| Date |
Text |
| 2004-05-11 00:00:00 | FAILED: |
| | 1. SURVEYING SHEET MUST HAVE THE |
| | ORIGINAL RAISED SEAL AND SIGNATURE OF |
| | THE REGISTERED LAND SURVEYOR. |
| | 2. CIVIL PLANS MUST BE APPROVED FOR ALL |
| | THE CONNECTION TO THE CITY SERVICES BY |
| | THE PUBLIC UTILITIES & ENGINEERING, ATT: |
| | MANNY GONZALEZ, 659-8040. |
| | 3. WATER MAIN WITHIN PUBLIC R.O.W MUST |
| | BE DIP, AND PER CITY SPECIFICATION. |
| | 4. SEPARATION/ CLEARANCE AT CONFLICT |
| | POINT BETWEEN PIPES MUST BE PER CITY OF |
| | WPB STANDARD, P-1. |
| | 5. RECOMMENDED TO LOCATE THE FDC IN THE |
| | PROPOSED PLANTER AREA, PLEASE VERIFY. |
| | 6. SITE FOR ALL NEW COMMERCIAL BUILDING |
| | MUST BE DESIGNED PER CITY OF WPB |
| | CRITERIA FOR STORM WATER. |
| | 7. M.O.T PLAN MUST BE SUBMITTED TO THE |
| | PUBLIC UTILITIES & ENGINEERING FOR THEIR |
| | APPROVAL FOR ANY CONSTRUCTION WITHIN |
| | R.O.W PRIOR TO ANY CONSTRUCTION BEGINS. |
| | 8. SUBMIT PERVIOUS AND IMPERVIOUS AREA |
| | FOR ENTIRE SITE. |
| | 9. COVER FOR PUBLIC STORM WATER MANHOLE |
| | MUST HAVE CITY' LOGO. |
| | 10. PLEASE SHOW WHERE THE ST2-2, ST-2-3, |
| | ST-2-1 AS DETAILED ON SHEET C-4 ARE |
| | GOING TO BE USED. |
| | 11. CITY STANDARDS MAY BE OBTAIN FROM |
| | PUBLIC UTILITIES AND ENGINEERING. |
| | 12. PLEASE NOTE THAT THE PROPOSED SITE |
| | HAS NOT BEEN APPROVED BY PLANNING AND |
| | ZONING. |
| | IF ANY QUESTION PLEASE CONTACT 805-6723 |
| | MOHAMMAD R. AMINI |