| 2004-09-21 00:00:00 | REVISISON DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | |
| | A) SHT P-9 FROM PREVIOUS REVIEW: |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2001 |
| | FUEL GAS CODE.- MANY LENGTHS ARE NOT |
| | SHOWN FOR CUT SECTIONS OF PIPES. SEE |
| | RED LINE MARKS FOR SECTIONS WITH NO |
| | LENGTHS SHOWN, |
| | 2) SHT P-10 REVISION #4 NOT FOUND. |
| | PLEASE CLAIRFY. SECTION 104.2.1 |
| | 3) SHT P10 NEW EMERGENCY OVERFLOW DRAINS |
| | SHOWN ON REVISIONS ARE NOT APPROVED. |
| | ROOF DRAINS L1, L2, L5, L6, & L7 REQUIRE |
| | 50.24 SQ IN, TWO 6" DRAINS PROVIDE 56.54 |
| | SQ IN. BUT FOUR 3" DRAINS ONLY PROVIDE |
| | 28.26 SQ IN. - EMERGENCY OVERFLOW DRAINS |
| | FOR L3, & L4 REQUIRE 28.26 SQ IN, BUT |
| | TWO 3" DRAINS ONLY PROVIDE 14.13 SQ IN. |
| | SECTION 1107 |
| | 4) FROM PREVIOUS REVIEW: THE CLEANOUTS |
| | REQUIRED IN SECTION 708.3.1 ARE NOT TO |
| | BE DELETED. NO EXCEPTION TO THIS SECTION |
| | IS NOTED IN THE CODE. |
| | 5) VACUUM RELIEF VALVES REQUIRED BY SEC- |
| | TION 504.2 ARE NOT SHOWN IN THE PROPER |
| | LOCATION. THESE VALVES SHALL BE LOCATED |
| | ON THE SUPPLY SIDE OF THE HEATER AND BE |
| | ABOVE THE TOP OF THE HEATERS. WATER |
| | HEATERS ONE AND TWO SHOW THEM INSTALLED |
| | ON THE HOT WATER SIDE. WATER HEATER |
| | THREE AND THE STORAGE TANK HAVE NO VAC- |
| | UUM RELIEF VALVES SHOWN. WILL WATER |
| | HEATERS ONE AND TWO BE INSTALLED STACKED |
| | AS SHOWN? WATER HEATERS SHOULD BE INST- |
| | ALLED SO THAT THEY ARE PIPED IN PARALLEL |
| | AND THE SUPPLY AND HOT WATER TIE IN THE |
| | CENTER OF THE HEATERS SO THEY HEAT AND |
| | ARE USED SIMULTAINIOUSLY. SECTION 104.2. |
| | 1. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |