| 2004-04-21 00:00:00 | DENIED |
| | |
| | 1) ON SHEET A5 UNDER STRUCTURAL DESIGN |
| | CRITERIA THE MEAN ROOF HEIGHT IS LISTED |
| | AS + OR - 10 FEET. THE MEAN ROOF HEIGHT |
| | IS THE DISTANCE FROM GRADE TO THE |
| | AVERAGE HEIGHT OF THE HIGHEST ROOF |
| | HAVING A PITCH. FOR THIS STRUCTURE IT IS |
| | MORE THAN 10 FEET. PLEASE CORRECT. |
| | |
| | 2) SOME OF THE ANCHORS IN THE LEGEND ON |
| | SHEET A5 HAVE UPLIFT VALUES SPECIFIED |
| | WHICH INCLUDE THE ONE THIRD STRESS |
| | INCREASE IN THE STEEL CALCULATIONS, |
| | WHICH IS NOT ALLOWED BY FBC 1609.3. THE |
| | UPLIFT VALUES LISTED FOR ID TAG NUMBERS |
| | (1B) AND (2) FOR THE TA20R CONNECTORS |
| | ARE INCORRECT. SEE 2004 USP CATALOG FOR |
| | VALUES THAT DO NOT INCLUDE A STRESS |
| | INCREASE ON THE STEEL CALCULATIONS. |
| | |
| | 3) THE UPLIFT AND ANCHOR KEY IN THE |
| | ANCHOR LEGEND SPECIFIES THE UPLIFT |
| | VALUES ON THE BOTTOM AND THE ANCHOR ON |
| | TOP. HOWEVER, ON THE ROOF FRAMING PLAN |
| | THESE ITEMS ARE REVERSED IN THE ID TAGS. |
| | |
| | 4) THE STATE PRODUCT APPROVAL FOR THE |
| | HANSON ROOF TILE IS REQUIRED TO HAVE THE |
| | SBCCI PST AND ESI REPORTS SUBMITTED |
| | BECAUSE THEY WERE THE EVALUATION ENTITY |
| | USED FOR STATE APPROVAL. THE SUBMITTAL |
| | FOR THE MONIER LIFETILE IS OK. PLEASE |
| | SELECT THE ONE THAT WILL BE INSTALLED |
| | AND REMOVE THE OTHER FROM THE SUBMITTAL. |
| | |
| | 5) SUBMIT STATE PRODUCT APPROVALS FOR |
| | THE DOUBLE OUTSWING FRENCH DOORS WITH |
| | SIDELITES. THE PRODUCT APPROVAL FL 1433 |
| | THAT WAS SUBMITTED DOES HAVE THE TESTING |
| | REPORT (EVALUATION METOD) INDICATING THE |
| | DESIGN PRESSURES AND LIMITATIONS AND THE |
| | INSTALLATION INSTRUCTIONS. |
| | |
| | 6) SUBMIT STATE PRODUCT APPROVALS FOR |
| | IMPACT RATED ENTRY DOORS, WHICH IS |
| | REQUIRED FOR EMERGENCY EGRESS PER FBC |
| | 1005.4.5. |
| | |
| | 7) SUBMIT (2) COPIES OF THE RECORDED |
| | EASEMENT RELEASE FOR THE 2.5' SHOWN ON |
| | THE SURVEY IN A DRAINAGE EASEMENT. |
| | |
| | 8)SUBMIT STATE OR LOCAL PRODUCT APPROVAL |
| | FOR THE BUTT GLASS WINDOW. |
| | |
| | 9)SUBMIT STATE OR LOCAL PRODUCT APPROVAL |
| | FOR THE 12' STRUCTURAL MULLION BETWEEN |
| | THE FRENCH DOORS WITH SIDELITES AND THE |
| | TRANSOM ABOVE OR REVISE PLANS TO SHOW A |
| | BEAM OR LINTEL BETWEEN THE OPENINGS. |
| | |
| | 10) ONLY TWO COPIES OF SUBMITTAL ITEMS |
| | ARE REQUIRED. PLEASE REMOVE ALL EXTRA |
| | COPIES FROM THE PACKAGE. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CALL: |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |