2005-12-30 00:00:00********** UNSAT **********
  
 1)NOTE: PLEASE SEE PREVIOUS NOTES DATED
 11/21/05, 10/04 ETC.
 GENERATOR WAS TO DONE UNDER A SEPARATE
 PERMIT. THIS NOTICE TO BLDG CONTRACTOR
 WAS REDLINED ON PLANS IN 10/04", AND A
 PERMIT APPLICATION FOR GENERATOR WAS NOT
 MADE UNTIL 11//05.
 IT IS THE UNDERSTANDING OF THIS OFFICE
 THAT THE GENERATOR IS ALREADY INSTALLED
 AND WIRED INTO SERVICE. PLEASE SEE FBC
 104AND FS 468 WHICH STATES WORK SHALL
 NOT COMMENCE WITH OUT THE POSTING OF
 SAID PERMIT FOR THE SCOPE OF WORK TO BE
 PERFORMED.
 PLEASE SEE A POSSIBLE 4X FEE MAY BE
 ADDED TO SAID GEN PERMIT BY INSPECTOR OR
 ELECTRICAL PLAN REVIEW FOR GEN.
  
  
 2)NOTE: PLEASE SEE PREVIOUS REVIEW WHICH
 REQUIRES ALL EQUIPMENT/HEAT LOADS FOR
 AHU SHALL BE FIGURED AT 100%.THIS IS
 DONE.PLEASE KNOW, IT IS POSSIBLE TO SHED
 THE HEAT LOAD, HOWEVER A DETAIL ON
 METHOD AND WIRING OF THIS WAS REQUIRED
 TO BE PLACED ON PLANS, WHICH IS NOT.
 702.5, 220,215.5
 *** PLEASE ALSO SEE GEN SPECS FOR MAX
 LOADING, AS LOAD AT PRESENT IS 12.91 KW
 ON A 13KW GEN. THIS CURRENTLY MAY EXCEED
 THE 80% RECOMMENDED BY MANUFACTURE.
 PLEASE SEE SPECS FOR MAX CONTINUOUS LOAD
 FOR NAT GAS AND FOR LP.
  
 3)NOTE: PLEASE SEE ORIG PLANS DID NOT
 SHOW THE LOCATION OF THE DISCONNECTING
 MEANS FOR GENERATOR. PLEASE SEE 230.72
 AND 225.34 WHICH REQUIRES ALL MAINS TO
 BE GROUPED. PLEASE SEE A MCB IN THE GEN
 PANEL WOULD MEET THIS REQUIREMENT.
 PLEASE ADJUST PLANS AND REVISE.
  
  
 ** PLEASE SUBMIT THE ABOVE FOR REVIEW.
 IF THERE ARE ANY QUESTIONS, PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved