| Date |
Text |
| 2004-06-04 00:00:00 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL, BUILDING PLANS EXAMINER |
| | [email protected] |
| | |
| | 1.)SEE PREVIOUS LIST.DAVID |
| | LAWRENCE ARCHITECTURE INC. IS REQUIRED |
| | TO HAVE A CERTIFICATE OF AUTHORIZATION |
| | (SHEET 1).PLEASE PROVIDE.MASTERS |
| | CANNOT BE REDLINED, SEE SHEET 9.1 TITLE |
| | BLOCK. |
| | |
| | 2.)EMERGENCY ESCAPE SHALL BE PROVIDED |
| | DURING THE THREAT OF A STORM, TO BE |
| | PROVIDED ON THE FIRST FLOOR, FBC1005.4.5 |
| | THE IMPACT DOOR IS ON THE SECOND FLOOR. |
| | |
| | 3.)THE SHUTTER SCHEDULE AND KEY PLAN |
| | DO NOT CORRELATE WITH THE FLOOR PLAN. |
| | THE DOOR APPEARS TO BE IN THE WRONG |
| | LOCATION, 2ND FLOOR.EMERGENCY ESCAPE |
| | IS REQUIRED FBC1005.4.5. |
| | |
| | 4.)DO NOT STAPLE DIFFERENT PRODUCT |
| | APPROVALS TOGETHER.EACH PRODUCT |
| | APPROVAL SHOULD INCLUDE THE FLORIDA |
| | STATEWIDE, LOCAL OR SITE SPECIFIC WITH |
| | A TEST REPORT.SEE PREVIOUS LIST IN |
| | REGARDS TO THE ODL DOOR, STILL NO |
| | STATE APPROVAL SUBMITTED. |
| | |
| | 5.)THE STATE PRODUCT APPROVAL FOR |
| | THE MULLIONS IS PENDING.PLEASE PROVIDE |
| | A CURRENT (APPROVED STATUS) PRODUCT |
| | APPROVAL.ALSO THE DRAWINGS ARE FOR |
| | NORANDEX, NOT SIMONTON MULLIONS. |
| | |
| | 6.)PROVIDE A TITLE BLOCK FOR THE |
| | ENGINEER ON THE TRUSS LAYOUT PAGE. |
| | SEE DESIGN CRITERIA, MASTERS CANNOT BE |
| | REDLINED. |
| | |
| | 7.)TRUSS LOADING ON SHEET 3.1 |
| | CONFLICTS WITH THE ENGINEERING.REVISE |
| | EITHER THE PLAN OR THE TRUSS ENGINEERING |
| | SO THAT THE TWO ARE CONSISTENT. |