Plan Review Notes
Plan Review Notes For Permit 04020930
Permit Number 04020930
Review Stop E
Sequence Number 3
Notes
Date Text
2005-01-31 00:00:00************ UNSAT ************
  
 1)NOTE: PLEASE SUBMIT TWO COPIES OF
 MANUFACTURE SPECS FOR GENERATOR/TRANSFER
 SWITCH ETC.
 PLEASE SEE ZONING NOTES FOR SURVEY AND
 SET BACKS.
 ONLY ONE COPY OF SURVEY SUBMITTED.
  
 2)NOTE: PLEASE SEE 700.6 FOR TRANSFER OF
 POWER FOR EM POWER. TRANSFER OF POWER
 SHOWN ON RISER IS NOT PERMITTED.
 A FAIL SAFE MANNER IS REQUIRED.
  
 3)NOTE: PLEASE SEE BLDG C.O. HAS BEEN
 REVOKED AND DATE REMOVED. PLEASE SEE NOT
 ONLY DO PLANS NEED TO BE REVISED, BUT
 THERE MAY BE A NEED FOR A RE-INSPECTION
 OF ELECTRICAL EQUIPMENT/SET BACK ETC.
  
 4)NOTE: PLEASE SEE MECH NOTES, FOR
 GENERATOR TO BE A MIN OF 10' FROM
 OPENINGS.
  
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved