Plan Review Notes
Plan Review Notes For Permit 04080107
Permit Number 04080107
Review Stop P
Sequence Number 2
Notes
Date Text
2004-10-14 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 CHAPTER 1
 FBC-2001 CHAPTER 11
 FBC-2001 BUILDING
 NFPA-99C MED-GAS
  
 FROM PREVIOUS REVIEW: COMMENT NUMBER TO
 REMAIN THE SAME TO AVOID CONFUSION.
 3) SHT A.1 SHOW CLEAR FLOOR SPACE REQUI-
 RED BY SECTION 11-4.24.5 WHICH SHALL BE
 PROVIDED IN FRONT OF THE SINKS TO ALLOW
 FORWARD APPROACH. THIS IS FOR THE SINKS
 IN THE COFFEE ROOM AND THE CONFERENCE
 ROOM. SINKS SHALL COMPLY WITH SECTION
 11-4.24 AND ALL SUBSECTIONS. DETAIL DOES
 NOT SHOW HEIGHT 11-4.24.2, KNEE CLEARAN-
 CE 11-4.24.3, SINK DEPTH 11-4.24.4,
 CLEAR FLOOR SPACE 11-4.24.5, (ONLY THE
 TURNING AREA IS SHOWN), SEE FIG. 32,
 EXPOSED PIPES AND SURFACES 11-4.24.6.
 6) SHT P-1 X-RAY PROCESSOR, SUBMIT MAN-
 UFACTURE SPECIFICATION/INSTALLATION
 SHEETS. THIS PROCESSOR MAY REQUIRE A
 CHEMICAL NUTRALIZER AND/OR A METAL INT-
 ERCEPTOR. IF EITHER IS REQUIRED, RODNEY
 COMPO, ENVIRONMENTAL COMPLIANCE SHALL BE
 CONTACTED. WASTE ORD. #2938-96. TO CON-
 TACT MR. COMPO (561) 837-4074. - NO RES-
 PONSE NOTED TO THIS COMMENT.
 7) SHT P.1 UNDER COUNTER WATER HEATER
 SHALL BE ACCESSIBLE. PLEASE SUBMIT A DE-
 TAIOL. SECTION 501.4. - NO RESPONSE NOT-
 ED.
 8) SHT P.1 INDICATE TYPE OF SINK LOCATED
 IN THE CLOSET WITH THE VACUUM AND THE
 AIR COMPRESSOR. SECTION 104.2.1 - NO RE-
 SPONSE NOTED TO THIS COMMENT.
 11) SHT P.4 WATER RISER DIAGRAM, AIR
 CHAMBERS ARE NOT APPROVED. DELETE FROM
 RISER DIAGRAM. SECTION 604.9 - WATER
 HAMMER ARRESTORS REQUIRED BY SECTION
 604.9, (AT ICE MAKERS, DISH WASHERS, &
 WASH MACHINES), SHALL BE LOCATED NEAR
 THE FIXTURES IN AN "EFFECTIVE RANGE" NOT
 IN THE CEILING AS SHOWN. PDI-WH 201 AND
 MANUF. INSTALLATION INSTRUCTIONS. - SHOW
 WATER HAMMER ARRESTORS ON RISER DIAGRAM
 WHERE REQUIRED.
 12) SHT WATER FILTER SHALL COMPLY WITH
 NSF-42, OR NSF-58 WHICH EVER APPLIES.
 SECTION 611.1 THRU 611.4. SUBMIT MANUF.
 SPECIFICATIONS. - NOT SUBMITTED.
 13) BACKFLOW REQUIRED AT X-RAY PROCESSOR
 PER SECTION 608.16.9 - THIS IS SHOWN ON
 THE ICE MAKER AND NOT ON THE X-RAY PRO-
 CESSOR.
 15) SHT P.5 COMPRESSOR DETAIL NOW CALLS
 FOR A 4" METAL VENT PIPE SHOWN ON SHEET
 AC-1. INDICATE THE TERMINATION POINT FOR
 THIS VENT PIPE. PROVIDE A DETAIL FOR THE
 TRANSITION FROM 2" PVC TO 4" METAL DUCT.
 SPECIFY MATERIAL OF METAL DUCT. T-FIN
 NOT APPROVED FOR THIS APPLICATION.
 16) SHT P.5 VACUUM DETAIL NOT APPROVED.
 SEE SECTION 4-5.2.1.3 LIQUIDS FROM A
 LEVEL 3 VACUUM SYSTEM PER 4-5.2.2 SHALL
 BE DIRECTLY CONNECTED TO THE SANITARY
 DRAINAGE SYSTEM THROUGH AN APPROIATELY
 TRAPPED AND VENTED DRAIN. SEE ATTACHED
 SHEETS FROM FIRST REVIEW.
 ------------SECOND NOTICE--------------
 *********WHEN RESUBMITTING PLANS********
 PLEASE CLEARLY INDICATE THE REVISION AND
 REMOVE AND REPLACE ANY PAGES AS NECESS-
 ARY. SUBMIT (1) SET OF OLD DRAWINGS WITH
 THE PLANS WHEN RESUBMITTING PLANS. A
 TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW NUMBER, WITH A DESCRIPTION OF THE
 REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN
 BE FOUND, WILL HELP TO EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]