| Date |
Text |
| 2004-05-19 00:00:00 | 1) DURING THE PHASING OPERATION, ALL |
| | EXIT DOORS SHALL REMAIN CLEAR AND |
| | ACCESSIBLE. |
| | |
| | 2) NO BLOCKING OF ANY EXIT ACCESS, EXIT, |
| | OR EXIT DISCHARGE SHALL OCCUR. |
| | |
| | 3) ANY DEBRIS SHALL BE REMOVED FROM |
| | THE SITE DAILY. |
| | |
| | 4) DEMOLITION, RENOVATION, AND |
| | CONSTRUCTION SHALL COMPLY WITH NFPA 241. |
| | |
| | 5) NO UNAUTHORIZED CUTTING AND WELDING |
| | OPERATIONS SHALL BE PERFORMED. |
| | |
| | 6) ALL REQUIRED FIRE AND LIFE SAFETY |
| | SYSTEMS SHALL REMAIN OPERATIONAL AT |
| | ALL TIMES. |
| | |
| | 7) ANY USE OF FUEL POWERED EQUIPMENT |
| | MUST BE PROVIDED WITH PROPER |
| | VETILATION TO PREVENT THE ACCUMULATION |
| | OF CARBON MONOXIDE VAPORS. |
| | |
| | 8) WHAT SAEFGUARDS WILL BE TAKEN TO |
| | SEPARATE CONSTRUCTION FROM NON |
| | CONSTRUCTION AREAS. |
| | |
| | 9) NON FIRE RATED VISQUEEN SHALL NOT |
| | BE AFFIXED TO ANY WALLS OR CEILINGS. |
| | |
| | 10) PLEASE REVIEW FURNITURE LOBBY PLAN. |
| | IT APPEARS THAT TO MUCH FURNITURE MAY |
| | BE PRESENT. |
| | |
| | 11) PLEASE PROVIDE PRESCRIPTIVE |
| | STRENGTH REQUIREMENTS FOR ALL NEW |
| | HANDRAILS. |
| | |
| | 12) SEPARATE PLANS AND PERMITS REQUIRED |
| | FOR NEW FIRE ALARM EQUIPMENT. |
| | |
| | MIKE CARSILLO, ASSISTANT FIRE MARSHAL |
| | 835-2910 |