| Plan Review Notes For Permit 04031591 |
| Permit Number |
04031591 |
|
| Review Stop |
G |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2007-12-04 17:36:47 | DENIED | | | REFERENCE: FBC-2001 FUEL GAS | | | | | | 1. SHT P4.16 SHOW THE LENGTHS OF PIPE FROM THE METER TO | | | THE FIRST 8'0" RISER AND SHOW THE LEGHTS OF PIPE FROM | | | THE 200'0" TO THE REGULATOR DOWNSTREAM OF ITEM (A). SO | | | THE TOTAL DEVELOPED LENGHT CAN BE VERIFIED. | | | | | | 2. SHT P4.1.6 SUBMIT THE COMPUTATIONS FOR THE EQUATION | | | USED TO SIZE THE PIPE PER SECTION 402.3 (2) SO THAT ALL | | | FIGURES AND OUTCOME CAN BE VERIFIED BY AN INDEPENDANT | | | ENGINEER. | | | | | | 3. SUBMIT THE CALCULATIONS TO AN INDEPENDENT ENGINEER | | | FOR VERIFICATION AND THEN RESUBMIT THE GAS REVISION | | | WITH THE INDEPENDENT ENGINEERS FINDINGSFOR REVIEW. | | | | | | 4. SHT P4.1.6 INDICATE THE MATERIAL FOR EACH SECTION OF | | | PIPE AS SOME OF THE PIPING WAS CHANGED FROM BLACK IRON | | | PIPE TO CSST PIPE. | | | | | | REVIEW BY KEN STEVENS | | | (561) 805-6721 | | | FAX (561) 805-6731 | | | E-MAIL [email protected] |
|