| Date |
Text |
| 2004-05-22 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 CHAPTER 1 |
| | |
| | A) COMMENTS FROM PREVIOUS REVIEW HAVE |
| | NOT BEEN ADDRESS. COMMENT NUMBER SHALL |
| | REMAIN THE SAME TO AVOID CONFUSION. |
| | 3) SHT A-3 SPECIFICATION WORK SHEETS RE- |
| | FERED TO BY DBPR STAMP (3) SHALL BE SUB- |
| | MITTED. 1 COPY WITH EACH SET OF PLANS. |
| | SECTION 104.2.1. |
| | 5) SHT A-3 S-13 GREASE INTECEPTOR NOT |
| | APPROVED UNDER SINK.(ALSO SEE SHEET P-3) |
| | ALSO PER RODNEY COMPO A SAMPLE POINT IS |
| | REQUIRED ON SANITARY BLDG DRAIN PRIOR TO |
| | DRAINING INTO TOILET ROOMS. (SEE ATTACH- |
| | ED SHEET). SHOW LOCATION OF SAMPLE POINT |
| | ON RISER DIAGRAM AND ON FLOOR PLAN. |
| | WASTE ORD. #2938-96. |
| | 7) SHT P-3 PLUMBING SPECIFICATIONS #7, |
| | AIR CHAMBERS ARE NOT APPROVED. DELETE |
| | FROM REFERENCE. PDI-WH 201/SECTION 604.9 |
| | *********WHEN RESUBMITTING PLANS******** |
| | PLEASE CLEARLY INDICATE THE REVISION AND |
| | REMOVE AND REPLACE ANY PAGES AS NECESS- |
| | ARY. SUBMIT (1) SET OF OLD DRAWINGS WITH |
| | THE PLANS WHEN RESUBMITTING PLANS. A |
| | TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION MADE, IDENTIFYING THE SHEET OR |
| | SPECIFICATION PAGE WHERE THE CHANGES CAN |
| | BE FOUND, WILL HELP TO EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | *******NOTE: NO NOT REMOVE SHT A3 OF 8 |
| | AS THIS SHEET HAS THE DBPR STAMP******** |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |