2004-02-20 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
  
 1) PLANS SHALL BE ROUTED TO THE DEPT. OF
 BUSINESS REGULATION HOTEL AND RESTURANT
 DIVISION. PLANS SHALL BE STAMPED AND
 WORK SHEET ATTACHED PRIOR TO RESUBMITT-
 ING TO CITY WPB FOR REVIEW.
 2) SHT A-1 TOILET ROOM NOT LARGE ENOUGH.
 SUBMIT A DETIAL SHOWING COMPLIANCE WITH
 SECTION 11-4.16 AND ALL SUBSECTIONS,
 SECTION 11-4.19 AND ALL SUBSECTIONS, AND
 SECTION 11-4.22 AND ALL SUBSECTIONS.
 3) SHT P-1 WATER HEATER DETAIL, THERMAL
 EXPANSION CONTROL REQUIRED PER SECTION
 607.3.2 BECAUSE AN RPZ BACKFLOW IS RE-
 QUIRED.
 4) SHT P-1 GREASE RISER DIAGRAM. THE
 DRAINAGE FROM THE STEAM TABLE SHALL
 DRAIN INTO A FLOOR SINK. FLOOR DRAINS
 ARE NOT AN APPROVED INDIRECT WASTE
 RECEPTOR. SECTION 802.3
 5) SHT P-1 INDICATE WALL AND FLOOR
 THICKNESS FOR GREASE INTECEPTOR. SEE
 ATTACHED SHEET FOR WPB STANDARD FOR
 GREASE INTERCEPTORS.
 6) THE FOLLOWING INFORMATION IS REQUIRED
 FOR GAS PERMIT.
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE.
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE IF BEING USED.
 C. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2001 FUEL GAS CODE SECS. 401.8
 THRU 402.5.2 AND TABLES 402(1) THRU
 402(34). - TOTAL ON PLAN SHOWS 1,105K,
 BUT ADDING UP BTU'S ON RISER DIAGRAM
 ADDS UP TO 1,080K. PLEASE CLAIRFY
 D. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC. 402.2.
 E. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2
 ALL GAS APPLIANCES SHALL SHOW A LISTING
 BY AN APPROVED TESTING AGENCY ON MANUF.
 SHEETS.
 F. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
 G. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND
 APPURTENANCES PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
 H. EMERGENCY HOOD SHUT DOWN SHUT OFF
 VALVE TO BE BELOW CEILING. MANUAL SHUT
 OFF VALVE TO BE UPSTREAM. UNION TO BE
 DOWN STREAM OF MANUAL VALVE.
 7) GREASE INTECEPTOR SHALL BE SIZED BY
 RODNEY COMPO, ENVIRONMENTAL COMPLIANCE.
 WASTE ORD. #2938-96- (561) 837-4074.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]