| Date |
Text |
| 2004-10-09 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 CHAPTER 1 |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | |
| | 1) SHT P-1 SANITARY RISER DIAGRAM DOES |
| | NOT MEET CODE REQUIREMENTS. |
| | A) FIRST FLOOR TUB NOT VENTED, SECTION |
| | 909.2.1 - SEE RED LINE CORRECTION. |
| | B) BATH #2 THIRD FLOOR TUB NOT VENTED. |
| | BATH #2 RED LINE CORRECTION SHOWN. SEC. |
| | 901.2.1 |
| | C) WASH MACHINE SHALL NOT DRAIN THROUGH |
| | THE WET VENT OF THE BATHROOM GROUP. SEC. |
| | 909.1 - WASH MACHINE REQUIRES A STAND- |
| | PIPE, SECTIONS 1002.1/802.4 - W/M REQUI- |
| | RES A CLEANOUT 4' ABOVE THE FLOOR PER |
| | SECTION 708.10. - SEE RED LINE CORRECT- |
| | ION. |
| | D) MASTER BATH SHOWER & TUB NOT VENTED. |
| | SECTION 901.2.1 - SEE RED LINE CORRECT- |
| | ION. |
| | 2) A WATER RISER DIAGRAM IS REQUIRED PER |
| | SECTION 104.3.1.1. |
| | 3) AN RPZ BACKFLOW WILL BE REQUIRED FOR |
| | EACH BUILDING UNLESS EACH UNIT HAS AN |
| | INDIVIDUAL METER. |
| | 4) IF AN RPZ BACKFLOW IS REQUIRED ON |
| | EACH BUILDING, THERMAL EXPANSION CONTROL |
| | WILL BE REQUIRED. THIS SHALL BE SHOWN ON |
| | THE WATER HEATER DETAIL. SEC. 607.3.2. |
| | 5) A SEPARATE PERMIT & PLANS FOR IRRI- |
| | GATION WILL BE REQUIRED. |
| | 6)ENGINEERS SHALL LEGIBLY INDICATE THEIR |
| | NAME, ADDRESS AND LICENSE NUMBER ON EACH |
| | SHEET. IF PRACTICING THROUGH A DULY |
| | AUTHORIZED ENGINEERING BUSINESS, ENGIN- |
| | EERS, ENGINEERS SHALL LEGIBLY INDICATE |
| | THEIR NAME AND LICENSE NUMBER, AS WELL |
| | AS, THE NAME, ADDRESS AND CERTIFICATE OF |
| | AUTHORIZATION NUMBER OF THE ENGINEERING |
| | BUSINESS ON EACH SHEET. A TITLE BLOCK |
| | WILL SATISFY THIS REQUIREMENT. FAC |
| | 61G15-23.002(2) - FS 471.025 |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |