| 2005-06-20 00:00:00 | |
| | PLEASE MAKE THE FOLLOWING CORRECTIONS |
| | FOR CODE COMPLIANCE AND RESUBMIT FOR |
| | REVIEW. |
| | |
| | 1} THE GENERATOR OUTPUT RATING FOR |
| | NATURAL GAS IS 125 AMPS IN THE |
| | SPECIFICATIONS. THE CALCULATIION FOR THE |
| | LOAD SERVED IS 170.4 AMPS. THE SYSTEM |
| | SHALL HAVE ADEQUATE CAPACITY AND RATING |
| | FOR THE SUPPLY OF ALL EQUIPMENT SERVED |
| | PER 702.5. |
| | |
| | 2} THE GROUNDING ELECTRODE CONDUTOR MUST |
| | BE CONTINUOUS PER 250.64(C), AND SIZED |
| | PER 250.66. THIS COMMENT WAS REDLINED ON |
| | THE ORIGINAL PLAN. THE #2 GEC TO THE |
| | COLD WATER BOND, AND THEN A SEPARATE #4 |
| | TO THE SUPPLEMENTARY ELECTRODE AND |
| | FOOTER STEEL IS IN VIOLATION. THE #2 |
| | CONTINUOUS GEC IS REQUIRED FOR THE |
| | SERVICE SIZE. |
| | PLEASE CORRECT. |
| | |
| | 3} PLEASE SHOW THE LOCATION OF ALL |
| | SERVICE EQUIPMENT AND GENERATOR |
| | EQUIPMENT ON THE PLAN. ATS, DISCONNECT, |
| | ETC. |
| | |
| | 4} PLEASE FIELD VERIFY THE LOCATION OF |
| | THE RECEPTACLE IN THE NORTH EAST WALL OF |
| | BEDROOM #2 AS IT DOES NOT MEET THE |
| | SPACING REQUIREMENTS OF ARTICLE |
| | 210.52(A)(1). THIS WAS REDLINED ON THE |
| | REVIEWED PLANS AS WELL. |
| | |
| | IF THERE ARE ANY QUESTIONS PLEASE CALL. |
| | |
| | BILL TROBAUGH |
| | ELECTRICAL PLAN REVIEW |
| | 561/805-6718 |
| | [email protected] |
| | FAX/:561/659-8026 |
| | |