Plan Review Notes
Plan Review Notes For Permit 04020284
Permit Number 04020284
Review Stop E
Sequence Number 1
Notes
Date Text
2004-02-20 00:00:00************** UNSAT *************
  
 PLEASE NOTE: SCOPE OF WORK ON ONE APPLI-
 -CATION INCLUDES BOTH PHASES, THIS WILL
 PREVENT ONE OF THE BLDGS FROM BEING CO'D
 IF FINISHED FIRST.
 IF ONE MAY BE FINISHED BEFORE THE OTHER
 SEPARATE PERMIT APPLICATIONS MAY BE A
 THOUGHT. FYI
  
 ********* PHASE 1 ***********
  
 1)NOTE: PLEASE SHOW AND INCLUDE SIZE
 OF CONDUCTORS FROM MAIN TO PANEL.310.16
 PLEASE ALSO INCLUDE EQUIPMENT GROUNDING
 CONDUCTOR. 250.24, SIZE PER 250.122
  
 2)NOTE: PLEASE PROVIDE NOTE FOR USE
 OF "FUTURE" EQUIPMENT?
  
 3)NOTE: PLEAESE INCLUDE NAMES AND ALL
 LICENSE #'S ON TITLE BLOCK(S).
 PLEASE SEE 61G15-23.002 (ENGS) 61G1-16.
 004 (ARCHS).
 PLEASE INCLUDE REQ'D CERT OF AUTH #S/
 FIRM LICENSE # FOR ARCHITECURE FIRM.
 THIS IS REQ'D ON ALL SHEETS, ALL TRADES,
 AND ALL TITLE BLOCKS FOR ENINEERS, ARCH'
 S. (SITE ALSO). PLEASE SEE FS 481.219
 FOR ARCHS.
 SINGLE ENG IS NOT REQ'D TO HAVE CA#,
 BUT MUST PROVIDE OTHER INFORMATION.
  
 ****** PHASE 2 *****************
  
 1)NOTE; PLEASE SEE NOTE:3 FROM PHASE
 1 COMMENTS.
  
 2)NOTE: PLEASE SHOW ALL CONTINUOUS LOADS
 @125% 215.3,230.42 FOR BOTH PHASES.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved