| Date |
Text |
| 2004-05-03 00:00:00 | PLUMBING PLAN REVIEW, DENIED FBC 2001 |
| | (1)SEC 104.6.5 BUILDING PERMIT VALUATION |
| | VALUATION BASED ON TOTAL REPLACEMENT VAL |
| | UE TO INCLUDE STRUCTAL, ELECTRIC,PLUMBIN |
| | G, MECHANICAL, INTERIOR FINISH, NORMAL |
| | SITE WORK, ARCHITECTURAL AND DESIGN FEES |
| | EXCLUDING ONLY LAND VALUE. |
| | (2) ADD THE FOLLOWING TO PLUMBING NOTES. |
| | SEC 424.2.6.6.5 WHERE PROVIDED, THE |
| | VACUM OR PRESSURE CLEANER FITTING SHALL |
| | BE LOCATED AT LEAST 6" AND NOT GREATER |
| | THAN 12" BELOW THE MINIMUM OPERATING |
| | WATER LEVEL, |
| | SEC 424.2.9 WATER SUPPLY, LOCAL ORDANCE |
| | #2853-95 BACK FLOW PREVENTER REQUIRED |
| | ON WATER SERVICE, PRIOR TO COMMENCING |
| | WORK. |
| | SEC 424.2.12.1 PRESSURE TEST. NO AIR |
| | TEST WILL BE APPROVED FOR PVC PIPE. |
| | SEC 424.2.13.2 JOINTS AND CONNECTIONS |
| | PURPLE PRIMER, REQUIRED ON PVC PIPING. |
| | SEC 424.2.14.2 WATER RETENTION, PROVIDE |
| | A POSITIVE MEANS OF RETAINING WATER IN |
| | THE HEATER WHEN THE PUMP IS SHUT OFF. |
| | SEC 424.2.14.4 CONNECTIONS, ALL WATER |
| | HEATING HEATING EQUIPMENT SHALL BE INSTA |
| | LLED WITH FLANGES OR UNION CONNECTIONS |
| | ADJACENT TO THE WATER HEATER. |
| | SEC 424.2.15 GAS PIPING, SEPERATE PLANS |
| | AND PERMIT REQUIRED. |
| | END OF COMMENTS QUESTIONS 561-805-6692 |