| Date |
Text |
| 2004-02-20 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | |
| | 1) PLANS SHALL BE ROUTED TO THE DEPT. OF |
| | BUSINESS REGULATION HOTEL AND RESTURANT |
| | DIVISION. PLANS SHALL BE STAMPED AND |
| | WORK SHEET ATTACHED PRIOR TO RESUBMITT- |
| | ING TO CITY WPB FOR REVIEW. |
| | 2) SHT A-1 TOILET ROOM NOT LARGE ENOUGH. |
| | SUBMIT A DETIAL SHOWING COMPLIANCE WITH |
| | SECTION 11-4.16 AND ALL SUBSECTIONS, |
| | SECTION 11-4.19 AND ALL SUBSECTIONS, AND |
| | SECTION 11-4.22 AND ALL SUBSECTIONS. |
| | 3) SHT P-1 WATER HEATER DETAIL, THERMAL |
| | EXPANSION CONTROL REQUIRED PER SECTION |
| | 607.3.2 BECAUSE AN RPZ BACKFLOW IS RE- |
| | QUIRED. |
| | 4) SHT P-1 GREASE RISER DIAGRAM. THE |
| | DRAINAGE FROM THE STEAM TABLE SHALL |
| | DRAIN INTO A FLOOR SINK. FLOOR DRAINS |
| | ARE NOT AN APPROVED INDIRECT WASTE |
| | RECEPTOR. SECTION 802.3 |
| | 5) SHT P-1 INDICATE WALL AND FLOOR |
| | THICKNESS FOR GREASE INTECEPTOR. SEE |
| | ATTACHED SHEET FOR WPB STANDARD FOR |
| | GREASE INTERCEPTORS. |
| | 6) THE FOLLOWING INFORMATION IS REQUIRED |
| | FOR GAS PERMIT. |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2001 |
| | FUEL GAS CODE. |
| | B. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE IF BEING USED. |
| | C. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2001 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.5.2 AND TABLES 402(1) THRU |
| | 402(34). - TOTAL ON PLAN SHOWS 1,105K, |
| | BUT ADDING UP BTU'S ON RISER DIAGRAM |
| | ADDS UP TO 1,080K. PLEASE CLAIRFY |
| | D. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2001 FUEL GAS CODE SEC. 402.2. |
| | E. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2001 FUEL GAS CODE SEC 402.2 |
| | ALL GAS APPLIANCES SHALL SHOW A LISTING |
| | BY AN APPROVED TESTING AGENCY ON MANUF. |
| | SHEETS. |
| | F. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | G. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND |
| | APPURTENANCES PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | H. EMERGENCY HOOD SHUT DOWN SHUT OFF |
| | VALVE TO BE BELOW CEILING. MANUAL SHUT |
| | OFF VALVE TO BE UPSTREAM. UNION TO BE |
| | DOWN STREAM OF MANUAL VALVE. |
| | 7) GREASE INTECEPTOR SHALL BE SIZED BY |
| | RODNEY COMPO, ENVIRONMENTAL COMPLIANCE. |
| | WASTE ORD. #2938-96- (561) 837-4074. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |