| 2004-06-01 00:00:00 | DENIED: |
| | 1. PERMIT APPLICATION INDICATES FUEL |
| | OIL PIPING & STORAGE.THE PLANS |
| | SUBMITTED WITH THE PERMIT APPLICATION |
| | ALSO INDICATES PLUMBING.PLEASE |
| | CLARIFY. |
| | |
| | 2. PLANS INDICATE 1,000 GALLON FUEL |
| | TANK STORAGE.PER 2001 FBC 308.2.1, |
| | FUEL OIL H3 SHALL HAVE A 4 HOUR |
| | SEPARATION BETWEEN STORAGE ROOM AND |
| | OTHER OCCUPANCIES PER TABLE 704.1.4 OF |
| | THE 2001 FBC. |
| | |
| | 3. PLEASE PROVIDE ADDTIONAL INFORMATION |
| | FORTHE VENTILATION FOR THE STORAGE ROOM. |
| | PLANS SHEET M2.43, INDICATES VEF-P.1-1 |
| | IS THIS FOR EXHAUST OR AIR MAKE-UP? |
| | PLEASE INDICATE VENTILATION RATE. |
| | SHOW TERMIATION OF VEF-P.1-1.INDICATE |
| | LOCATION OF FRESH AIR INTAKE. |
| | |
| | 4. PROVIDE MANUFACTURERS SUBMITTAL DATA |
| | FOR THE 1,000 GALLON FUEL TANK, DAY |
| | TANK & GENERATOR. |
| | |
| | 5. PER 2001 FBC(M) 1305.6, FILL PIPE |
| | SHALL TERMINATE OUTSIDE AT A POINT AT |
| | LEAST 2 FEET FOR ANY BUILDING OPENING. |
| | FILL OPENING SHALL HAVE A TIGHT METAL |
| | COVER DESIGNED TO PREVENT TAMPERING. |
| | |
| | 6. SHOP DRAWING #2 SHOWS A DETAIL FOR |
| | PIPING INSTALLED AT THE FLOOR OR WALL. |
| | PROVIDE DETAIL FOR THE PIPING INSTALLED |
| | AT THE CEILING.REFERENCE 2001 FBC(M) |
| | 305. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |
| | CONTACT PATTY KRAUSS AT (561) 805-6719. |