2004-06-10 00:00:00 | DENIED: |
| 1.PLEASE PROVIDE MANUFACTURER |
| SUBMITTAL DATA FOR THE DRYERS.PLAN |
| SHEET M2 APPEARS TO HAVE TWO COMMERCIAL |
| DRYERS & DOMESTIC DRYERS ON THE 1ST & |
| 3RD FLOORS. |
| |
| 2.COMMERCIAL DRYERS SHALL COMPLY WITH |
| 2001 FBC(M) 504.7. |
| |
| 3.PLAN SHEET M1 MECHANICAL KEY NOTE |
| #10, INSTALL BOOSTER FAN ABOVE THE |
| CEILING.PROVIDE SUBMITTAL FOR THE |
| BOOSTER FAN.SHOULD BOOSTER FAN FAIL, |
| DRYER SHOULD NOT WORK. |
| |
| 4.PLAN SHEET M2 INDICATES 10" X 8" |
| DRYER EXHAUST RISER.PLEASE PROVIDE |
| DETAIL OF RISER.PER 2001 FBC(M) 607.4 |
| DUCTS THAT PENETRATE MORE THAN ONE |
| FLOOR SHALL BE PROTECTED BY A SHAFT |
| ENCLOSURE.WILL EACH DRYER RUN |
| INDIVIDUALLY TO THE ROOF IN THE SAME |
| RISE OR WILL A SUB-DUCT METHOD BE USED? |
| |
| 5.CLEANOUTS REQUIRED ON THE VERTICAL |
| RISERS PER 2001 FBC(M) 504.3. |
| |
| 6.DRYER INSTALLATIONS THAT EXHAUST |
| GREATER THAN 200 CFM, MAKE-UP AIR IS |
| REQUIRED. |
| |
| 7.PLAN SHEET M6 SINGLE EXHAUST RISER, |
| PLEASE CLARIFY FIRE DAMPER AT THE TOP, |
| IS THIS INTENDED AS A SUB-DUCT METHOD? |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE |
| CONTACT PATTY KRAUSS AT (561) 805-6719. |