| Date |
Text |
| 2004-05-11 00:00:00 | PLUMBING PLAN REVIEW, DENIED.FBC 2001 |
| | |
| | 1) PLEASE ADJUST YOUR NOTES, DETAILS, OF |
| | SUBMITTALS TO REFLECT THE FOLLOWING IN- |
| | FORMATION REQUIRED FOR PLAN REVIEW |
| | (2) FBC-2001 424.2.9 WATER SUPPLY, LOCAL |
| | ORD. #2853-95, BACKFLOW REQUIRED ON |
| | WATER SERVICE. (ADD TO NOTES) |
| | 3) FBC-2001424.2.7.1 POOL CIRCULATING |
| | PUMPS SHALL BE EQUIPPED ON THE INLET |
| | SIDE WITH AN APPROVED TYPE HAIR AND |
| | LINTSTRAINER WHEN USED WITH A PRESSURE |
| | FIL- TER. (DETAIL OR ADD TO NOTES) |
| | (4)FS 471.023, FAC 61G15-23.002 |
| | NOTE: PLEASE NOTE, ALL PLANS DRAWN |
| | BY AN ARCHITECT/ENGINEER CONTAIN- |
| | -ING A TITLE BLOCK: MUST BE SIGNED, |
| | DATED AND SEALD BY THAT ARCH/ENG. |
| | PER FS 481.221 471.025 |
| | (5) SEC 104.6.5 BUILDING PERMIT VALUE. |
| | BASED ON TOTAL REPLACEMENT VALUE, TO |
| | INCLUDE STRUCTAL,ELECTRIC,PLUMBING,MECH- |
| | ANICAL,INTERIOR FINISH,NORMAL SITE WORK. |
| | ARCHITECTURAL,DESIGN FEES,AND PROFIT. |
| | EXCLUDING ONLY LAND VALUE. |
| | (6) SEC 424.2.12.1 PRESSURE TEST. |
| | PER MANFACTURE RECOMMENDATIONS, NO AIR |
| | TEST SHALL BE APPROVED FOR PVC PIPE AND |
| | FITTINGS. |
| | (7) SEC 424.2.13.2 JOINTS, CONNECTIONS, |
| | FBC SEC 605.21, PURPLE PRIMER REQUIRED |
| | ON PVC PIPING. |
| | END OF COMMENTS QUESTIONS 561-805-6692 |