENTED HORIZONTAL BRANCH DRAIN. ANY
 ADDITIONAL FIXTURES SHALL DISCHARGE
 DOWNSTREAM OF THE WET VENT. THE W/M
 SHALL CONNECT DOWNSTREAM OF THE TOILET
 AND LAV OF THE POWDER ROOM .
  
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved