| Date |
Text |
| 2004-05-12 00:00:00 | PLU,BING PLAN REVIEW,DENIED FBC 2001 |
| | 1) FBC-2001 424.2.9 WATER SUPPLY, LOCAL |
| | ORD. #2853-95, BACKFLOW REQUIRED ON |
| | WATER SERVICE. (ADD TO NOTES) |
| | 2 ) 61G1-16.004FL. ADMIN. CODE.PLANS |
| | PREPARED BY A REGISTERED ARCHITECT SHALL |
| | INCLUDE A TITLE BLOCK WHICH MUST: |
| | - STATE THE FIRM NAME, ADDRESS AND |
| | TELEPHONE NUMBER |
| | - STATE THE FIRM LICENSE NUMBER |
| | - STATE PROJECT NAME OR IDENTIFICATION |
| | - STATE DATE PREPARED |
| | - INCLUDE AN ORIGINAL SIGNATURE AND |
| | DATED SEAL |
| | - INCLUDE THE PRINTED NAME OF THE |
| | ARCHITECT SEALING THE PLANS |
| | (3) SEC 424.2.12.1 PRESSURE TEST. |
| | NO AIR TEST WILL BE APPROVED FOR PVC |
| | PIPE. |
| | (4) SEC 424.2.13.2 JOINTS, CONNECTIONS. |
| | PURPLE PRIMER, REQUIRED ON PVC PIPING. |
| | (5) SEC 104.6.5 BUILDING PERMIT VALUE. |
| | VALUATION BASED ON TOTAL REPLACEMENT |
| | VALUE.TO INCLUDE STRUCTAL, ELECTRICAL |
| | PLUMBING, MECHANICAL,INTERIOR FINISH, |
| | NORMAL SITE WORK,ARCHITECTURAL & DESIGN |
| | FEES, EXCLUDING ONLY LAND VALUE. |
| | (6) FPC 2001 SEC 310.3 CONNECTION TO |
| | THE DRAINAGE SYSTEM.SHT 1 VAC PCAK |
| | WASTE TO SANITARY SEWER. |
| | END OF COMMENTS QUESTIONS 561-805-6692 |