| Date |
Text |
| 2004-06-10 00:00:00 | DENIED: |
| | 1.PLEASE PROVIDE MANUFACTURER |
| | SUBMITTAL DATA FOR THE DRYERS.PLAN |
| | SHEET M2 APPEARS TO HAVE TWO COMMERCIAL |
| | DRYERS & DOMESTIC DRYERS ON THE 1ST & |
| | 3RD FLOORS. |
| | |
| | 2.COMMERCIAL DRYERS SHALL COMPLY WITH |
| | 2001 FBC(M) 504.7. |
| | |
| | 3.PLAN SHEET M1 MECHANICAL KEY NOTE |
| | #10, INSTALL BOOSTER FAN ABOVE THE |
| | CEILING.PROVIDE SUBMITTAL FOR THE |
| | BOOSTER FAN.SHOULD BOOSTER FAN FAIL, |
| | DRYER SHOULD NOT WORK. |
| | |
| | 4.PLAN SHEET M2 INDICATES 10" X 8" |
| | DRYER EXHAUST RISER.PLEASE PROVIDE |
| | DETAIL OF RISER.PER 2001 FBC(M) 607.4 |
| | DUCTS THAT PENETRATE MORE THAN ONE |
| | FLOOR SHALL BE PROTECTED BY A SHAFT |
| | ENCLOSURE.WILL EACH DRYER RUN |
| | INDIVIDUALLY TO THE ROOF IN THE SAME |
| | RISE OR WILL A SUB-DUCT METHOD BE USED? |
| | |
| | 5.CLEANOUTS REQUIRED ON THE VERTICAL |
| | RISERS PER 2001 FBC(M) 504.3. |
| | |
| | 6.DRYER INSTALLATIONS THAT EXHAUST |
| | GREATER THAN 200 CFM, MAKE-UP AIR IS |
| | REQUIRED. |
| | |
| | 7.PLAN SHEET M6 SINGLE EXHAUST RISER, |
| | PLEASE CLARIFY FIRE DAMPER AT THE TOP, |
| | IS THIS INTENDED AS A SUB-DUCT METHOD? |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |
| | CONTACT PATTY KRAUSS AT (561) 805-6719. |