| Date |
Text |
| 2005-04-23 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | |
| | 1) SHTS A6 & A6.1 - CHANGES TO THE |
| | EQUIPMENT SHOWN ON SHT A6, SHALL BE |
| | REFLECTED ON THE EQUIPMENT SCHEDULE SHT |
| | A6.1. SECTION 104.2.1. |
| | 2) SHT P-1 LATEST REVISION SHOWN IS |
| | REVISION #5. THERE ARE OTHER CHANGES |
| | WITH NO REVISION NUMBER SHOWN. PLEASE |
| | SHOW ALL REVISIONS WITH CLOUDS AND |
| | REVISION NUMBERS. SECTION 104.2.1. |
| | 3) SHT P-2 REVISION #7 WAS NOT FOUND. |
| | NUMEROUS UN-NUMBERED REVISIONS ON THE |
| | SHEET. SHOW REVISION NUMBER ON ALL |
| | CHANGES. SECTION 104.2.1. |
| | 4) SHT P-3 NO REVISION #5 FOUND. SOME |
| | CLOUDS WITH OUT NUMBERS. - RED LINE |
| | CHANGES TO GAS RISER & GAS NOTES ON THE |
| | PERMITTED SET OF PLANS WERE NOT SHOWN ON |
| | THE REVISION. THESE RED LINE CHANGES |
| | SHALL BE INCORPORATED INTO THE LATEST |
| | REVISION TO MAKE THE INFORMATION REFLECT |
| | WHAT WAS APPROVED. MAKE CHANGES PRIOR TO |
| | RESUBMITTING REVISIONS. SECTIONS 401.8 |
| | THRU 402.5.2 AND TABLES 402(1) THRU |
| | 402(34). |
| | 5) SHTS P-4 & P-5 NO REVISIONS WERE |
| | NOTED ON THESE SHEETS. DO NOT SUBMIT |
| | SHEETS WITHOUT REVISIONS AS A REVISION. |
| | SECTION 104.2.1. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |