Plan Review Notes
Plan Review Notes For Permit 04010749
Permit Number 04010749
Review Stop P
Sequence Number 2
Notes
Date Text
2004-03-15 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
 FBC-2001 CHAPTER 11
  
 A) FOLLOWING COMMENTS WERE NOT ADDRESSED
 OR COMMENT RESPONSE WAS NOT FOUND OR NOT
 ADDRESSED PROPERLY. THE COMMENT NUMBER
 FROM FIRST REVIEW WILL BE SHOWN TO AVOID
 CONFUSION.
 2) SHOW COMPLIANCE WITH SECTION 11-9.1.3
 ACCOMMODATIONS FOR PERSONS WITH HEARING
 IMPAIRMENT. - RESPONSE NOTED - FOUND 4
 UNITS PLUS ONE ACCESSIBLE UNIT WITH THIS
 ACCOMODATION. ONE ADDITIONAL UNIT WILL
 BE REQUIRED SEPARATE FROM ACCESSIBLE
 UNITS PER SECTION11-9.1.3
 4) SHT A-5 SUBMIT CALCULATIONS FOR LOWER
 ROOFS PER SECTION 1106 AND ALL SUBSECT-
 IONS. SHOW 1/2 AREA OF VERTICAL WALL
 ADDED TO SQUARE FOOTAGE OF ROOF IN CAL-
 CULATIONS. - NO CALCULATIONS WERE FOUND
 IN MECHANICAL PLANS. INDICATE SPECIFIC
 SHEET RESPONSE IS LOCATED. - PER CONVER-
 SATION WITH STEVE SHEET P-16 WILL BE
 SUBMITTED WITH THIS INFO.
 5) SUBMIT CALCULATIONS FOR PRIMARY AND
 SECONDARY ROOF DRAINS PER SECTIONS 1106
 AND 1107 AND ALL SUBSECTIONS. - RESPONSE
 TO SCUPPER COMMENT SEEN - BLDG OFFICIAL
 THINKS THAT IT WILL BE A LEAK PROBLEM.
 HE SAYS THAT A TROUGH MAY BE A BETTER
 SOLUTION. SUBMIT A DETAIL WITH MEASURE-
 MENTS SHOWING COVERAGE OF 6" PIPE ECT IF
 THIS IS THE SECONDARY DRAIN STILL WANTED
 6) SHTS A-27 & A-28 SHOW MEASUREMENTS
 FOR FIXTURES PER SEC'S 11-4.15, 11-4.16,
 11-4.18, 11-4.19, & 11-4.23 AND ALL SUB-
 SECTIONS. SHOW CLEAR FLOOR SPACE FOR ALL
 ACCESSIBLLE FIXTURES INCLUDING DRINKING
 FOUNTAINS, URNALS ECT. - RESPONSE NOTED
 SOME CLEAR FLOOR SPACES NOT SHOWN. ROOM
 117 EMPLOYEE LOUNGE SHOW CLEAR FLOOR
 FOR SINK. SHT A-12 KING DELUX ACCESSIBLE
 SHOW 5' TURNING AREA. SHT A-11 SHOW
 CLEAR FLOOR SPACE AT DRINKING FOUNTAINS.
 SHT A-15 SHOW CLEAR FLOOR SPACE FOR THE
 URINAL ROOM 114.
 10) SHT P-9 SEPARATE GAS PERMIT REQUIRED
 FOLLOWING INFORMATION REQUIRED FOR THE
 GAS PERMIT.
 B) SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED.- NO MATERIAL FOR PIPE LOCATED
 C) SUBMIT CALCULATIONS FOR COMBUSTION
 AIR PER FBC-2001 FUEL GAS CODE SECTION
 304. - RESPONSE NOTED. SHT M-1 CALCULAT-
 IONS INDICATE 2 DRYERS, BUT SHT P-9 GAS
 RISER SHOWS 3 DRYERS @ 165K BTU'S EACH
 PLEASE CLAIRFY. - ALSO 124 SQUARE INCHES
 IS REQUIRED AT DRYER IF VERTICAL DUCT
 BUT IF HORIZONTAL DUCT 247.5 SQ IN REQD.
 10" DUCT VERT WILL SUPPLY 78.5 SQ. IN.
 PLEASE SUBMIT DETAIL FOR DUCT. INDICATE
 IF VERTICAL OR HORIZONTAL, AND IF AIR
 IS OUTSIDE OR INSIDE AIR SUPPLYING THE
 COMBUSTION AIR. - SHOW COMBUSTION AIR
 CALCULATIONS FOR THE 80K BTU'S IN THE
 GUEST LAUNDRY ROOM.
 E) SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2- RE-
 SPONSE NOTED, BUT NO MANUF. SHEETS WERE
 FOUND IN MECH. SHEETS.
 12) SHT P-10 ROOF DRAIN AND SQUARE FOOT-
 AGE NOT SHOWN FOR ROOF BELOW AT ENTRANCE
 16) LOCATION OF WATER HAMMER ARRESTORS
 SHALL BE NEAR THE FIXTURES IN AN
 "EFFECTIVE RANGE" NOT IN CEILING AS
 SHOWN. PDI-WH 201 AND MANUF. INSTALL.
 INSTRUCTIONS.
 17) SHT P-14 VACUUM RELIEF VALVES REQUI-
 RED FOR BOTTOM FED WATER HEATERS. SEC
 504.2 - RESPONSE NOTED, BUT THIS HAS NOT
 BEEN ADDRESSED.
 18) WATER HAMMER ARRESTORS SHALL BE
 LOCATED NEAR FIXTURE NOT IN CEILING.
 PDI-WH 201 AND MANUF. INSTALL. INSTRUCT.
 19) SEE COMMENTS 16 & 18.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved